• Supply of four (4) 4TR, 3-star inverter tower air conditioning units suitable for server room cooling.
• Installation of the air conditioners in the designated server room at the old SLDC building, Gotri, Vadodara.
• Testing and commissioning of the units to ensure operational efficiency and compliance with technical standards.
• Provision of all necessary accessories, mounting hardware, and electrical connections.
• Ensuring energy-efficient operation and adherence to safety standards.
• Post-installation support and warranty services as per tender specifications.
• The project must be completed within a period of 2 months from the date of contract signing.
| Technical Specifications |
Details |
| Model Type |
4TR, 3-star inverter tower AC |
| Power Supply |
230V/1Ph/50Hz |
| Cooling Capacity |
4 Ton |
| Energy Efficiency |
3-star rating |
| Installation Site |
Server room, Old SLDC building, Vadodara |
| Certification |
BIS certified units |
• Bidders must ensure all units meet the specified technical parameters and safety standards.