Government Tender for Supply & Retrofitting of ESP Rapping System at KLTPS Unit 3

Bid Publish Date

30-Jan-2026, 7:00 pm

Bid End Date

23-Feb-2026, 6:00 pm

Progress

Issue30-Jan-2026, 7:00 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

Power and Energy

Tender Fee

₹1,770

Contract Form

Supply

Completion Period

3  Months

Currency Type

Single

Categories 17

This government tender invites qualified electrical contractors and suppliers to participate in the Supply & Retrofitting of ESP Rapping System at Unit 3 of Kutch Lignite Thermal Power Station (KLTPS). The project aims to enhance the efficiency of emission control systems by replacing and retrofitting critical components such as the Emitting Motor Control Panel and Collecting Motor Control Panel. The tender is issued by Gujarat State Electricity Corporation Limited (GSECL), a leading government organization in the power sector. Bidders must meet specific eligibility criteria, including valid GST registration and submission of EMD documents. The project offers an estimated value within a competitive range, with a completion period of 3 months. This opportunity is ideal for experienced electrical equipment suppliers and power plant maintenance firms seeking government contracts in Gujarat. The tender process involves online submission, technical evaluation, and award by a committee, ensuring transparency and fairness.

Scope Of Work

The scope of work includes:

  • Supply of ESP Rapping System components, including Emitting Motor Control Panel and Collecting Motor Control Panel
  • Retrofitting existing ESP systems at Unit 3 of KLTPS
  • Installation and commissioning of new control panels
  • Testing and validation of the retrofitted system

The key deliverables are:

  • Delivery of all electrical panels and components as per specifications
  • Complete installation at the designated site
  • Functional testing and performance validation
  • Providing necessary documentation and certifications

The process involves:

  1. Review of tender documents and specifications
  2. Preparation of technical bid and documentation
  3. Submission of bids via the online platform
  4. Technical evaluation by the committee
  5. Contract award and commencement of work
  6. Completion of retrofitting within 3 months
Specification Details
Power Supply 415V, 3-phase, 50Hz
Control Panel Type Custom-designed for ESP system
Certification As per Indian standards
Delivery Timeline Within 30 days of award

Bidder must ensure adherence to all technical specifications and safety standards as detailed in the tender documents.

Technical Specifications

The technical specifications for the ESP Rapping System include:

Parameter Specification
Control Panel Type Emitting and Collecting Motor Control Panels
Power Supply 415V, 3-phase, 50Hz
Material High-grade electrical components conforming to IS standards
Certification CE or BIS certification
Installation On existing ESP framework with minimal structural modifications

The process involves:

  1. Design review and approval
  2. Manufacturing as per approved drawings
  3. Delivery to site within specified timeline
  4. Installation and testing as per technical guidelines

Financial Requirements

The estimated project cost ranges between INR 50 Lakhs to INR 80 Lakhs. The financial breakdown includes:

Cost Component Estimated Cost
Equipment Supply INR 30 Lakhs
Installation & Commissioning INR 15 Lakhs
Testing & Certification INR 5 Lakhs
Contingencies INR 10 Lakhs

Payment terms are:

  • 30% advance upon contract signing
  • 50% after delivery and installation
  • 20% post successful testing and commissioning

Bidders must submit financial proposals in the prescribed format and adhere to the budget constraints specified in the tender documents.

Documents 2

KLTPS_53_ME-227_TB.pdf

TENDER_DOCUMENT

KLTPS_Comm__Terms_Cond_E-PROCUREMENT.pdf

TENDER_DOCUMENT

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

  • ✓ Must have valid GST Registration Certificate.
  • ✓ Submission of Tender Fee and EMD documents.
  • ✓ Proven experience in supplying electrical control panels for power plants.
  • ✓ Ability to complete the project within the stipulated 3 months.
  • ✓ Financial stability as per the attached qualification criteria.
Criteria Minimum Requirement
Annual Turnover INR 2 Crores
Experience At least 3 similar projects in power plants
Certification ISO 9001 or equivalent
Technical Capability Demonstrated expertise in ESP systems

Bidders must submit all required documents for preliminary and technical evaluation as specified in the tender notice.

Bidding Process

Process Timeline

1. Preliminary Stage
2. Technical Stage
3. Commercial Stage

Required Forms

Preliminary

KLTPS TF EMD Form

User Defined Template-Standard

Required

Technical

KLTPS Bidder Confirmation

User Defined Template-Standard

Required

Commercial

Price Bid Form

Library-Secured

Required

Required Documents

Stage - Preliminary Stage

1

Tender fee and EMD documents

Required
2

GSTN Registration Certificate

Required

Stage - Technical Stage

1

Attach Necessary Scan Document As per Tender

Required

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the main objective of this government tender?

This tender aims to supply and retrofit the ESP Rapping System at Unit 3 of Kutch Lignite Thermal Power Station (KLTPS). The focus is on replacing existing components such as the Emitting Motor Control Panel and Collecting Motor Control Panel to enhance emission control efficiency and ensure environmental compliance. It provides an excellent opportunity for electrical suppliers and maintenance firms to participate in a government project focused on power plant environmental upgrades.

What are the eligibility criteria for bidders?

Bidders must possess valid GST registration, submit the tender fee and EMD documents, and demonstrate experience in supplying electrical control panels for power plants. They should also have financial stability with an annual turnover of at least INR 2 Crores and proven expertise in ESP systems. All required documents must be submitted during the preliminary and technical stages, including certifications like ISO 9001. The process ensures only qualified firms participate, maintaining transparency.

How can I participate in the bidding process?

Participants must register on the official e-Procurement portal, download tender documents, and prepare technical and financial bids following the provided guidelines. Bids should be submitted electronically before the deadline (23-02-2026 18:00). The process involves technical evaluation, followed by financial assessment. Successful bidders will be notified for contract award. Bidders are encouraged to attend vendor training sessions scheduled weekly to facilitate smooth participation.

What is the project timeline and deadline for submission?

Bid submission starts on 30-01-2026 at 19:00 and closes on 23-02-2026 at 18:00. The last date to download tender documents is 23-02-2026 at 17:55. The project completion period is 3 months from the date of contract signing. All deadlines are strict, and late submissions will be rejected. The bid opening will be notified separately, ensuring transparency in the process.

Who can I contact for further assistance?

For queries and support, contact the Gujarat State Electricity Corporation Limited (GSECL) at:

  • Office: Kutch Lignite Thermal Power Station, Panandhro, Kutch, Gujarat
  • Phone: 9687662707
  • Email: [email protected]

Support hours are from Monday to Saturday, 9:00 AM to 5:00 PM. Bidders can also participate in vendor training sessions or seek clarifications via email to ensure compliance and successful bid submission.