This government tender offers contractors an opportunity to construct a R.C.C. Box Culvert using Precast Box technology across the Rupal-Sardhav drain near Village Jalund, Gandhinagar. The project aims to improve regional drainage infrastructure, ensuring flood mitigation and enhanced road safety. With a project duration of 6 months and an estimated cost of Rs. 34.43 Lakhs, qualified civil engineering firms with experience in precast concrete and drainage projects are encouraged to participate. The tender process is open, requiring online submission of technical and financial bids before the deadline of September 1, 2026. Download detailed specifications, drawings, and documents to prepare your bid. This is a prime opportunity for experienced contractors to work on a significant public infrastructure project in Gujarat, contributing to sustainable urban development and flood management.
The scope of work involves the construction of a R.C.C. Box Culvert with Precast Box elements across the Rupal-Sardhav drain at chainage 8460 meters near Village Jalund, Gandhinagar. Key deliverables include:
The process includes:
| Technical specifications |
|---|
| Material: Reinforced concrete |
| Length: As per design |
| Width: As per design |
| Design Load: As specified |
| Standards: IS codes |
All work must comply with the detailed technical specifications provided in the tender documents, ensuring durability, safety, and compliance with local regulations.
The technical parameters for the culvert construction include:
| Parameter | Specification |
|---|---|
| Material | Reinforced concrete as per IS codes |
| Dimensions | As per detailed drawings |
| Load Capacity | Designed for specified traffic load |
| Durability | Minimum service life of 50 years |
| Standards | IS 456, IS 3370, and relevant specifications |
The construction process involves sequential steps:
All technical work must adhere strictly to the specifications outlined in the tender documents and technical drawings.
The estimated project cost is Rs. 34,43,367.44. The financial proposal must include a detailed breakdown:
| Cost Component | Amount (Rs.) |
|---|---|
| Material costs | As per bill of quantities |
| Labor charges | As per applicable rates |
| Equipment hire | As required |
| Miscellaneous expenses | As per tender |
Payment terms are structured as follows:
All payments are subject to certification by the designated engineer and compliance with contract terms.
Tender Type
Open
Sector
State Governments & UT
Tender Fee
₹1,500
Contract Form
Works
Completion Period
6 Months
Currency Type
Single
Bid Submission Start
11-08-2026 16:00:00
Document Download End
01-09-2026 18:00:00
Bid Validity
120 Days
Tender Category
Service
Tender Value
₹34,43,368
Bid To RA
No
Item Category
Civil Works - Others
Officer Inviting Bids
Executive Engineer, Drainage Division, Gandhinagar
Bid Opening Authority
Executive Engineer, Drainage Division, Gandhinagar
Address
SWDC Building, Sector-8, Gandhinagar-382007
Contact Details
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
TENDER_DOCUMENT
02-09-2026 12:00
11-09-2026 12:00
Tender Fee Form
Library-Standard
Emd Fee Form
Library-Standard
Percentage Rate
Library-Secured
Bid Document Fee/Tender Fee As per NIT
RequiredBid Security / EMD or Valid EMD Exemption Certificate or in terms of Bank guarantee (valid 165 days from the date of bid submission) of Appropriate Class of Registration of Approved Contractors As per IFB & Refer clause no. 16 for provision of Bank guarantee
RequiredRegistration Certificate of Appropriate Class As per NIT
RequiredGST Registration Certificate As per NIT
RequiredPAN card As per NIT
RequiredLitigation history As per Section 2 - 1.11
RequiredAffidavit on Rs. 300 Stamp As per Section 2
RequiredUndertaking for 25 Percentage Investment As per Section 2
RequiredUndertaking for Bid Validity As per Section 8
Requiredlast five finical years i.e. from 2021-22 to 2025-26 Turn Over (year wise) for Civil Engineering Works certified by CA As per Clause 4.5.3 of ITB or Section 1
RequiredAchieved a minimum annual financial turnover of Rs. 0.69 Crore for works in progress and completed in all classes of civil engineering construction works in any one year, over the last five financial years, i.e. from 2021-22 to 2025-26 updated to the current financial year. As per Clause 4.5.3 of ITB or Section 1
RequiredExperience in successfully completing or substantially completing at least one contract of similar work like Constructing R.C.C. Box Culvert with using Precast Box Cell of at least 40 percent of the value of proposed contract, i.e. Rs. 13.78 lacs within the last five financial years, i.e. from 2021-22 to 2025-26 updated to the current financial year. As per Clause 4.5.3 of ITB or Section 1
RequiredDiscover companies most likely to bid on this tender
Key insights about GUJARAT tender market
The last date for submitting bids is 01-09-2026 at 18:00. Bidders must ensure their bids are uploaded before this deadline to be considered.
Bidders must possess valid registration certificates, GST and PAN, experience in similar civil works, minimum annual turnover of Rs. 0.69 Crore, and proof of successful project completion. All documents must be submitted as per the tender requirements.
Participants need a valid Digital Certificate issued by a licensed Certifying Authority. They can download the tender documents, attend vendor training sessions, and submit bids electronically via the official portal. Support is available from the (n)code solutions team.
All work must adhere to IS codes such as IS 456 and IS 3370. The precast components should meet durability and safety standards, with proper reinforcement, joint sealing, and quality control as specified in the technical documents.
The estimated project cost is approximately Rs. 34,43,367.44. The bid should include a detailed cost breakdown aligned with the tender specifications, and payments will be made as per the scheduled milestones.