• Erection of 66kV transmission towers at designated locations along the Umarsadi-Kolak line crossing.
• Installation of tower foundations, including civil works such as excavation, concrete work, and foundation setting.
• Erection of steel towers with proper alignment and height specifications.
• Stringing and tensioning of conductors to ensure optimal power transmission.
• Installation of necessary insulators, hardware, and accessories.
• Testing and commissioning of the erected towers and transmission line.
The process involves:
- Site preparation and civil foundation work.
- Tower assembly and erection.
- Conductor stringing and tensioning.
- Final inspection, testing, and commissioning.
| Specification |
Details |
| Number of towers |
5 |
| Tower type |
Lattice Steel Towers |
| Voltage level |
66kV |
| Line crossing |
Kolak River |
Key deliverables include detailed project plan, timely completion, adherence to safety standards, and quality assurance documentation.