Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; HB 1004 En
Indian Coast Guard
SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 1 May
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - HC 546; HB 1004 Entire
superstructure Area 50Sqmtr to be painted as per paint
scheme including area above water line to be painted using
Ms Akzonoble makes paint Wanda 2.. , Repair, Maintenance,
and Installation of Plant/ Systems/Equipments (Version 2) -
HC 546; HB1005 Renew rubber beading of 03 in nos water
tight doors and 02 hatch and chalk test to be carried out
Material yard supply Beading Mat EPDM rubber length 1.. ,
Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - HC 546; HA 1006 Door
and hatches 03 Nos Hatches and 03 Nos doors holding
arrangement of Bridge Crew cabin DA Compartment Engine
room compartment and boatswain store defe.. , Repair,
Maintenance, and Installation of Plant/ Systems/Equipments
(Version 2) - HC 546; HB 1008 Clean the bilges of main
engine DA compartment Boatswain store and night Cabin
Void space thoroughly inspect the structure to main engine
foundation for .. , Repair, Maintenance, and Installation of
Plant/ Systems/Equipments (Version 2) - HC 546; HB 1012
Wooden panelling of Bulkhead including lane at Crew cabin
Bridge and Wc area deformed uprooted Same to be
renewed as per samples Mat fire proof plywood A.. , Repair,
Maintenance, and Installation of Plant/ Systems/Equipments
(Version 2) - HC 546; HB 1020 Entire inner compartment
wood polishing to be carried out for smoothness MatYard
supply All in way jobs included; Service Provider , Repair,
Maintenance, and Installation of Plant/ Systems/Equipments
(Version 2) - HC 546; EA 3003 Following job to be carried
out in AC system Post completion of jobs AC plant to be
proved for satisfactory operation and performance a
Overhaul sea wat.. , Repair, Maintenance, and Installation of
Plant/ Systems/Equipments (Version 2) - HC 546; EA 3011
GEAR BOX 02 NOS Make Twin Disc Model MG 5082A Ratio 2
05 1 Following jobs to be carried out in both Gear Boxes :
Mat/Spares yard supply a Retighte.. , Repair, Maintenance,
and Installation of Plant/ Systems/Equipments (Version 2) -
HC 546; EA 3007 MOTOR DRIVEN FIRE PUMP Make Flow
Chem Model FPE SJ 40 110 Following jobs to be carried out
in Fire pump System Mat Spares yard supply a Overhau.. ,
Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - HC 546; LA 5001 MAIN
SWITCH BOARD 03 NOS Clean all contacts with CTC and
overhaul the complete 03 Nos Main switch boards general
230V AC 24V DC Main Navigation Panel D.. , Repair,
Maintenance, and Installation of Plant/ Systems/Equipments
(Version 2) - HC 546; LA-5002 EXHAUST FANS 03 NOS Make
Crompton Greaves Model CGFA233514S3 02 No 075 Kw
CGFA232014S1 01 No 1 Kw Exhaust fans 03 Nos overhaul
motors and replace beari.. , Repair, Maintenance, and
Installation of Plant/ Systems/Equipments (Version 2) - HC
546; LA 5004 BATTERY CHARGER 02 NOS Overhaul the
battery chargers renew defective components Calibrate 01
in No Ammeter and provide calibration certificate Material..
, Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - HC 546; LA 5014 FIRE
DETECTION SYSTEM ZEAL MARKETING Overhaul the main
unit, check the functionality of all sensors Heat detector 03
Nos Smoke detector 02 Nos Manual cal..
Deadline
7 May 2025