Bid Publish Date
24-Jul-2026, 5:10 pm
Bid End Date
03-Sep-2026, 9:30 am
Value
₹10,49,00,00,000
Location
Progress
Tender Type
Open
Sector
State Governments & UT
Tender Fee
₹23,600
Contract Form
Works
Completion Period
As per tender Document Attached
Currency Type
Single
This government tender offers a unique opportunity for experienced EPC contractors and water infrastructure developers to participate in the development of a 50 MLD Sea Water Reverse Osmosis (SWRO) Desalination Plant in Dholera, Gujarat. The project, structured on a Hybrid Annuity Model (HAM), aims to enhance regional water security through sustainable and innovative desalination technology. Bidders are required to meet strict eligibility criteria, including proven experience in large-scale water projects, technical expertise, and financial stability. The tender process involves detailed bid submission, evaluation, and award procedures, with a focus on transparency and compliance. The estimated project cost is around INR 1,049 crore, with a comprehensive scope covering design, construction, commissioning, and maintenance. This initiative aligns with Gujarat’s focus on sustainable development and water resource management, offering lucrative opportunities for companies specializing in water treatment, civil construction, and environmental solutions. Interested firms should review the detailed tender documents and submit their bids via the NProcure platform before the deadline of September 3, 2026.
The scope of work encompasses the following key activities:
The project will follow these sequential steps:
| Specification | Details |
|---|---|
| Capacity | 50 MLD |
| Technology | Sea Water Reverse Osmosis |
| Model | Hybrid Annuity Model |
| Location | Dholera, Gujarat |
| Completion Period | As per tender document |
Bidders must ensure compliance with all technical standards and environmental norms specified in the tender documents.
The desalination plant must incorporate advanced SWRO technology with the following parameters:
| Parameter | Specification |
|---|---|
| Capacity | 50 MLD |
| Feed Water Quality | Salinity up to 45,000 ppm |
| Recovery Rate | Minimum 45% |
| Energy Consumption | Not exceeding 3.5 kWh/m3 |
| Membrane Type | High-efficiency spiral wound |
| Power Supply | 3-phase, 415V, 50Hz |
The process involves:
All equipment must meet BIS standards and be compatible with local environmental conditions.
The estimated project cost is approximately INR 1,049 crore, covering design, procurement, construction, and commissioning. Payment terms are structured based on project milestones, including mobilization, completion of civil works, equipment installation, and commissioning. The financial proposal must include detailed cost breakdowns:
| Cost Component | Percentage of Total Cost |
|---|---|
| Civil Works | 40% |
| Equipment & Machinery | 35% |
| Electrical & Instrumentation | 15% |
| Contingency & Miscellaneous | 10% |
Bidders are required to submit a financial bid with a firm price, valid for 180 days from bid submission. Payment schedules will be linked to project milestones and verified through progress reports. The bid security or EMD is INR 2.36 lakh, payable via demand draft, NEFT, or bank guarantee, valid for at least 225 days plus a 180-day claim period.
Tender Category
Service
Tender Value
₹10,49,00,00,000
Bid To RA
No
Item Category
Civil Works
Officer Inviting Bids
Managing Director, Dholera Industrial City Development Ltd (DICDL)
Bid Opening Authority
Managing Director, Dholera Industrial City Development Ltd (DICDL), Gandhinagar
Address
6th Floor, Block No. 1 and 2, Udhyog Bhavan, Sector-11, Gandhinagar – 382011
Contact Details
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
Discover companies most likely to bid on this tender
Bidders must meet the following eligibility criteria:
| Qualification Parameter | Minimum Requirement |
|---|---|
| Annual Turnover | INR 300 crore |
| Completed Projects | 1 desalination plant ≥20 MLD |
| Valid Certifications | As per tender norms |
Bidder eligibility will be assessed based on submitted documents, past project performance, and financial credentials.
03-09-2026 15:30
03-09-2026 15:35
03-09-2026 15:40
Tender Fee Form
Library-Standard
Emd Fee Form
Library-Standard
Technical Submissions
User Defined Template-Standard
Financial Bid Submission Form- Revised
User Defined Template-Secured
Tender Fee (Demand Draft/ NEFT or RTGS Transaction)
RequiredEarnest Money Deposit (EMD) (Online Transaction (NEFT/RTGS) / FDR / DD / Bank Guarantee for EMD must be purchased from the account of Bidder) (The validity of FDR/BG should not less than 225 days + 180 days claim period) as specified tender documents
RequiredPan Card
RequiredGST Registration Certificate.
RequiredProvide any proof of Bid Processing Fee
Provide any proof of EMD Document
Power of Attorney of Signatory.
RequiredJoint Bidding Agreement and Power of Attorney of lead partner, if applicable.
RequiredRequisite undertaking on stamp paper.
RequiredBid Forms, Qualification Information and supporting documents as specified tender documents
RequiredCertificates, undertakings, affidavits as specified tender documents
RequiredAny other information, documents as specified tender documents
RequiredAttach scan copy of PRICE BID FORM duly signed and stamped
RequiredKey insights about GUJARAT tender market
The project involves design, construction, commissioning, and operation of a 50 MLD Sea Water Reverse Osmosis (SWRO) desalination plant in Dholera, Gujarat. It includes procurement of equipment, environmental compliance, and maintenance under the Hybrid Annuity Model (HAM).
Bidders must have experience in large-scale water projects, a minimum annual turnover of INR 300 crore, and have completed at least one desalination plant of ≥20 MLD. They must also possess valid GST registration, PAN, and relevant certifications. Past project performance and financial stability are critical.
Interested bidders should download tender documents from the NProcure platform, submit bid security (EMD), and upload all required documents before the deadline of 03-09-2026 at 15:00 hours. The process includes technical evaluation followed by financial bid opening for qualified bidders.
The plant should incorporate advanced SWRO technology with parameters like 50 MLD capacity, recovery rate ≥45%, and energy consumption ≤3.5 kWh/m3. Equipment must meet BIS standards and be suitable for seawater salinity levels up to 45,000 ppm.
The estimated cost is approximately INR 1,049 crore. Payments will be linked to project milestones, including civil works, equipment installation, and commissioning. Bidders must submit a firm price bid, valid for 180 days, with payment schedules based on verified progress reports.
Sign up now to access all documents
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT