Gujarat Energy Transmission Corporation Limited (GETCO) invites qualified electrical contractors to participate in a Bi-Annual Rate Contract (Bi-ARC) for comprehensive survey, route alignment, and original survey work on various 66kV transmission lines. This tender encompasses modern survey techniques, including route alignment and detailed line surveys, under the construction division at Anjar. The project aims to enhance power transmission infrastructure in Gujarat, ensuring reliable electricity distribution. Bidders must meet strict eligibility criteria, including GETCO registration, technical experience, financial stability, and valid licenses. The contract duration is 24 months, with a total estimated cost of approximately INR 58,69,556. Interested companies specializing in electrical works, survey services, and transmission line construction are encouraged to bid. This opportunity offers a significant role in strengthening Gujarat’s power infrastructure, contributing to regional development and energy security.
• Conduct comprehensive survey and route alignment for various 66kV transmission lines using modern survey techniques.
• Complete original survey work, including detailed line mapping and alignment verification.
• Prepare route alignment reports, survey data, and technical documentation.
• Coordinate with GETCO officials for site verification and data collection.
• Ensure compliance with safety standards and technical specifications.
| Parameter | Specification |
|---|---|
| Line Length | Minimum 100 RKM per project |
| Survey Techniques | Modern, GPS-based, Total Station |
| Data Format | Digital and hard copies |
| Project Duration | 24 months |
| Location | Anjar, Gujarat |
• All survey activities must adhere to safety and environmental standards.
• Bidders should have prior experience with similar projects and submit relevant certificates and work orders.
• Survey methods must include GPS-based total stations and modern geospatial tools.
• Data accuracy should meet industry standards for transmission line surveys.
• All survey data must be submitted in digital format compatible with GETCO systems.
• The survey team should include qualified engineers with relevant experience.
• Sequential process:
| Parameter | Technical Requirement |
|---|---|
| Survey Tools | GPS, Total Station, GIS software |
| Data Accuracy | ± 10 cm |
| Data Format | GIS-compatible files, PDFs |
| Team Qualification | Engineers with minimum 3 years experience |
| Project Timeline | 24 months |
The project has an estimated cost of INR 58,69,556. Payment will be made in installments based on milestones achieved, including submission of survey reports and route alignment documents. The bid must include a detailed cost breakdown:
| Cost Component | Amount (INR) |
|---|---|
| Survey & Data Collection | 40% |
| Report Preparation | 30% |
| Final Documentation | 20% |
| Contingency & Miscellaneous | 10% |
Payment Terms:
All payments are subject to compliance with contractual obligations and submission of necessary supporting documents.
Tender Category
Service
Bid To RA
No
Item Category
Electrical Works
Officer Inviting Bids
Superintending Engineer (TR) Anjar
Bid Opening Authority
Superintending Engineer (TR) Anjar
Address
Superintending Engineer (TR) Anjar,GETCO Circle office , 220 kV Power House Compound,Bhuj Road,GETCO, Post : Anjar., Pin 370110 Dist : Kutchh, Gujarat
Contact Details
2836242656
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
TENDER_DOCUMENT
Discover companies most likely to bid on this tender
| Qualification | Minimum Requirement |
|---|---|
| Registration | GETCO registered contractor |
| Experience | 100 RKM survey in last 3 years |
| License | Valid electrical license |
| Financial | 20% of bid value as bank solvency |
| Documentation | Complete supporting documents as listed |
12-01-2026 16:30
13-01-2026 16:00
Tender Fee Form
Library-Standard
Emd Fee Form
Library-Standard
Percentage Rate
Library-Secured
Registration :The bidder shall be strictly a GETCO registered contractor.
RequiredTechnical Criteria: The bidder should have completed preliminary survey work of minimum 100 RKM of 66KV or Above Class Transmission Line of GETCO within last 03 financial years (from the due date of opening of technical bid). As a Main Contractor. Sub late not allow. • Experience Certificate. Copy of complete work order executed with satisfactory completion certificate indicating line length from respective department should be submitted (In Form-3A)
RequiredElectrical contractor’s license with latest validation.
RequiredPayment of Tender fee and EMD
RequiredLatest Bank Solvency Certificate of any Scheduled Bank of a sum of minimum 20 Percentage of Bid Value.
RequiredCopy of GST Registration. GST No. must be online active. Copy of online active GST should be attached with the technical bid.
RequiredCopy of PAN Card
RequiredDetails of partners/ Directors of the Firm/Company. Partnership Deed or Notarized Self affidavit on Rs. 300/- stamp paper in case of Proprietorship whichever is applicable.
RequiredCopy of Notarized Power of Attorney or signing authority on bidder’s letter head as the case may be.
RequiredDuly attested copy of MSME registration ( If applicable)
Copy of last three years’ ITR
RequiredCopy of balance sheet and profit loss statement of last three years
RequiredCopy of PF Registration PF No. must be online active
RequiredTender acceptance on bidder’s letter pad
RequiredFilled Annexture-14 on bidder’s letter pad
RequiredAnnexure-I,II,III on bidder’s letter pad
RequiredSite Varification Certificate
RequiredDeclaration Of Conflict On Interest
RequiredDECLARATION FOR RELATIONSHIP WITH EMPLOYEE
RequiredTechnical bid (All pages of TENDER i.e. technical specification & condition etc. of TENDER with stamp & signature. Also, all the annexure must duly have filled by bidder
RequiredAny other Documents as per Tender Copy
RequiredProvide any proof of Bid Processing Fee
Provide any proof of EMD Document
Key insights about GUJARAT tender market
This tender aims to appoint qualified contractors for Bi-Annual Rate Contract (Bi-ARC) to conduct survey, route alignment, and original survey work on various 66kV transmission lines in Gujarat. The project involves modern survey techniques to improve power transmission infrastructure, ensuring reliable electricity supply across the region.
Eligible bidders must be GETCO registered electrical contractors with experience in surveying at least 100 RKM of 66kV or above transmission lines within the last three financial years. They must also possess a valid electrical license, active GST registration, and meet financial criteria such as 20% of bid value as bank solvency. Supporting documents include experience certificates, licenses, and financial statements.
The tender starts on 23-12-2025 with document download available immediately. The last date for bid submission is 12-01-2026 at 16:00. Technical evaluation occurs on 12-01-2026 at 16:30, followed by commercial evaluation on 13-01-2026 at 16:00. The contract award is expected shortly after these evaluations.
Bidders must use GPS-based survey tools and modern geospatial techniques to ensure data accuracy within ±10 cm. All survey data should be submitted in digital GIS-compatible formats. The survey team must include qualified engineers with at least 3 years of experience. The process involves planning, field data collection, data processing, and report submission, all aligned with industry standards.
Payments are linked to project milestones: 20% advance at contract signing, 50% after field survey completion, and 30% after final report approval. The total estimated cost is INR 58,69,556. Payment is contingent upon submission of supporting documents and compliance with contractual terms.