• Design and Engineering: Develop detailed engineering plans for the 750 KW solar power plant, ensuring compliance with local standards.
• Supply of Equipment: Provide high-efficiency solar panels, inverters, mounting structures, wiring, and other accessories as specified.
• Installation: Execute site preparation, mounting, electrical connections, and system integration following safety and quality standards.
• Testing & Commissioning: Conduct thorough testing of the entire system, including performance verification and safety checks.
• Operation & Maintenance: Provide a 1-year comprehensive O&M service post-installation, including routine inspections, cleaning, and troubleshooting.
• Documentation & Handover: Submit all technical documentation, manuals, and certificates, and hand over the operational plant to Dudhsagar Dairy.
| Specification |
Details |
| Total Capacity |
750 KW AC |
| Power Generation Type |
Roof Top Photovoltaic |
| Expected Annual Generation |
Approx. 1,200,000 kWh |
| Completion Period |
4 Months |
• Key Deliverables:
- Complete engineering and design reports
- Fully installed and tested solar power plant
- Operation & Maintenance contract documents
- As-built drawings and certification
• Sequential Process:
- Site assessment and survey
. 2. Design approval
. 3. Procurement of equipment
. 4. Installation and wiring
. 5. Testing and commissioning
. 6. O&M handover and documentation