TenderDekho Logo
Open Power and Energy NPROCURE

Gujarat GETCO Tender for 66kV Transmission Line Erection - Power Sector Works

Bid Publish Date

10-Jul-2026, 7:30 am

Bid End Date

30-Jul-2026, 10:30 am

Value

₹1,12,65,287

Progress

Issue10-Jul-2026, 7:30 am
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

Power and Energy

Tender Fee

₹8,850

Contract Form

Works

Completion Period

08  Months

Currency Type

Single

Categories 8

Gujarat Energy Transmission Corporation Limited (GETCO) has issued a tender for the erection of a 66kV D/C Nadapa-Kanaiyabe transmission line in Kutch district. This power infrastructure project offers contractors specialized in electrical and transmission line works an excellent opportunity to participate in Gujarat’s expanding energy network. The scope includes foundation work, tower erection, conductor stringing, and OPGW installation, with a project duration of 8 months and an estimated value of INR 11.27 million. Bidders must meet strict eligibility criteria, including experience, licenses, and financial stability, and submit all documents via online portals before the deadline. The project aims to enhance power transmission capacity and reliability, contributing significantly to regional energy development. This tender is ideal for experienced electrical contractors seeking government infrastructure projects in Gujarat.

Scope Of Work

Erection of 66kV D/C Nadapa-Kanaiyabe transmission line on D/C Panther towers.
Installation of foundation, towers, and stringing of conductors and earth wires.
Installation of Optical Ground Wire (OPGW) along the transmission line.
Ensure compliance with technical specifications and safety standards.
Coordinate with GETCO officials for site inspections and approvals.

  1. Survey and site preparation.
  2. Foundation excavation and concreting.
  3. Tower erection and alignment.
  4. Stringing conductors and earth wires.
  5. Installation of OPGW and testing.
  6. Final inspection and commissioning.
Parameter Specification
Line Length Minimum 6.719 km
Voltage Class 66 kV and above
Tower Type D/C Panther Tower
Conductor D/C ACSR Panther
Special Features OPGW installation

All activities must adhere to safety and quality standards set by GETCO.

Technical Specifications

Transmission line on D/C Panther towers with a minimum length of 6.719 km.
Conductor type: D/C ACSR Panther.
Installation of OPGW for fiber optic communication.
Compliance with Indian Standards and GETCO specifications.
Sequential process involves survey, foundation, tower erection, conductor stringing, and testing.

Technical Parameter Requirement
Line Voltage 66 kV or above
Conductor D/C ACSR Panther
Tower Type D/C Panther Tower
OPGW Yes
Project Duration 8 months

All technical activities must be documented and approved by GETCO officials.

Financial Requirements

The estimated project cost is INR 11,265,287. Bidders must submit a bid with a detailed cost breakdown, including material, labor, and overheads. The bid should be valid for 180 days from the submission deadline. Payment terms include a bid security/Earnest Money Deposit (EMD), which must be submitted via online mode. The successful bidder will be paid in installments based on project milestones, with final payment upon commissioning. The financial bid should align with the technical proposal and meet the minimum turnover and liquidity criteria specified. The bid submission must include a bank solvency certificate of at least 20% of the bid amount, ensuring financial stability throughout the project duration.

Additional Tender Data

Commercial Details

Tender Category

Service

Tender Value

₹1,12,65,287

Bid To RA

No

Item Category

Electrical Works

Authority & Contact

Officer Inviting Bids

Superintending Engineer (AM) Anjar

Bid Opening Authority

Superintending Engineer (AM) Anjar

Address

Superintending Engineer (AM) Anjar,GETCO Circle office , 220 kV Power House Compound,Bhuj Road,GETCO, Post : Anjar., Pin 370110 Dist : Kutchh, Gujarat

Contact Details

2836242656

Authority Records

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 1

e-Tn-77-2026 Nadapa- Kanaiyabe line P-1 line.pdf

TENDER_DOCUMENT

Past Similar Tenders (Historical Results)

5 found

Invitation to Bid - Erection of 110 KV SC line on DC tower (17KM) with Panther conductor from existing Thuvakudy 230kV SS to K.Sathanur 110 kV SS with supply of all materials.(Loc 1 to 82, 86 to 87) . in TIRUCHIRAPPALLI, TAMIL NADU

TNEB Limited

TIRUCHIRAPPALLI, TAMIL NADU

Posted: 7 February 2026
Closed: 23 February 2026
EPROCURE

Bids are Invited For Replacement of ACSR Panther Conductor between Tower No. 07 to 11 at Ganga River crossing and other associated works of 132 KV Jwalapur- Chilla line in HARIDWAR, UTTARAKHAND

MD (Power Transmisison Corporation of Uttarakhand Limited)

HARIDWAR, UTTARAKHAND

Posted: 23 April 2026
Closed: 7 May 2026
EPROCURE

Open Tender for SUPPLY AND ERECTION FOR REPLACEMENT OF EXISTING PANTHER CONDUCTOR OF 33KV IROISEMBA-KHUMAN D/C (MINI TOWER) LINE FROM LOC NO. 57/0 TO 63/0 WITH COVERED PANTHER CONDUCTOR ON TURNKEY BASIS. in IMPHAL WEST, MANIPUR

N/A

IMPHAL WEST, MANIPUR

Posted: 16 October 2024
Closed: 6 December 2024
EPROCURE

Invitation to Bid - Erection of 110kV DC line on DC tower with panther conductor by making LILO the new 110kV Keezhakuppam - M.T.Kuppam feeder at the proposed Palayamkottai 110 KV Sub station in Cuddalore EDC( Loc 12 to 25)(REACH-2). in CUDDALORE, TAMIL NADU

TNEB Limited

CUDDALORE, TAMIL NADU

Posted: 15 November 2025
Closed: 29 November 2025
EPROCURE

Government Tender Published for Erection of 110kV DC line on DC tower with panther conductor by making LILO the new 110kV Keezhakuppam -M.T.Kuppam feeder at the proposed Palayamkottai 110 KV Sub station in Cuddalore EDC( Loc 1 to 11)(REACH-1). in CUDDALORE, TAMIL NADU

TNEB Limited

CUDDALORE, TAMIL NADU

Posted: 15 November 2025
Closed: 29 November 2025
EPROCURE

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

Must be a registered GETCO contractor of any class.
Experience in erecting 66kV or above transmission lines, minimum 6.719 km in last 3 financial years.
Work order copies and experience certificates for line erection work in GETCO or other STU/CTU.
Valid electrical contractor’s license.
Payment of tender fee and EMD via RTGS/NEFT/Online.
Active GST registration and PAN Card.
Latest bank solvency certificate of at least 20% of bid value.
Details of partners/directors, partnership deed or notarized affidavit.
Notarized Power of Attorney or signing authority.
Duly attested MSME registration (if applicable).
Last three years’ ITR and financial statements.
Minimum average annual turnover (MAAT) as per financial criteria.
Liquid assets not less than 20% of estimated bid value.
Positive net worth for last 3 financial years.
PF registration.
Tender acceptance on company letterhead.
Filled Annexure-14 and site verification confirmation.

Bidding Process

Process Timeline

1. Preliminary Stage

30-07-2026 16:30

2. Commercial Stage

Required Forms

Preliminary

Tender Fee Form

Library-Standard

Required

Emd Fee Form

Library-Standard

Required

Commercial

Percentage Rate

Library-Secured

Required

Required Documents

Stage - Preliminary Stage

1

Registration :The bidder shall be strictly a GETCO registered contractor of any class

Required
2

Technical Criteria: 1. Length of transmission line on towers/H-frame to be tenderized – The bidder should have erected transmission line including foundation,tower erection and stringing of conductor and earth wire of 66 kV and above class lines on towers/H-frame for as a main contractor or as a Sub Contractor in Single or multiple orders for length: -Minimum 6.719 km line in last 3 financial years Experience as a main contractor and as a sub-contractor.

Required
3

1) As a main contractor-work order copy and experience certificate as per technical criteria submitted to ascertain experience of line erection work of 66kV and/or above class in GETCO or other STU or CTU. ( Copy of W.O including Schedule-B + Work completion certificate duly signed by concern EE(Const)/EE(TR) )

4

2) As a sub-contractor-work order/PO copy of original contract and sub-contract,experience certificate from main contractor and statement of financial transactions for the same workorder/PO are to submitted to ascertain experience of line erection work of 66kV and/or above class in GETCO or other STU or CTU

5

Electrical contractor’s license with latest validation.

Required
6

Payment of Tender fee and EMD RTGS/ NEFT/ Online mode only

Required
7

Copy of GST Registration. GST No. must be online active

Required
8

Copy of PAN Card

Required
9

Latest Bank Solvency Certificate of any Scheduled Bank of a sum of minimum 20 Percentage of Bid Value.

Required
10

Details of partners/ Directors of the Firm/Company. Partnership Deed or Notarized Self affidavit on Rs. 300/- stamp paper in case of Proprietorship whichever is applicable.

Required
11

Copy of Notarized Power of Attorney or signing authority on bidder’s letter head as the case may be.

Required
12

Duly attested copy of MSME registration ( If applicable)

13

Copy of last three years’ ITR

Required
14

Copy of balance sheet and profit loss statement of last three years

Required
15

Bidder’s Minimum Average Annual Turnover(MAAT)for the best three years out of last five financial years as annualized shall not be less than the estimated amount of this tender Note-Annual gross revenue from operation/gross operating income as incorporated in the profit & loss account excluding other operative income/other income.

Required
16

Last quarter’s liquid Assets should not be less than 20 Percentage of estimated amount as on date of invitation of tender. > Note : For the purpose of arriving at LA current Assets Less Inventories shall be considered.

Required
17

Bidders Net worth for Last 3 financial years should be positive Note: 1. Audited, Verified and Certified Practicing Chartered Accountant certificate will be considered for Minimum Average Annual Turnover, Liquid Assets and Net worth. The provisional certificates will not be entertained. 2. Under taking in respect of reference to NCLT under Insolvency & Bankruptcy Code. The undertaking is to be furnished by the bidder in its bid as per the format attached and shall be deemed to be part ofthe bidding schedule and submitted along with QR Bid

Required
18

Copy of PF Registration

Required
19

Tender Acceptence in company’s letter pad.

Required
20

Filled Annexture-14 in company’s letter pad.

Required
21

Confirmation Regarding Site Verification in company’s letter pad

Required
22

Annexure-I,II,III in company’s letter pad

Required
23

Any Other as Per Tender Copy

Required

Form - Tender Fee Form

1

Provide any proof of Bid Processing Fee

Form - Emd Fee Form

1

Provide any proof of EMD Document

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the deadline for bid submission?

The bid submission deadline is 30th July 2026 at 16:00. Bidders must submit all required documents and bid fees before this time to be considered.

What are the eligibility criteria for bidders?

Bidders must be registered GETCO contractors, have experience in erecting 66kV or above transmission lines, possess valid electrical licenses, and demonstrate financial stability with adequate turnover, net worth, and liquidity. Specific documentation includes work orders, experience certificates, financial statements, and licenses.

What technical specifications are required for the project?

The project involves erecting a minimum 6.719 km 66kV transmission line on D/C Panther towers with OPGW installation. The line must meet Indian standards, with proper foundation, tower erection, conductor stringing, and fiber optic installation, all adhering to GETCO specifications.

How is the evaluation of bids conducted?

Bids are evaluated based on technical experience (40%), financial strength (30%), and past performance (20%). A minimum score of 60 points is required to qualify. The process includes document verification, technical assessment, and financial comparison.

Where can I find the tender documents and download the forms?

Tender documents are available for download at the official NPROCURE portal. Bidders must complete the Tender Fee Form and EMD Fee Form, submitting them via online mode before the deadline. All forms and documents must be properly filled and attested as per instructions.

Similar Tenders

5 found

Erection Work of 66kV D/C Nadapa-Kanaiyabe on D/C Panther tower with D/C ACSR Panther Conductor Line with OPGW (Work under Construction div. Anjar) Pkg- 2 (AP-23 to Nadapa ss).

Gujarat Energy Transmission Corporation Limited

📍 KUTCH, GUJARAT

Est: ₹75.7 L
⏰ Deadline: 3 weeks left
🛒 Type: Service
View NPROCURE
Urgent

Erection of 66kV Kotda( R)-Khirsara line LILO to 66kV (Proposed 220kV Gadhsisa) SS on D/C Panther Tower with ACSR Panther conductor(Under Anjar Construction Division) approved under KSY-II) Pkg-2 (AP-22 to AP-42 (stringing up to AP-43))

Gujarat Energy Transmission Corporation Limited

📍 KUTCH, GUJARAT

Est: ₹1.1 Cr
⏰ Deadline: 7 days left
🛒 Type: Service
View NPROCURE
Urgent

Erection of 66kV Kotda( R)-Khirsara line LILO to 66kV (Proposed 220kV Gadhsisa) SS on D/C Panther Tower with ACSR Panther conductor(Under Anjar Construction Division) approved under KSY-II) Pkg-1 (AP-1 to AP-21 (stringing up to AP-22))

Gujarat Energy Transmission Corporation Limited

📍 KUTCH, GUJARAT

Est: ₹1.0 Cr
⏰ Deadline: 7 days left
🛒 Type: Service
View NPROCURE

Erection for 66KV Baraya substation to 66 kV Patri substation S/C line partly on D/C Panther tower with ACSR Panther conductor with OPGW under R&M 2025-26 construction Division Anjar Pkg-2 (from AP-17 (stringing from AP-16) to 66kV Patri SS)

Gujarat Energy Transmission Corporation Limited

📍 KUTCH, GUJARAT

Est: ₹89.6 L
⏰ Deadline: 2 weeks left
🛒 Type: Service
View NPROCURE

Erection of 66KV Bhadiya substation to 66 kV Gundiyali substation S/C line on D/C Panther tower with ACSR Panther conductor with OPGW under R&M 2025-26 construction Division Anjar Pkg-1 (from Bhadiya ss to AP-21)

Gujarat Energy Transmission Corporation Limited

📍 KUTCH, GUJARAT

Est: ₹1.2 Cr
⏰ Deadline: 2 weeks left
🛒 Type: Service