Oceanographic survey and submission of report as per Annexure 1 Section A,Engineering Design Fabric
National Institute Of Ocean Technology (niot)
KANCHIPURAM, TAMIL NADUPosted 13 Mar
EMD: ₹9.5 L
GEMGoods4 Documents
Category: Oceanographic survey and submission of report as per
Annexure 1 Section A , Engineering Design Fabrication
drawings selection of Components towing installation and
deployment methodology detailed design report submission
as per Annexure 1 Section B to H , Supply of Power Take Off
system PTO as per Annexure 1 Section C , Supply of floating
platformand mooring system to the site As per Annexure 1
Section D , Assembly, integration and commissioning of the
unit As per Annexure 1 Section E , All risk insurance for the
men and materials till completion of commissioning As per
Annexure 1 section F , Transportation for men and materials
including transit insurance As per Annexure 1 Section G ,
Operation and maintenance charges period for 1st year As
per Annexure 1 Section H , Operation and maintenance
charges period for 2nd year As per Annexure 1 Section H
Deadline
4 Jun 2026