Progress
Tender Type
Open
Sector
State Governments & UT
Tender Fee
₹900
Contract Form
Works
Completion Period
06 Months
Currency Type
Single
This government tender offers a significant opportunity for civil construction firms to participate in the development of water infrastructure in Tapi district, Gujarat. The project involves constructing a Checkdam cum causeway at Ambiya village, aimed at enhancing water conservation and irrigation. With an estimated cost of over 20 million INR and a completion timeline of 6 months, the tender is managed by the Panchayat Irrigation Division, Tapi, under the Department of Narmada Water Resources. Bidders must meet strict eligibility criteria, including site visits, registration, and bid security submission. The process is fully online, requiring digital certificates for bid submission. Download detailed documents, review technical specifications, and prepare your bid accordingly. This project is ideal for experienced civil contractors specializing in water resource infrastructure and government projects, offering a rewarding opportunity to contribute to regional development.
The scope of work includes:
Construction of a Checkdam cum causeway at Ambiya village, Vyara Taluka, Tapi district.
Key deliverables:
The process involves:
The project must adhere to technical standards specified in the tender documents, including safety and environmental regulations.
| Specification | Details |
|---|---|
| Dam Length | As per site assessment |
| Material | Approved concrete and reinforcement |
| Spillway Capacity | Designed for specified flood levels |
| Environmental Compliance | Must meet state and central guidelines |
The technical parameters for the civil works include:
| Parameter | Specification |
|---|---|
| Dam Length | To be finalized after site survey |
| Material Strength | Concrete grade M20 or higher |
| Spillway Design | Capable of handling flood discharge as per hydrological data |
| Foundation | Excavation to stable substratum, reinforcement as per structural design |
| Construction Method | Conventional RCC with environmental safeguards |
The process involves:
The estimated project cost is approximately 20,695,102 INR. The budget breakdown includes:
| Item | Cost (INR) |
|---|---|
| Materials | 8,000,000 |
| Labour | 7,000,000 |
| Equipment | 3,000,000 |
| Miscellaneous | 2,695,102 |
Payment terms are structured as:
Bidders must submit financial proposals in accordance with the tender guidelines, ensuring transparency and compliance.
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
Discover companies most likely to bid on this tender
✓ Must have valid registration certificates of appropriate class.
✓ Must submit Bid Document Fee / Tender Fee of 900 INR.
✓ Must provide Bid Security / EMD or valid exemption certificate.
✓ Must have GST Number and PAN Card.
✓ Must visit the site before bidding and submit an “Acknowledgement of site visit” from the Deputy Executive Engineer, both physically and online.
| Criteria | Requirement |
|---|---|
| Registration | Valid registration certificate of appropriate class |
| Bid Security | EMD or exemption certificate |
| Financial | Demonstrated financial stability as per tender norms |
| Site Visit | Evidence of site visit acknowledgment |
| Technical | Proven experience in similar civil water resource projects |
05-03-2026 12:00
05-03-2026 12:05
Tender Fee Form
Library-Standard
Emd Fee Form
Library-Standard
Percentage Rate
Library-Secured
Bid Document Fee / Tender Fee
RequiredBid Security / EMD or Valid EMD Exemption Certificate of Appropriate Class of Registration of Approved Contractors
RequiredRegistration Certificate of Appropriate Class
RequiredGST Number and Pancard.
RequiredAs necessity of work completion within short time period and Considering the Geographical Condition of Tapi District, Contractor must have to visit the Site before bidding, and it is compulsory for contractor to Submit the “Acknowledgement of site visit” obtained from Concerned Deputy Executive Engineer Physically as well as Online about Visit the Site before Bidding.
RequiredProvide any proof of Bid Processing Fee
Provide any proof of EMD Document
Key insights about GUJARAT tender market
This tender aims to select qualified contractors for constructing a Checkdam cum causeway at Ambiya village in Tapi district, Gujarat, to improve water conservation and irrigation infrastructure.
Bidders must possess valid registration certificates, submit Bid Security or exemption certificates, have GST and PAN numbers, and must visit the site before bidding to submit an acknowledgment from the Deputy Executive Engineer.
| Criteria | Details |
|---|---|
| Registration | Appropriate class registration certificate |
| Bid Security | Valid EMD or exemption certificate |
| Site Visit | Submit acknowledgment from Deputy Engineer |
| Financial Stability | Demonstrated through previous projects |
| Technical Experience | Proven experience in civil water resource projects |
Interested bidders should download the tender documents from the official portal, attend the pre-bid meeting scheduled on 16-02-2026, and submit their technical and financial bids online before the deadline of 02-03-2026 at 18:00. Ensure all required documents are uploaded and compliant with the specified formats. Bids will be opened publicly, and successful bidders will be notified for contract signing.
The project requires construction using high-grade concrete (M20 or higher), foundation excavation, reinforcement, and spillway capacity designed for flood handling. The dam length will be finalized after site survey, and all work must meet safety and environmental standards as specified in the tender documents.
| Parameter | Specification |
|---|---|
| Material | Concrete M20+ |
| Spillway | Designed for flood discharge |
| Foundation | Excavation to stable substratum |
| Construction Method | RCC with environmental safeguards |
The total estimated cost is approximately 20,695,102 INR. The budget breakdown includes materials, labor, equipment, and miscellaneous expenses. Payment will be made in installments based on project milestones, starting with a 10% advance and concluding with 20% after final approval. Bidders must submit cost proposals aligned with these terms to be considered.