Gujarat Metro Rail Utility Diversion Tender | Ahmedabad Phase 3C Utility Shifting

Bid Publish Date

05-Aug-2026, 2:20 pm

Bid End Date

05-Sep-2026, 9:30 am

Value

₹13,82,00,000

Progress

Issue05-Aug-2026, 2:20 pm
AwardPending

Gujarat Metro Rail Corporation (GMRC) Limited is inviting bids for Utility Identification & Diversion/Shifting for the Ahmedabad Metro Rail Project, Phase 3C. This critical civil works tender involves relocating utilities along key corridors to facilitate metro construction, ensuring minimal disruption to existing services. The project covers utility mapping, planning, and execution of utility shifts such as water, electricity, gas, and telecom lines, with a project value of approximately INR 138.2 million and a completion timeline of 10 months. Bidders must meet strict eligibility criteria, including technical experience, financial stability, and legal compliance. The open tender process encourages qualified civil contractors and utility specialists to participate, with deadlines in September 2026. This opportunity is ideal for companies specializing in large-scale utility diversion, civil infrastructure, and urban development projects, aiming to contribute to Gujarat’s urban transit expansion and smart city initiatives.

Scope Of Work

The scope of work includes:

  • Utility Identification: Precise locating and documentation of existing utilities along the specified corridors.
  • Utility Diversion Planning: Developing detailed diversion plans compliant with local regulations.
  • Utility Shifting Execution: Physical shifting of utilities such as water, electricity, gas, telecom, and other services.
  • Coordination with Stakeholders: Liaising with utility service providers and local authorities for approvals and scheduling.
  • Safety and Compliance: Ensuring all activities adhere to safety standards and environmental regulations.

The process involves:

  1. Site survey and utility mapping.
  2. Preparation of diversion plans and obtaining necessary approvals.
  3. Mobilization of equipment and workforce.
  4. Execution of utility shifting as per approved plans.
  5. Quality assurance and documentation.
  6. Final inspection and handover.
Utility Type Description Expected Duration
Water Supply Relocation of pipelines 2 months
Electrical Lines Shifting of cables and poles 3 months
Gas Lines Utility disconnection and rerouting 2 months
Telecom Rerouting of telecom cables 1 month
Other Utilities As per site requirement 2 months

Technical Specifications

The technical specifications include:

  • Utility Mapping Accuracy: Minimum positional accuracy of ±0.5 meters.
  • Materials: Use of approved, high-quality pipes, cables, and conduits.
  • Equipment: Deployment of trenchless technology where applicable.
  • Safety Standards: Compliance with local safety and environmental regulations.
  • Documentation: Detailed as-built drawings, test reports, and certification.
Parameter Specification
Utility Mapping Accuracy ±0.5 meters
Material Standards IS/ISO approved
Equipment Trenchless technology tools
Safety Compliance OSHA and local standards

Sequential process:

  1. Site survey and utility detection.
  2. Design of diversion plan.
  3. Procurement of materials and permits.
  4. Execution of utility shifting.
  5. Inspection, testing, and documentation.

Financial Requirements

The estimated project cost is INR 138.2 million. Bidders must submit a bid security of INR 1,382,000 (INR 13.82 lakh). The financial proposal should include:

Cost Component Amount (INR)
Total Bid Value 138,200,000
Bid Security 1,382,000
Payment Terms 30% advance, 50% during execution, 20% on completion

Payments will be released based on milestone completion and certification by GMRC. Bidders should provide detailed cost breakdowns, including taxes, duties, and contingencies, as per tender guidelines.

Tender Data

Bid Details

Tender Type

Open

Sector

Public Sector Undertakings & Joint Venture

Tender Fee

₹25,000

Contract Form

Works

Completion Period

10  Months

Currency Type

Single

Bid Submission Start

05-08-2026 19:50:00

Document Download End

05-09-2026 15:00:00

Bid Validity

180 Days

Additional Tender Data

Commercial Details

Tender Category

Service

Tender Value

₹13,82,00,000

Bid To RA

No

Item Category

Civil Works - Others

Authority & Contact

Officer Inviting Bids

GM - Contract

Bid Opening Authority

GM - Contract

Address

Gujarat Metro Rail Corporation (GMRC) Limited (SPV of Govt. of Gujarat and Govt. of India)Block No.1, First Floor, Karmayogi Bhavan, Behind Nirman Bhavan, Sector 10/A, Gandhinagar: 382010, Gujarat, India

Contact Details

07923248572

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

20260805 NIT-1.pdf

TENDER_DOCUMENT

1.2 ITT Utility Shifting 1.pdf

TENDER_DOCUMENT

1.3 FOT Utility Shifting 1.pdf

TENDER_DOCUMENT

1.4 GCC Utility Shifting 1.pdf

TENDER_DOCUMENT

1.5 SCC Utility Shifting 1.pdf

TENDER_DOCUMENT

1.6 SOW Utility Shifting 1.pdf

TENDER_DOCUMENT

1.7.SHE Utility Shifting 2.pdf

TENDER_DOCUMENT

1.8 BOQ Utility Shifting 1.pdf

TENDER_DOCUMENT

Authority & Contact

Organization

Gujarat Metro Rail Corporation (GMRC) Ltd.

Department

GMRC Limited Commercial Department

Officer Inviting Bids

GM - Contract

Bid Opening Authority

GM - Contract

Contact Details

07923248572

Address

Gujarat Metro Rail Corporation (GMRC) Limited (SPV of Govt. of Gujarat and Govt. of India)Block No.1, First Floor, Karmayogi Bhavan, Behind Nirman Bhavan, Sector 10/A, Gandhinagar: 382010, Gujarat, India

Categories 4

Bidding Process

Process Timeline

1. Technical Bid

05-09-2026 15:30

2. Financial Bid

Required Forms

Technical

Tender Fee Form

Library-Standard

Required

Emd Fee Form

Library-Standard

Required

Financial

Annexure – 1, Summary Sheet of Bill of Quantity

User Defined Template-Secured

Required

Annexure- 2, DETAILS OF TAXES AND DUTIES (Tax Bifurcation) INR: Indian Rupees

User Defined Template-Secured

Required

Annexure - 13A, Proforma for Statement of Minor Deviations

User Defined Template-Secured

Required

Required Documents

Stage - Technical Bid

1

Signed and Scan copy of Index of Technical Bid

Required
2

Documentary Evidence of online payment of Tender Fees instrument

Required
3

Documentary Evidence of online payment of Tender Security or e-BG

Required
4

Signed and Scan copy of duly filled form Appendix – 6 with necessary attachment such as copy Power of Attorney, BR, MOA, AOA, MOU, Certificate of Incorporation as applicable

Required
5

GST Registration Certificate

Required
6

Signed and Scan copy of duly filled form Appendix – 17 with necessary attachment (i.e. work experience certificate, other documents as mentioned in Tender Document)

Required
7

Signed and Scan copy of duly filled form and certified by Chartered Accountant of Appendix – 18, Financial Data

Required
8

Last five years Audited Balance Sheet

Required
9

Signed and Scan copy of duly filled set of other Form of Tenders with necessary attachments

Required
10

Signed and Scan copy duly filled Annexures as applicable and provided in ITT

Required
11

Any other document as per the requirement of Tender

Form - Tender Fee Form

1

Provide any proof of Bid Processing Fee / Exemption Certificate

Required

Form - Emd Fee Form

1

Provide any proof of EMD Document / BG Document / Exemption Certificate

Required

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

✓ Must have valid GST Registration Certificate.
✓ Proven experience in utility diversion or similar civil works within the last 5 years.
✓ Financial stability with audited balance sheets for the past five years.
✓ Demonstrable technical capacity with relevant equipment and skilled personnel.
✓ Submission of all required technical and financial documentation, including:

Document Description
Signed Index of Technical Bid To be submitted online
Proof of Tender Fee Payment Receipt or bank proof
Proof of Tender Security Bank Guarantee or EMD proof
Incorporation Documents MOA, AOA, Certificate of Incorporation
GST Certificate Valid registration
Work Experience Certificates For relevant projects
Financial Data Certified by Chartered Accountant
Audited Balance Sheets Last five years
Other Tender Forms As specified in tender documents

Note: Bidders must meet all technical, financial, and legal eligibility criteria to qualify for participation.

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the primary scope of this utility diversion tender?

This tender involves utility identification and diversion/shifting for the Ahmedabad Metro Rail Project, Phase 3C, covering utilities such as water, electrical, gas, and telecom along specified corridors. The goal is to facilitate metro construction without disrupting existing services.

What are the eligibility criteria for bidders?

Bidders must possess valid GST registration, demonstrate relevant experience in utility shifting projects, submit financial documents including audited balance sheets, and provide all required technical and legal documentation as specified in the tender guidelines.

How can I participate in the bidding process?

Participants should download tender documents online, attend pre-bid meetings if required, submit all technical and financial documents via the official portal before the deadline, and ensure compliance with all submission guidelines to qualify for evaluation.

What is the estimated project value and payment terms?

The estimated project cost is approximately INR 138.2 million. Payment will be made in milestones: 30% advance, 50% during execution, and 20% on completion, subject to certification by GMRC.

What technical standards must be followed?

All work must adhere to IS/ISO standards, with utility mapping accuracy of ±0.5 meters, use of approved materials, and compliance with local safety and environmental regulations. Proper documentation and testing are mandatory.