Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Dis
N/a
BAREILLY, UTTAR PRADESHPosted 6 Aug
₹20.0 L
EMD: ₹2,000
GEMService5 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Dismantling Loading and Unloading of 01 Nos Old Quad Body 650 square meter Heating Surface Complete with Piping Pump Motor Valves from Majhola Pilibhit S.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Dismantling Loading Unloading of 01 Nos Old Quad Body 490 square meter heating surface with Calandria Pipes Pump Motor Valves from Majhola Pilibhit Sugar.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Fabrication two Coat Priming Internal External Cleaning Repair Erection of 04 Columns Structure Beams and 02 Nos Quad Bodies including Saveall and Calandr.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Dismantling 03 Nos 600mm R A Steam Valves from Majhola Sugar Mill, Modifying Steam Vapor Pipes and Fitting Them in Existing Body; As per Specification , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Erection Fitting Fabrication of 650 square meter heating surface Quad Body with Calandria Pipes Pumps Valves and Platforms Ladders Railings; As per Specif.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Erection Fitting Fabrication of 490 square meter heating surface Quad Body with Calandria Pipes Pumps Valves Platforms and Interconnections to Old Quad; A.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Structural Repairs with MS Plates Fabrication Erection and Fitting of Vapor Pipes MS Bends Flanges Condensate Pots Pump Beds and Jackets; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Hydraulic Testing up to 60 PSI of 02 Nos Quad Bodies Calandria Tube Replacement Leak Proofing and Fitting Ammonia Lines with Valves; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Fabrication and Erection of MS Chemical Soda Tank with Drive Arm Shaft Motor Gear Pumps Valves Piping and Platforms with Railings; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Erection and Fitting of 500mm RA Vapor Bleeding Connection with Pipes and Valves for 650 square meter heating surface Quad 1st Body Existing 1st Body; Ser.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Fabrication and Erection of Platforms Ladders and Railings for Manholes Steam Vapor Valves and Tube Cleaning Motors including Modifications; Service Provi..
Deadline
17 Aug 2026