TenderDekho Logo
Open State Governments & UT NPROCURE

Government Tender for Carting & Replacement of Failed Transformers - Mahuva Division

Bid Publish Date

17-Feb-2026, 5:00 pm

Bid End Date

27-Feb-2026, 6:00 pm

Value

₹14,80,000

Progress

Issue17-Feb-2026, 5:00 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

State Governments & UT

Tender Fee

₹1,180

Contract Form

Works

Completion Period

12  Months

Currency Type

Single

Categories 8

This government tender offers an opportunity for experienced electrical contractors and logistics companies to participate in carting and replacing failed transformers in Mahuva, Gujarat. Managed by Paschim Gujarat Vij Company Limited, the project aims to enhance power reliability through efficient installation and commissioning of transformers. The tender involves comprehensive technical and logistical work, with a total estimated cost of INR 14.80 lakh and a completion timeline of 12 months. Key dates include bid opening on 27th February 2026, with detailed eligibility criteria and technical specifications outlined to ensure quality and safety. Bidders must submit all required documentation, including experience certificates, vehicle insurance, GST registration, and proof of payment. This tender is ideal for electrical service providers, transportation companies, and infrastructure contractors seeking to collaborate with a leading government utility in Gujarat. The process is transparent, with evaluation based on technical competence and financial proposals, offering a strategic opportunity to contribute to state power infrastructure development.

Scope Of Work

The scope of work involves the following key activities:

  • Transportation of transformers from designated storage to the installation site.
  • Replacement of existing failed transformers with new or repaired units.
  • Installation, testing, and commissioning of transformers as per technical standards.
  • Ensuring safety protocols during all operations.
  • Coordinating with PGVCL officials for inspection and approval.

The process includes:

  1. Receiving the transformers and preparing the site.
  2. Disconnecting and removing the failed transformers.
  3. Transporting new transformers to the site.
  4. Installing and connecting the transformers securely.
  5. Conducting testing and commissioning.
  6. Final inspection and handover.

Key deliverables include:

Deliverable Specification
Transformers Capacity as per site requirement
Transportation Safe and timely delivery
Installation Proper wiring and grounding
Testing Compliance with standards
Documentation Completion reports and certificates

All work must comply with safety regulations, technical standards, and the specifications outlined in the tender documents.

Technical Specifications

Transformers to be used must meet the following technical parameters:

Parameter Specification
Capacity As specified in the tender documents
Voltage Rating As per site requirements
Insulation Class Standard IEC specifications
Cooling Type Oil-immersed or dry type as suitable
Compliance BIS and IEC standards

Sequential process:

  1. Inspection of transformers upon delivery.
  2. Testing for insulation resistance, winding resistance, and oil quality.
  3. Proper installation with grounding.
  4. Functional testing and load testing.
  5. Final certification and handover.

All technical activities must adhere to safety norms and quality standards specified in the detailed tender documents.

Financial Requirements

The estimated project cost is approximately INR 14.80 lakh, covering transportation, installation, and commissioning. Payment will be made in installments based on project milestones:

Payment Stage Percentage Description
Initial 20% On contract signing and submission of bank guarantee
Progress 50% After completion of installation and successful testing
Final 30% Post final inspection and approval

Bidders must submit detailed cost breakdowns, including transportation charges, labor costs, equipment costs, and miscellaneous expenses. All payments are subject to verification and approval by PGVCL authorities. The bid should be inclusive of all taxes, duties, and applicable levies.

Documents 2

Tender for carting & replacement of Fail transformers for Bagdana SDn.pdf

TENDER_DOCUMENT

SHEDUAL-B.pdf

TENDER_DOCUMENT

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

Bidders must meet the following eligibility criteria:

  • ✓ Must be registered electrical contractors with valid licenses.
  • ✓ Proven experience in transformer transportation, installation, and commissioning.
  • ✓ Experience certificate issued by the competent authority (e.g., Executive Engineer).
  • ✓ Valid PAN, GST registration, and vehicle insurance documents.
  • ✓ Aadhar card (for individual bidders) or company registration proof.
  • ✓ Notarized self-declaration confirming no criminal cases against the bidder.
  • ✓ Valid driver’s license for heavy vehicles.
  • ✓ Vehicle RC book, PUC certificate, fitness certificate, goods carriage permit, and road tax receipt.
  • ✓ Workman group insurance policy.
  • ✓ Electrical contractor license.
  • ✓ Proof of online payment of EMD and tender fee.
Qualification Parameter Minimum Requirement
Experience At least 3 similar projects completed in last 5 years
Financial Turnover Minimum INR 10 lakh in last fiscal year
Technical Certification Valid electrical contractor license

All submitted documents must be valid, clear, and up-to-date.

Bidding Process

Process Timeline

1. Technical Evaluation

02-03-2026 11:00

2. Price Bid Evaluation

02-03-2026 15:00

Required Forms

Technical

Tender Fee Form

Library-Standard

Required

Emd Fee Form

Library-Standard

Required

Price

Fail TC Bagdana Sdn

User Defined Template-Secured

Required

Required Documents

Stage - Technical Evaluation

1

Vendor Registration Details

Required
2

• Experience certificate by Order Issuing Authority (Executive Engineer only) with copies of latest work Orders for the similar works executed.

Required
3

• PAN card in the name of bidder

Required
4

• Insurance copy of Vehicle.

Required
5

• GST Registration Certificate in the name of bidder

Required
6

• Aadhar Card (In case of Bidding is done on Individual name)

Required
7

• Notarized Self Declaration on Rs.300/- Stamp paper for No Criminal Case against PGVCL

Required
8

• Driver’s driving License(Heavy Base)

Required
9

• R.C. BOOK of Vehicle

Required
10

• PUC certificate(latest)

Required
11

Fitness Certificate of vehicle

Required
12

• Goods carriage permit of vehicle

Required
13

• Road tax receipt of vehicle

Required
14

• Workman Group Insurance policy

Required
15

• Electrical Contractor License

Required
16

certificate A

Required
17

Proof of Online payment of EMD and Tender fee

Required

Form - Tender Fee Form

1

Provide any proof of Bid Processing Fee

Form - Emd Fee Form

1

Provide any proof of EMD Document

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the scope of this government tender?

This tender involves carting and replacement of failed transformers in the Bagdana Sub Division, Mahuva, Gujarat. The scope includes transportation, installation, testing, and commissioning of transformers, ensuring compliance with safety and technical standards. The project aims to restore reliable power supply by replacing malfunctioning transformers efficiently, with a completion period of 12 months.

Who is eligible to participate in this tender?

Eligible bidders must possess valid electrical contractor licenses, experience in transformer installation and transportation, and provide necessary documents such as PAN, GST registration, vehicle insurance, and experience certificates. Bidders must also submit proof of online payment of EMD and tender fee, along with other technical credentials, to qualify for technical evaluation.

What are the key dates and deadlines for this tender?

The bid submission starts on 17th February 2026 and closes on 27th February 2026 at 6:00 PM. The technical evaluation is scheduled for 2nd March 2026 at 11:00 AM, followed by price bid opening at 3:00 PM on the same day. Final award notifications are expected by 4th March 2026. Bidders must ensure timely submission of all documents.

What technical standards must the transformers meet?

Transformers must comply with BIS and IEC standards, with specifications including appropriate capacity, voltage rating, insulation class, and cooling type. They should be oil-immersed or dry type as suitable, and undergo testing for insulation resistance, winding resistance, and oil quality before installation. Proper grounding and safety measures are mandatory during installation.

How is the evaluation of bids conducted?

Bids are evaluated based on technical competence, experience, financial proposal, and past performance. The evaluation criteria assign 40% weightage to technical competence, 30% to financial bid, and the remaining to past references and technical compliance. Bidders must score at least 50% in technical assessment to qualify for the price bid evaluation, with the highest combined score winning the tender.