Open Power and Energy NPROCURE

Government Tender for Supply & Installation of Remote Position Sensors at Ukai TPS

Bid Publish Date

09-Dec-2025, 6:49 pm

Bid End Date

31-Jan-2026, 6:30 pm

Value

₹56,51,179

Location

Progress

Issue09-Dec-2025, 6:49 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

Power and Energy

Tender Fee

₹5,900

Contract Form

Supply

Completion Period

As per tender Document Attached

Currency Type

Single

Categories 10

This government tender from Gujarat State Electricity Corporation Limited (GSECL) offers an opportunity for suppliers specializing in instrumentation, automation, and power plant equipment to participate in the supply, erection, and commissioning of Remote Position Sensor Type Double Acting Smart Positioners for the Ukai Thermal Power Station. The project aims to upgrade control systems for the 1X500MW power plant, ensuring enhanced operational efficiency and automation. Bidders must meet strict eligibility criteria, submit comprehensive technical and financial proposals via the online nProcure portal, and adhere to detailed timelines. The tender includes multiple evaluation stages, with a focus on technical competence, cost-effectiveness, and delivery capability. The estimated project value is approximately INR 56.5 million. This tender is ideal for experienced firms in power plant automation, instrumentation, and electrical systems seeking to contribute to Gujarat’s power infrastructure modernization.

Scope Of Work

The scope of work includes:

  • Supply of Remote Position Sensor Type Double Acting Smart Positioners suitable for SADC systems.
  • Erection and installation of the supplied sensors at designated locations within Ukai TPS.
  • Commissioning of the sensors ensuring proper integration with existing control systems.
  • Testing and calibration to meet specified technical standards.

The key deliverables are:

  • Fully functional remote position sensors compatible with the plant's automation system.
  • Complete installation and commissioning reports.
  • Training and handover documentation.

The process involves:

  1. Review of tender documents and technical specifications.
  2. Preparation and submission of bid, including technical and financial proposals.
  3. Post-bid evaluation and clarification if required.
  4. Contract award and commencement of supply and installation activities.
  5. Final testing, commissioning, and handover.
Technical Specifications Details
Sensor Type Double Acting Smart Positioner
Compatibility SADC system of 1X500MW GSECL UKAI TPS
Power Supply 24V DC or as specified
Communication Protocol HART/Modbus (as applicable)
Environmental Conditions Temperature: -10°C to 60°C, Humidity: 0-95%

All work must adhere to safety standards and quality assurance protocols specified in the tender documents.

Technical Specifications

The remote position sensors must meet the following technical parameters:

Parameter Specification
Sensor Type Double Acting Smart Positioner
Power Supply 24V DC ±10%
Communication HART or Modbus protocol
Operating Temperature -10°C to 60°C
Environmental Protection IP66 or higher
Calibration Factory calibrated with certification

Sequential steps for technical compliance:

  1. Review technical specifications.
  2. Ensure compatibility with existing SADC systems.
  3. Submit technical datasheets and calibration certificates.
  4. Conduct onsite testing and calibration during installation.
  5. Obtain approval from GSECL authorities before final commissioning.

Financial Requirements

The estimated project cost is approximately INR 56,511,178.80. The financial proposal should include detailed cost breakdowns:

Cost Component Estimated Amount (INR)
Supply of Sensors 30,000,000
Erection & Installation 15,000,000
Commissioning & Testing 5,000,000
Documentation & Training 1,511,178.80
Contingency & Miscellaneous 5,000,000

Payment terms are as follows:

  • 30% advance at contract signing.
  • 40% upon delivery and installation.
  • 30% after successful commissioning.
    All payments are subject to submission of valid invoices and completion certificates. Bidders must specify their total bid amount inclusive of all taxes and duties.

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

✓ Must have valid certification and relevant experience in supplying instrumentation and automation equipment for power plants.
✓ Must submit scanned copies of payment receipt for tender fee and EMD during preliminary stage.
✓ All bidders should possess necessary technical certifications and comply with safety and quality standards.

Qualification Criteria Minimum Requirement
Financial Stability Turnover of at least INR 1 crore in the last 3 years
Experience Successfully executed at least 2 similar projects in power plants in India
Certification ISO 9001 or equivalent quality management certification
Technical Capability Proven capability to supply and commission remote position sensors

Note: Bidders must submit all required documents as specified in the tender notice to qualify for evaluation.

Bidding Process

Process Timeline

1. Primilinary Stage

02-02-2026 15:00

2. Technical Stage

02-02-2026 15:05

3. Commercial Stage

02-02-2026 15:30

Required Forms

Primilinary

Tender Fee Detail UTPS

User Defined Template-Standard

Required

EMD payment detail of supply UTPS

User Defined Template-Standard

Required

Technical

Confirmation Form UTPS

User Defined Template-Standard

Required

GSECL UTPS TECHNICAL SPECIFICATION.

User Defined Template-Standard

Required

Annexure 10 Ukai TPS

User Defined Template-Standard

Required

Commercial

ET-6178 PB (Supply+Work)

User Defined Template-Secured

Required

Required Documents

Stage - Primilinary Stage

1

Attach scan copy payment receipt of Tender fee and EMD

Stage - Technical Stage

1

All Required Tender Documents - Scanned copy

Required

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the deadline for bid submission?

The bid submission deadline is 01-01-2026 at 18:30 hours. Bidders must upload all required documents before this time to be eligible for evaluation.

What documents are required for the preliminary stage?

Bidders must submit scanned copies of the payment receipt for tender fee and EMD. These are mandatory for qualifying for the technical evaluation stage.

Can I submit physical documents?

Only the EMD and tender fee payment receipts need to be submitted physically within 5 days of bid submission. All other documents must be uploaded online via the nProcure portal.

What are the technical specifications for the sensors?

The sensors should be Double Acting Smart Positioners compatible with the SADC system at Ukai TPS, operating within -10°C to 60°C, with IP66 protection, and supporting HART/Modbus protocols. Detailed specifications are available in the tender documents.

How is the evaluation process conducted?

Evaluation is based on technical competence (40%), compliance with specifications (30%), cost (20%), and delivery/support schedule (10%). Minimum technical score is 70% for qualification.