Progress
Tender Type
Open
Sector
Power and Energy
Tender Fee
₹2,950
Contract Form
Supply
Completion Period
11 Months
Currency Type
Single
This government tender offers a unique opportunity for electrical equipment suppliers to participate in the supply contract at Gujarat's Bhavnagar Lignite Thermal Power Station. Managed by Gujarat State Electricity Corporation Limited, the project involves providing electrical components necessary for Unit-1 Boiler area during maintenance activities. With an estimated value of approximately 34.39 lakh INR and a completion timeline of 11 months, this tender emphasizes quality, compliance, and timely delivery. Bidders must meet specific eligibility criteria, submit technical and financial documents, and adhere to the structured bidding process. The procurement process is conducted electronically, ensuring transparency and efficiency. This opportunity is ideal for experienced vendors seeking to contribute to Gujarat’s power infrastructure development and enhance their presence in the power and energy sector.
The scope of this tender includes the supply of electrical equipment and components required for the power plant's Unit-1 Boiler area during AOH/COH activities. Key deliverables include:
The process involves:
| Item Category | Specifications |
|---|---|
| Electrical Equipment | As per detailed technical specifications in the tender documents |
Bidders must ensure all equipment meets the technical parameters outlined in the tender and adhere to the delivery schedule to avoid penalties.
The electrical equipment must conform to the following parameters:
| Parameter | Specification |
|---|---|
| Voltage | As per project requirement, detailed in tender docs |
| Power Rating | As specified in technical datasheets |
| Certification | Must have BIS/ISO certification where applicable |
| Delivery Standards | Compliant with IEC/IEEE standards |
The procurement process involves:
The estimated project cost is approximately 34,39,168.12 INR. Payment terms include:
| Payment Schedule | Details |
|---|---|
| Advance Payment | 10% upon contract signing |
| Progress Payments | 50% based on delivery milestones |
| Final Payment | 40% after successful commissioning |
Bidders must submit a bid offer that includes detailed cost breakdowns, including unit costs, taxes, and other applicable charges. All payments will be processed as per the terms outlined in the tender documents, with clear milestones for release.
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
Discover companies most likely to bid on this tender
✓ Must have valid GST Certificate and proof of Bid Processing Fee and EMD.
✓ Bidders should have relevant experience in supplying electrical equipment for power plants.
✓ Must submit all necessary technical documents, including signed tender booklet.
| Criterion | Requirement |
|---|---|
| Financial Qualification | Annual turnover of at least 50 lakh INR in the last 3 years |
| Technical Capability | Proven experience in electrical supply for power projects |
| Certification | Valid GST Certificate and valid Digital Signature Certificate |
Important: Bidders must provide all documents as specified for both preliminary and technical stages to qualify for evaluation.
02-03-2026 18:00
02-03-2026 18:05
02-03-2026 18:10
Tender Fee
User Defined Template-Standard
EMD Details
User Defined Template-Standard
DETAILS OF BIDDER.
User Defined Template-Standard
Stop Deal Undertaking
User Defined Template-Standard
Price Bid Form
Library-Secured
Provide any proof of Bid Processing Fee and EMD
RequiredScan copy of GST Certificate
RequiredKindly attach scan copy of duly signed & stamp of Tender booklet and all other necessary documents.
RequiredKey insights about GUJARAT tender market
The bid submission deadline is 20th February 2026 at 17:30 IST. Bidders must ensure all documents are uploaded before this time to avoid disqualification.
Bidders must submit proof of Bid Processing Fee, EMD, and GST Certificate. These are mandatory for qualifying in the preliminary evaluation stage.
| Document | Requirement |
|---|---|
| Bid Processing Fee proof | Valid receipt or proof |
| EMD proof | Bank guarantee or receipt |
| GST Certificate | Valid GST registration certificate |
Technical evaluation will assess the bidder's experience, technical competence, and compliance with specifications. Bidders must submit signed & stamped tender documents and all technical certifications. A minimum score of 50% is required to proceed to commercial evaluation.
The approximate project cost is 34,39,168.12 INR. This includes all costs associated with the electrical equipment supply, delivery, and associated services as specified in the tender documents.
For support, contact Addl. Chief Engineer (G) at Gujarat State Electricity Corporation Limited or reach out to the (n)Procure support team at GNFC Ltd., Ahmedabad. Contact details are provided in the tender notice.
Sign up now to access all documents
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT