Design, build, construct, install and commissioning of Material Recovery Facility (MRF) of 50 TPD for Dry Waste along with operation and maintenance of the plant for five years on EPC mode of Nagar Parishad Siwan
Organization Not Specified
BIHARPosted 16 Apr
₹11.2 Cr
EMD: ₹22.5 L
EPROCURE-BIHAR6 DocumentsOpen
Deadline
27 Apr 2026