SOIL INVESTIGATION,SEISMIC ANALYSIS,LABORATORY TEST,ATTERBERGS LIMIT,NATURAL WATER CONTENT,BULK AND
Hindustan Petroleum Corporation Ltd
KOLKATA, WEST BENGALPosted 16 Dec
EMD: ₹12.1 L
GEMGoods4 Documents
Category: SOIL INVESTIGATION , SEISMIC ANALYSIS , LABORATORY
TEST , ATTERBERGS LIMIT , NATURAL WATER CONTENT ,
BULK AND DRY DENSITY , SGVR , SIEVE ANALYSIS ,
SHRINKAGE LIMIT , CORE RECOVERY , POINT LOAD TEST ,
GEO TECHNICAL INVESTIGATION , DRILLING THROUGH
ROCK OR BOULDER STRATA , BORING , CROSSING SURVEY ,
CROSSING SURVEY RAIL , PERMISSION RAILWAY ,
PERMISSION NH , PERMISSION NH CROSSING , SH ALONG
PERMISSION , SH CROSSING , PERMISSION CANAL ,
PERMISSION RIVERS , WATER BODIES PERMISSION , GRAM
PANCHAYAT ROAD PERMISSION , PERMISSION
DEVELOPMENT AUTH , ANY AUTHORITY PERMISSION ,
IDENTIFICATION , REGISTRATION , CHANGE OF LAND USE ,
LAND ACUITISTION ON LEASE , MUNICIPAL PERMISSION ,
SOCIAL FOREST PERMISSION , PERMISSION PROTECTED OR
RESERVE FOREST , POLLUTION CONTROL BOARD
PERMISSION , OBTANING POWER CONNECTION ,
RECONNAISSANCE SURVEY , DETAILED SURVEY ,
CORROSION SURVEY , AREA SURVEY MDPE , DM NOC FOR
STATION , BASIC PESO APPROVAL , FINAL PESO APPROVAL
LICENSE , FACTORY LICENSE , FIRE LICENSE , BUILDING
PLAN APPROVAL , DEMAND FEASIBILITY , INDUSTRIAL AND
COMMERCIAL DEMAND FEASIBILITY , PWD PERMISSION ,
NHAI PERMISSION , FOREST PERMISSION FOR STATION ,
MDPE PIPELINE LAYING LIASONING , CADASTRAL SURVEY
Deadline
6 Jan 2025