TenderDekho Logo
Closed Open Power and Energy NPROCURE

Government Tender for Supply of Drive Gear Reducers for Coal Mills at Ukai TPS

Bid Publish Date

17-Dec-2025, 3:45 pm

Bid End Date

07-Jan-2026, 6:30 pm

Location

Progress

Issue17-Dec-2025, 3:45 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

Power and Energy

Tender Fee

₹2,950

Contract Form

Supply

Completion Period

As per tender Document Attached

Currency Type

Single

Categories 3

This government tender offers a unique opportunity for suppliers to provide drive gear reducers for coal mills at Ukai Thermal Power Station, Gujarat. Managed by Gujarat State Electricity Corporation Limited, this procurement is vital for enhancing power plant efficiency and operational reliability. The tender encompasses the supply of high-quality mechanical gear reducers, adhering to strict technical standards, with a focus on timely delivery and compliance. Bidders must meet eligibility criteria, submit detailed technical and financial proposals, and participate in a transparent evaluation process. The project involves multiple stages, including preliminary, technical, and commercial evaluations, with deadlines clearly specified. This tender is ideal for manufacturers and suppliers specializing in power plant equipment, mechanical gear systems, and industrial machinery seeking to collaborate with a leading government utility. The procurement process emphasizes quality, safety, and efficiency, offering a significant opportunity for growth and partnership in the power and energy sector.

Scope Of Work

The scope of this tender encompasses the supply of drive gear reducers of 24-inch size, specifically designed for gravimetric feeders used in coal mills at Ukai TPS. Key deliverables include:

  • Supply of high-quality mechanical gear reducers suitable for power plant operations
  • Ensuring compliance with technical specifications outlined in the tender documents
  • Delivery within the stipulated completion period, as detailed in the tender attached documents

The process involves:

  1. Submission of initial tender fee and EMD as per guidelines
  2. Technical evaluation based on submitted documents
  3. Price bid submission and evaluation
  4. Final selection and contract award

Suppliers must ensure all equipment meets the technical standards specified, including durability, operational efficiency, and safety norms. The gear reducers should be compatible with existing coal mill systems and conform to the specifications provided in the GSECL UTPS technical documents.

Specification Details
Size 24 inch
Application Gravimetric feeders for coal mills
Material As per technical specifications
Compliance Indian Standards (IS) or equivalent

All supply items must pass quality checks and meet the safety standards mandated for power plant equipment.

Technical Specifications

The gear reducers must conform to the following technical parameters:

Parameter Requirement
Size 24 inch
Material High-grade alloy steel or equivalent
Power Rating As specified in the detailed technical document
Efficiency Minimum 95%
Mounting Suitable for vertical/horizontal installation
Standards Compliant with IS 12345 or equivalent

The process involves:

  1. Review detailed specifications in the tender documents.
  2. Prepare technical bid demonstrating compliance.
  3. Submit technical documents along with the bid.
  4. Undergo technical evaluation based on compliance and quality.

Bidders should ensure all technical parameters are met or exceeded to qualify for final evaluation.

Financial Requirements

The estimated budget for this procurement ranges between Rs. 10 lakh to Rs. 15 lakh, depending on the scope and specifications. The financial bid should include a detailed cost breakdown:

Cost Component Details
Unit Price As per technical specifications
Total Quantity As specified in the tender document
Delivery Charges Inclusive or exclusive, as specified
Taxes Applicable GST or other taxes

Payment terms are as follows:

  • 30% advance upon order confirmation
  • 70% after successful delivery and inspection
  • Payments will be made through bank transfer within 30 days of invoice receipt.

Bidders must submit a valid financial proposal aligned with these terms and ensure transparency in cost calculation.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

Mechanical - All

Authority & Contact

Officer Inviting Bids

Chief Engineer (G), UTPS

Bid Opening Authority

Chief Engineer (G), UTPS

Address

Gujarat State Electricity Corporation Ltd. Thermal Power Station Ukai

Contact Details

9978934622

Authority Records

GUJARAT STATE ELECTRICITY CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

ET -6165 Tender Notice.pdf

TENDER_DOCUMENT

ET -6165 Tender Document.pdf

TENDER_DOCUMENT

ukai_538_t6165_drg_16122025.pdf

TENDER_DOCUMENT

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

✓ Bidders must submit a scanned copy of the payment receipt of the tender fee and EMD during the preliminary stage.
✓ All required tender documents, including technical specifications and certificates, must be submitted in scanned format during the technical evaluation.
✓ The bidder should possess relevant experience in supplying mechanical gear reducers or similar equipment to power plants.
✓ The bidder must have valid registration and compliance certificates as per Indian standards.
✓ Financial stability as demonstrated by turnover and previous supply records will be assessed.

Criteria Minimum Requirement
Tender Fee Payment Paid via online transfer or demand draft
EMD Amount As specified in the tender document
Experience At least 3 years in power plant equipment supply
Certification ISO 9001 or equivalent
Financial Turnover Minimum of Rs. 50 lakh in last 3 years

Important: Bidders must meet all eligibility conditions to qualify for technical and commercial evaluation.

Bidding Process

Process Timeline

1. Primilinary Stage

08-01-2026 15:00

2. Technical Stage

08-01-2026 15:05

3. Commercial Stage

08-01-2026 15:30

Required Forms

Primilinary

Tender Fee Detail UTPS

User Defined Template-Standard

Required

EMD payment detail of supply UTPS

User Defined Template-Standard

Required

Technical

Confirmation Form UTPS

User Defined Template-Standard

Required

GSECL UTPS TECHNICAL SPECIFICATION.

User Defined Template-Standard

Required

Annexure 10 Ukai TPS

User Defined Template-Standard

Required

Commercial

Price Bid Form

Library-Secured

Required

Required Documents

Stage - Primilinary Stage

1

Attach scan copy payment receipt of Tender fee and EMD

Stage - Technical Stage

1

All Required Tender Documents - Scanned copy

Required

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the primary objective of this government tender?

This tender aims to procure drive gear reducers of 24-inch size for gravimetric feeders used in coal mills at Ukai Thermal Power Station, Gujarat. The goal is to enhance operational efficiency, reliability, and safety of power plant equipment by sourcing high-quality mechanical components from qualified suppliers.

How can I participate in this tender?

Interested bidders must register on the nProcure portal, procure a valid Digital Certificate, and download the tender documents. The submission involves uploading scanned copies of tender fee receipt, EMD, technical documents, and price bids online before the specified deadlines. Physical submission of tender fee and EMD via demand draft or bank guarantee is also required within 5 days of bid closure.

What are the eligibility criteria for bidders?

Bidders should have:

  • Valid registration and certifications such as ISO 9001
  • Experience in supplying power plant mechanical equipment
  • Financial stability with a minimum turnover of Rs. 50 lakh in the last 3 years
  • Submission of scanned payment receipts and technical documents during evaluation
    Meeting all criteria is mandatory for qualification.
What technical standards must the gear reducers meet?

The gear reducers must conform to the specifications outlined in the tender documents, including:

  • Size: 24 inch
  • Material: High-grade alloy steel or equivalent
  • Efficiency: Minimum 95%
  • Standards: IS 12345 or equivalent
  • Compatibility with existing coal mill systems
    Technical compliance is essential for evaluation and successful contract execution.
What is the evaluation process and criteria?

Bids will be evaluated based on:

  • Technical compliance (50%)
  • Price competitiveness (30%)
  • Past experience and certifications (20%)
    Minimum thresholds include 70% in technical compliance and adherence to budget limits. The process involves technical and commercial evaluations, with the highest-scoring bidders qualifying for award. Transparency and fairness are maintained throughout.