The scope of work encompasses the supply, installation, testing, and commissioning of electrical transmission infrastructure, including 66kV and 400kV lines, substations, and associated hardware. Key deliverables include:
- Design and engineering of electrical transmission lines and substations
- Supply of materials such as towers, conductors, insulators, and hardware
- Erection and stringing of transmission lines
- Construction of substations and associated civil works
- Testing, commissioning, and handover of completed infrastructure
The process involves the following steps:
- Review of technical specifications and site conditions
- Material procurement as per approved BOQ
- Erection of towers and stringing conductors
- Installation of electrical equipment in substations
- Testing and quality assurance
- Final commissioning and documentation
The project must adhere to safety standards, environmental regulations, and technical specifications outlined in the tender documents. The work must be completed within the stipulated 9 months, with periodic progress reports submitted to GETCO.
| Specification |
Requirement |
| Voltage Level |
66kV and 400kV |
| Material Standards |
IS/IEC compliant |
| Completion Period |
9 months |
| Quality Assurance |
ISO 9001 certified suppliers |
Bidders are expected to demonstrate technical capability, past project experience, and financial stability to undertake this large-scale electrical infrastructure project.