Progress
Tender Type
Open
Sector
Power and Energy
Tender Fee
₹2,950
Contract Form
Works
Completion Period
As per tender Document Attached
Currency Type
Single
This government tender offers a unique opportunity for civil contractors and water management firms to participate in the Roof Top Rain Water Harvesting project at Ukai Thermal Power Station in Gujarat. Managed by Gujarat State Electricity Corporation Limited, the project aims to enhance water conservation through innovative rainwater harvesting systems. Bidders are invited to submit comprehensive proposals that include design, supply, installation, and commissioning of rainwater harvesting infrastructure. The tender emphasizes technical expertise, compliance with standards, and timely completion. With a structured evaluation process and clear deadlines, this project supports sustainable water solutions in the power sector. Interested firms should review the detailed tender documents, ensure eligibility, and prepare their bids accordingly to secure this environmentally beneficial contract.
The scope of work includes:
The key deliverables are:
| Specification | Details |
|---|---|
| System Capacity | As per site requirements |
| Material Standards | IS standards applicable |
| Maintenance Period | As specified in tender |
The project must be completed within the timeline specified in the tender document, adhering to safety and quality standards.
The technical specifications include:
| Parameter | Requirement |
|---|---|
| Material | High-quality, IS standard compliant |
| System Capacity | Designed for maximum rainwater collection based on roof area |
| Filtration | Multi-stage filtration system to prevent debris |
| Storage | Tanks with corrosion-resistant lining |
| Discharge | Proper overflow and drainage arrangements |
Sequential steps for technical implementation:
All technical activities must comply with local standards and safety regulations.
The estimated budget for this project ranges from ₹X to ₹Y crore, inclusive of all materials, labor, and overheads. The financial breakdown is as follows:
| Cost Component | Estimated Cost |
|---|---|
| Design & Planning | 10% |
| Materials | 50% |
| Labor & Installation | 30% |
| Contingency & Miscellaneous | 10% |
Payment terms are structured as:
Tender Category
Service
Bid To RA
No
Item Category
Civil - All
Officer Inviting Bids
Chief Engineer (G), UTPS
Bid Opening Authority
Chief Engineer (G), UTPS
Address
Gujarat State Electricity Corporation Ltd. Thermal Power Station Ukai
Contact Details
8758914867
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
TENDER_DOCUMENT
TENDER_DOCUMENT
Discover companies most likely to bid on this tender
| Criterion | Requirement |
|---|---|
| Annual Turnover | Minimum of ₹X crore for the last 3 years |
| Past Projects | At least 2 similar projects completed in the last 5 years |
03-08-2026 15:00
03-08-2026 15:05
03-08-2026 15:30
Tender Fee Detail UTPS
User Defined Template-Standard
EMD payment detail of UTPS
User Defined Template-Standard
UTPS Confirmation
User Defined Template-Standard
Certificate-A UTPS
User Defined Template-Standard
Relationship with employee UTPS
User Defined Template-Standard
WT-5207
User Defined Template-Secured
Attach scan copy payment receipt of Tender fee and EMD
RequiredAttach scanned copy of technical bid with all relevant documents.
RequiredKey insights about GUJARAT tender market
The bid submission deadline is 01-08-2026 at 18:30 hours. Bidders must upload all required documents before this time. Late submissions will not be considered.
Bidders must submit scan copies of the payment receipt of Tender fee and EMD. These are mandatory for bid acceptance, along with other eligibility documents as specified in the tender notice.
Participants need to register on the official portal, procure a valid Digital Certificate, and attend free training sessions if needed. All bids must be uploaded electronically following the guidelines provided in the tender documents.
The system must comply with IS standards, include high-quality materials, and be capable of handling the designed capacity. The installation involves site survey, design approval, procurement, installation, and testing, ensuring safety and efficiency.
You can contact the Chief Engineer (G), UTPS at 8758914867 or email [email protected]. Support is available Monday to Saturday, 4 PM to 5 PM, for all queries related to the bidding process.
Sign up now to access all documents
TENDER_DOCUMENT
TENDER_DOCUMENT