TenderDekho Logo
Tender News · Mining TechnologyDeadline: 2026-09-07

Coal India Invites Bids for ₹627.77 Crore Mass Production Mining Technology Tender in Korea, Chhattisgarh

TenderDekho Desk2 min read KOREA
Coal India Invites Bids for ₹627.77 Crore Mass Production Mining Technology Tender in Korea, Chhattisgarh
500Cr+CHHATTISGARH

Coal India Limited has issued a ₹627.77 crore tender for mass production mining technology services on a per metric tonne basis in Korea, Chhattisgarh. The project aims to introduce advanced underground mining methods to boost coal extraction efficiency.

Key Takeaways

  • Coal India Limited has floated a ₹627.77 crore tender for mass production mining technology services.
  • The project is located in Korea, Chhattisgarh, under South Eastern Coalfields Limited.
  • Scope includes deployment of mass production technology for underground mining on a per metric tonne basis.
  • Total quantity to be covered is 5,575,500 metric tonnes.
  • Bidders must submit an EMD of ₹50 lakh.
  • Tender documents are available on the GEM procurement portal.
  • Bid submission deadline is 7 September 2026.

Coal India Limited, under the Ministry of Coal, has announced a major tender valued at ₹627.77 crore for mass production mining technology services in Korea, Chhattisgarh. The initiative is managed by South Eastern Coalfields Limited and aims to modernise underground coal mining operations.

The contract seeks to introduce advanced mass production technology, such as the deployment of standard height continuous miner packages or other suitable solutions, to enhance coal extraction on a per metric tonne basis. This move is expected to significantly improve operational efficiency in one of India's key coal-producing regions.

Scope of Work

  • Provision of mass production mining technology services for underground mining on a per metric tonne basis.
  • Introduction of any mass production technology, including deployment of standard height continuous miner packages on a hiring basis.
  • Open to other suitable underground mining technologies as per project requirements.
  • Total mining quantity covered under the contract is 5,575,500 metric tonnes.
  • Project location is Korea, Chhattisgarh, under the jurisdiction of South Eastern Coalfields Limited.
  • Contract managed by Coal India Limited, Ministry of Coal.

Key dates, EMD, and fee details for interested bidders are as follows:

Tender Summary

Estimated value₹627.77 Cr
EMD₹50.00 L
AuthoritySouth Eastern Coalfields Limited
LocationKOREA, CHHATTISGARH
SectorIndustrial Corridors & Logistics
Posted on2026-07-28
Bid deadline2026-09-07
Procurement sourceGEM

How to Apply

  1. 1

    Access the tender documents and application process via the GEM procurement portal.

  2. 2

    Prepare and submit bids according to the specifications outlined for mass production mining technology services.

  3. 3

    Deposit an Earnest Money Deposit (EMD) of ₹50 lakh as part of the bid submission.

  4. 4

    Ensure bid validity for 180 days as per tender requirements.

  5. 5

    Submit completed bids before the deadline on 7 September 2026.

Why It Matters

This tender marks a significant step towards modernising underground coal mining in Korea, Chhattisgarh, by introducing advanced mass production technologies. The project is poised to enhance coal extraction efficiency and support India's growing energy needs through improved mining practices.

Interested contractors and technology providers should review the tender details on the GEM portal and prepare their submissions ahead of the 7 September 2026 deadline. Timely participation is essential to be considered for this high-value mining technology contract.

Frequently Asked Questions

What is the last date to submit bids for the mass production mining technology tender in Korea, Chhattisgarh?
The bid submission deadline is 7 September 2026.
What is the EMD amount for the Coal India mass production mining technology tender in Korea, Chhattisgarh?
The Earnest Money Deposit (EMD) required is ₹50 lakh.
Is there a tender fee for the mass production mining technology tender in Korea, Chhattisgarh?
No tender fee is specified for this tender.
How can I apply for the mass production mining technology tender by Coal India in Korea, Chhattisgarh?
Bidders must apply through the GEM procurement portal as specified in the tender notice.
What is the total quantity covered under the mass production mining technology tender in Korea, Chhattisgarh?
The contract covers a total quantity of 5,575,500 metric tonnes.
Who is the issuing authority for the mass production mining technology tender in Korea, Chhattisgarh?
The issuing authority is Coal India Limited under the Ministry of Coal, managed by South Eastern Coalfields Limited.
What is the bid validity period for the Coal India mass production mining technology tender in Korea, Chhattisgarh?
The bid validity period is 180 days.
Where is the project location for the mass production mining technology tender by Coal India?
The project is located in Korea, Chhattisgarh, with the postal code 497331.