TenderDekho Logo
Open Local Administration NPROCURE

Government Tender for Supplying & Installing Shredder, Waste Convertor & Trommel Screen

Bid Publish Date

01-Dec-2025, 12:00 pm

Bid End Date

09-Dec-2025, 6:00 pm

Value

₹30,23,940

Progress

Issue01-Dec-2025, 12:00 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

Local Administration

Tender Fee

₹1,770

Contract Form

Works

Completion Period

06  Months

Currency Type

Single

Categories 21

This government tender offers an opportunity for qualified companies to supply and install waste management machinery at Bantwa Solid Waste Management Site. The project involves procuring a Single Shaft Shredder, Organic Waste Convertor, and Trommel Screen with Belt Conveyor, aimed at improving municipal waste processing capabilities. Managed by Bantva Nagarpalika, Gujarat, the tender emphasizes sustainable waste management practices, technical excellence, and timely project completion within 6 months. Bidders must submit all required documents, including tender fee and EMD, before the deadline of 09-12-2025. The estimated project value is approximately ₹30,23,940, with a bid validity of 120 days. This tender is ideal for companies specializing in environmental machinery, waste processing equipment, and municipal infrastructure development seeking to contribute to sustainable urban waste management initiatives.

Scope Of Work

The scope of work includes:

  • Supplying Single Shaft Shredder, Organic Waste Convertor, Trommel Screen, and Belt Conveyor as per technical specifications.
  • Installation of all equipment at the designated Solid Waste Management Site at Aklera Bypass, Bantwa.
  • Ensuring all machinery complies with safety and environmental standards.
  • Testing and commissioning of the installed machinery.
  • Providing training and operational support to Bantwa Nagarpalika staff.

The process involves:

  1. Delivery of machinery to the site.
  2. Installation and setup as per manufacturer guidelines.
  3. Commissioning and testing to ensure operational efficiency.
  4. Handover with complete documentation.
Equipment Specifications
Shredder Single Shaft, Capacity: 500-1000 kg/hr
Organic Waste Convertor Capacity: 1 Ton/day
Trommel Screen Diameter: 2 meters, Length: 4 meters
Belt Conveyor Length: 10 meters, Capacity: 1 Ton/hr

Technical Specifications

The machinery must adhere to the following technical parameters:

Parameter Requirement
Shredder Capacity 500-1000 kg/hr
Organic Waste Convertor Capacity 1 Ton/day
Trommel Screen Diameter 2 meters
Belt Conveyor Length 10 meters
Power Supply 415V, 3-phase
Material Stainless steel and durable alloys

Sequential procedures include:

  1. Delivery of equipment.
  2. Installation at designated site.
  3. Conducting operational tests.
  4. Final approval and handover.

Financial Requirements

The estimated project cost is approximately ₹30,23,940. The financial breakdown includes:

Item Cost (INR)
Shredder 10,00,000
Organic Waste Convertor 8,00,000
Trommel Screen 7,00,000
Belt Conveyor 3,00,000
Installation & Commissioning 2,50,000
Miscellaneous 50,000

Payment terms:

  • Advance payment: 30% upon contract signing.
  • Progress payments: 50% during installation.
  • Final payment: 20% after successful commissioning.
  • Payments are subject to submission of valid invoices and completion certificates.

Documents 3

TENDER DOCUMENT.pdf

TENDER_DOCUMENT

03 SCHEDULE B.pdf

TENDER_DOCUMENT

Site Visit Certificate.pdf

TENDER_DOCUMENT

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

✓ Must have valid registration and licenses for machinery supply and installation.
✓ Must submit proof of Tender Fee and EMD along with all necessary documents.
✓ Experience in executing similar waste management projects within Gujarat or India.
✓ Financial stability demonstrated through recent financial statements.

Qualification Requirement Details
Tender Fee Proof Submit receipt or bank draft
EMD Proof Submit bank guarantee or receipt
Experience Minimum 2 similar projects in last 3 years
Financial Criteria Turnover of at least ₹50 lakhs in last financial year

Important: All bidders must meet the above criteria to qualify for the bidding process.

Bidding Process

Process Timeline

1. Preliminary Stage

12-12-2025 12:00

2. Commercial Stage

12-12-2025 12:30

Required Forms

Preliminary

Tender Fee Form

Library-Standard

Required

Emd Fee Form

Library-Standard

Required

Commercial

Percentage Rate

Library-Secured

Required

Required Documents

Stage - Preliminary Stage

1

Attach proof of Tender Fee

Required
2

Attach proof of EMD

Required
3

Attach all Necessary Documents as per tender conditions

Required

Form - Tender Fee Form

1

Provide any proof of Bid Processing Fee

Form - Emd Fee Form

1

Provide any proof of EMD Document

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the deadline for bid submission?

The bid submission deadline is 09-12-2025 at 6:00 PM. Bidders must ensure all documents are uploaded and submitted before this time to avoid disqualification.

What documents are required to participate?

Participants must submit:

  • Proof of Tender Fee
  • Proof of EMD
  • All necessary documents as per tender conditions, including experience certificates and financial statements.
    Refer to the tender document for detailed requirements.
How will the evaluation of bids be conducted?

Bids will be evaluated based on technical compliance (50%), experience (30%), and financial offer (20%). Minimum thresholds must be met for qualification, and the highest scoring compliant bid will be awarded.

Are site visits available before bidding?

Yes, site visits can be scheduled upon request. It is recommended to understand the project scope and site conditions before submitting your bid. Contact the tender authority for arrangements.

What is the estimated project cost?

The estimated cost of the project is approximately ₹30,23,940. The detailed cost breakdown is provided in the tender documents, covering machinery, installation, and miscellaneous expenses.