Coal India Invites Bids for ₹627.77 Crore Mass Production Mining Technology Tender in Korea, Chhattisgarh

Coal India Limited has issued a ₹627.77 crore tender for mass production mining technology services on a per metric tonne basis in Korea, Chhattisgarh. The project aims to introduce advanced underground mining methods to boost coal extraction efficiency.
Key Takeaways
- ✓Coal India Limited has floated a ₹627.77 crore tender for mass production mining technology services.
- ✓The project is located in Korea, Chhattisgarh, under South Eastern Coalfields Limited.
- ✓Scope includes deployment of mass production technology for underground mining on a per metric tonne basis.
- ✓Total quantity to be covered is 5,575,500 metric tonnes.
- ✓Bidders must submit an EMD of ₹50 lakh.
- ✓Tender documents are available on the GEM procurement portal.
- ✓Bid submission deadline is 7 September 2026.
Coal India Limited, under the Ministry of Coal, has announced a major tender valued at ₹627.77 crore for mass production mining technology services in Korea, Chhattisgarh. The initiative is managed by South Eastern Coalfields Limited and aims to modernise underground coal mining operations.
The contract seeks to introduce advanced mass production technology, such as the deployment of standard height continuous miner packages or other suitable solutions, to enhance coal extraction on a per metric tonne basis. This move is expected to significantly improve operational efficiency in one of India's key coal-producing regions.
Scope of Work
- Provision of mass production mining technology services for underground mining on a per metric tonne basis.
- Introduction of any mass production technology, including deployment of standard height continuous miner packages on a hiring basis.
- Open to other suitable underground mining technologies as per project requirements.
- Total mining quantity covered under the contract is 5,575,500 metric tonnes.
- Project location is Korea, Chhattisgarh, under the jurisdiction of South Eastern Coalfields Limited.
- Contract managed by Coal India Limited, Ministry of Coal.
Key dates, EMD, and fee details for interested bidders are as follows:
Tender Summary
How to Apply
- 1
Access the tender documents and application process via the GEM procurement portal.
- 2
Prepare and submit bids according to the specifications outlined for mass production mining technology services.
- 3
Deposit an Earnest Money Deposit (EMD) of ₹50 lakh as part of the bid submission.
- 4
Ensure bid validity for 180 days as per tender requirements.
- 5
Submit completed bids before the deadline on 7 September 2026.
Why It Matters
This tender marks a significant step towards modernising underground coal mining in Korea, Chhattisgarh, by introducing advanced mass production technologies. The project is poised to enhance coal extraction efficiency and support India's growing energy needs through improved mining practices.
Interested contractors and technology providers should review the tender details on the GEM portal and prepare their submissions ahead of the 7 September 2026 deadline. Timely participation is essential to be considered for this high-value mining technology contract.