TenderDekho Logo
Open State Governments & UT NPROCURE

Government Tender for Replacement of Distribution Transformer, CT, PT & TC Earthling in Jamnagar

Bid Publish Date

12-Feb-2026, 6:30 pm

Bid End Date

05-Mar-2026, 6:00 pm

Value

₹10,00,000

Progress

Issue12-Feb-2026, 6:30 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

State Governments & UT

Tender Fee

₹886

Contract Form

Works

Completion Period

12  Months

Currency Type

Single

Categories 10

This government tender offers an opportunity for electrical contractors and power infrastructure companies to participate in the replacement of failed distribution transformers, CT, PT, and TC earthling systems at Shapar S/Dn, Jamnagar. Managed by Paschim Gujarat Vij Company Limited (PGVCL), this project aims to improve electrical reliability and safety in the region. Bidders must meet strict eligibility criteria, including valid certifications, experience, and insurance coverage. The project involves comprehensive installation, testing, and commissioning activities with a completion timeline of 12 months. The tender process is conducted electronically via the NProcure portal, ensuring transparency and efficiency. Interested companies specializing in electrical power distribution, transformer installation, and infrastructure upgrades are encouraged to submit their bids before the deadline of March 5, 2026. This is a significant opportunity for qualified vendors to contribute to Gujarat's power distribution network enhancement while adhering to government procurement standards.

Scope Of Work

The scope of work includes:

  • Replacement of failed distribution transformers at Shapar S/Dn.
  • Earthling system upgrades for CT, PT, and TC units.
  • Installation of new electrical components as per technical specifications.
  • Testing and commissioning of all replaced equipment.

The key deliverables are:

  • Complete removal of old transformers and earthling systems.
  • Supply and installation of new transformers, CT, PT, and TC earthling components.
  • Ensuring all work complies with safety and quality standards.
  • Providing documentation and certification of completed work.

The process involves:

  1. Site assessment and preparation.
  2. Removal of existing faulty equipment.
  3. Installation of new components.
  4. Testing, commissioning, and handover.
Technical Specifications Details
Transformer Capacity As specified in tender documents
Earthling Resistance < 1 ohm
Power Supply Voltage 11kV / 0.433kV
Certification Standards IEC / IS standards

All work must be completed within 12 months from the award date, with adherence to safety protocols and quality benchmarks.

Technical Specifications

The project requires installation of transformers with a capacity of up to 250 kVA, compliant with IEC and IS standards. Transformers should have efficient cooling systems, low noise levels, and robust insulation. Earthling resistance must be less than 1 ohm to ensure safety. The installation process involves sequential steps: site assessment, removal of defective units, installation of new transformers, and rigorous testing. All equipment must be certified and compatible with existing infrastructure. The technical parameters include:

plaintext

  • Transformer Capacity: 100-250 kVA
  • Voltage Rating: 11kV / 0.433kV
  • Insulation Class: Class F or higher
  • Earthing Resistance: < 1 ohm
  • Standards: IEC 60076, IS 1180

Ensure all work adheres to safety and quality standards, with documentation provided for compliance.

Financial Requirements

The total estimated cost for the project is INR 10,00,000. The financial proposal should include a detailed breakdown:

Cost Component Amount (INR)
Material Cost 6,00,000
Labour Charges 2,50,000
Transportation 50,000
Miscellaneous 1,00,000
Total 10,00,000

Payment terms are as follows:

  • 10% advance on contract signing.
  • 40% after installation and initial testing.
  • 50% after successful commissioning.
    All payments are subject to submission of valid invoices and certification of work completion.

Documents 1

3 ET-50- TC REPL.pdf

TENDER_DOCUMENT

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

✓ Must have a valid Solvency Certificate as specified.
✓ Must possess valid Vendor Registration.
✓ Proven work experience in transformer replacement and electrical infrastructure projects.
✓ Submit copies of work orders demonstrating relevant project experience.
✓ Valid Group Insurance/Labor Insurance coverage.
✓ Submit EMD and Tender Fee receipts.
✓ Valid Shop Act Certificate.
✓ Confirmed contractor store address as mentioned.
✓ Submission of all other documents as specified in the tender.

Qualification Requirements Details
Minimum Annual Turnover INR 50 Lakhs
Experience in similar projects At least 2 projects in last 3 years
Valid licenses and certifications As per government norms
Financial stability Demonstrated through solvency certificates

Note: Bidders must meet all eligibility criteria to qualify for technical evaluation.

Bidding Process

Process Timeline

1. TECHNICAL BID

06-03-2026 11:00

2. PRICE BID

06-03-2026 12:00

Required Forms

TECHNICAL

TECHNICAL SPECIFICATION

User Defined Template-Standard

Required

TENDER FESS AND EMD

User Defined Template-Standard

Required

PRICE

PRICE BID TC REPLACEMENT

User Defined Template-Standard

Required

Required Documents

Stage - TECHNICAL BID

1

VALID SOLVANCY CERTIFICATE AS MENTIONED

Required
2

VALID VENDOR REGISTRATION AS MENTIONED

Required
3

WORK EXPERIANCE DOCUMENTS AS MENTIONED

Required
4

WORK ORDER COPY AS MENTIONED

Required
5

VALID GROUP INSURANCE/LABOR INSURANCE AS MENTIONED

Required
6

EMD AND TENDER FEE PHOTO COPY

Required
7

SHOPACT CERTIFICATE

Required
8

CONTRACTOR STORE ADDRESS AS MENTIONED

Required
9

OTHER DOCUMENTS MENTIONED IN TENDER

Required

Form - TECHNICAL SPECIFICATION

1

DOCUMNETS MENTIONED IN TENDER

Required

Form - TENDER FESS AND EMD

1

TENDER FEE EMD RECEIPT COPY

Required

Stage - PRICE BID

1

TENDER COPY/SCHEDULE B

Required

Form - PRICE BID TC REPLACEMENT

1

ALL RELEVENT DOCUMENTS MENTIONED IN TENDER

Required

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the deadline for bid submission?

The bid submission deadline is March 5, 2026, at 6:00 PM. Bidders must upload all required documents electronically via the NProcure portal before this time to be considered.

What documents are required for technical bid submission?

The technical bid must include:

  • Valid Solvency Certificate
  • Vendor Registration proof
  • Work Experience documents
  • Work Order copies
  • Insurance certificates
  • EMD and Tender Fee receipts
  • Shop Act Certificate
  • Contractor store address proof
  • Other documents as specified in the tender.
    All documents must be clear and valid.
How is the evaluation process conducted?

Evaluation involves two stages:

  1. Technical evaluation based on experience, certifications, and compliance.
  2. Price bid opening for qualifying bidders.
    Minimum technical score of 70% is required to proceed to price evaluation. Final selection considers both technical and financial scores, with emphasis on quality and cost.
Can I attend a training session for online bidding?

Yes, free vendor training sessions are organized every Saturday from 4:00 PM to 5:00 PM at (n)Code Solutions, Ahmedabad. These sessions help bidders understand the online bidding process, document preparation, and submission procedures.

What are the eligibility criteria for bidders?

Bidders must possess:

  • Valid Solvency Certificate
  • Valid Vendor Registration
  • Relevant project experience
  • Insurance coverage
  • Necessary licenses such as Shop Act
  • Submission of all required documents as per tender guidelines.
    Failure to meet these criteria may result in disqualification.