The technical specifications require the use of high-quality, IS-standard earth wires suitable for 66kV transmission lines. The installation must ensure proper tension, minimal sag, and secure fastening. The process involves:
- Using appropriate tools and equipment for dismantling and stringing.
- Following safety protocols during all operations.
- Conducting electrical and mechanical tests post-installation.
| Parameter |
Specification |
| Wire Material |
Aluminum or Aluminum alloy |
| Diameter |
As per IS standards |
| Tension |
As per manufacturer recommendations |
| Insulation |
Proper grounding and insulation measures |
The process includes sequential steps: site assessment, equipment mobilization, dismantling, stringing, tensioning, inspection, and commissioning.