Gujarat State Electricity Corporation Limited invites qualified contractors to bid on a government tender for repairing and replacing inlet and outlet air ducts at the Gandhinagar Thermal Power Station (GTPS). This power sector project involves working on 210 MW units 3, 4, and 5, ensuring optimal performance and safety. The tender emphasizes technical expertise, safety standards, and timely completion within an 18-month period. Bidders must submit their proposals through an online portal before the deadline of October 30, 2026. The project offers a significant opportunity for experienced EPC contractors specializing in power plant ducting, mechanical repairs, and infrastructure upgrades. The tender process includes detailed technical and financial evaluation, with clear milestones and documentation requirements. This initiative aims to enhance the efficiency and reliability of Gujarat's power infrastructure, contributing to sustainable energy production and operational excellence.

Scope Of Work

The scope of work includes:

  • Repairing and replacing inlet and outlet air ducts for PA Fans connected to Coal Mills A to F.
  • Duct work for FD Fans of units 3, 4, and 5.
  • Ensuring all duct connections are sealed and compliant with safety standards.
  • Inspection and testing of repaired/replaced ducts to ensure operational efficiency.

The process involves:

  1. Site assessment and preparation.
  2. Removal of existing damaged ducts.
  3. Fabrication and installation of new ducts as per specifications.
  4. Inspection, testing, and commissioning.
Specification Details
Duct Material MS/SS as per technical specifications
Duct Size Refer to technical drawings
Coating Anti-corrosive coating for durability
Compliance Must meet safety and environmental standards
  • Key deliverables:
    • Complete duct replacement for specified units.
    • Documentation of work and testing reports.
    • Adherence to safety protocols.

All work must be completed within the stipulated completion period of 18 months, ensuring minimal disruption to power plant operations.

Technical Specifications

The technical specifications require:

Parameter Specification
Duct Material Mild Steel (MS) or Stainless Steel (SS) as per design
Thickness Minimum 2 mm for inlet/outlet ducts
Coating Anti-corrosive, heat resistant coating
Duct Size As per detailed drawings provided in tender documents
Connection Flanged or welded as per standards
Testing Pressure and leak tests to be conducted post-installation

The process involves:

  • Fabrication of ducts as per technical drawings.
  • Surface preparation and coating.
  • Installation with proper sealing.
  • Conducting pressure tests and certification.

All procedures must adhere to safety standards and manufacturer guidelines, with documentation provided for each stage.

Financial Requirements

The estimated project cost ranges between Rs. 50 Lakhs to Rs. 1 Crore, depending on scope and materials used. The financial breakdown includes:

Item Cost (Rs.)
Material To be quoted by bidder
Labour To be quoted by bidder
Equipment To be quoted by bidder
Miscellaneous Contingencies and overheads

Payment terms are as follows:

  • 10% advance upon award of contract.
  • 40% after completion of duct removal.
  • 40% after installation and successful testing.
  • 10% retention after final acceptance.

Bidders must submit financial proposals in the prescribed format, valid for 180 days from bid submission date.

Advertisement

Tender Data

Bid Details

Tender Type

Open

Sector

Power and Energy

Tender Fee

₹1,770

Contract Form

Works

Completion Period

18  Months

Currency Type

Single

Bid Submission Start

09-10-2026 18:00:00

Document Download End

30-10-2026 18:00:00

Bid Validity

180 Days

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Item Category

Miscellaneous Works

Authority & Contact

Officer Inviting Bids

CHIEF ENGINEER (G)

Bid Opening Authority

CHIEF ENGINEER (G)

Address

CHIEF ENGINEER (GEN.), GUJARAT STATE ELECTRICITY CORPORATION LTD, Gandhinagar TPS.

Contact Details

[email protected]

Authority Records

GUJARAT STATE ELECTRICITY CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 1

GTPS_Tender _ EW-360_28_09_2026.pdf

TENDER_DOCUMENT

Authority & Contact

Department

Thermal Power Station, Gandhinagar

Officer Inviting Bids

CHIEF ENGINEER (G)

Bid Opening Authority

CHIEF ENGINEER (G)

Contact Details

[email protected]

Address

CHIEF ENGINEER (GEN.), GUJARAT STATE ELECTRICITY CORPORATION LTD, Gandhinagar TPS.

Categories 5

Advertisement

Bidding Process

Process Timeline

1. Preliminary Stage

06-11-2026 15:00

2. Technical Stage

06-11-2026 15:10

3. Price Bid

Required Forms

Preliminary

Tender Fee Form

Library-Standard

Required

Emd Fee Form

Library-Standard

Required

Technical

PARTY DETAILS

User Defined Template-Standard

Required

Stop Deal And Black List

User Defined Template-Standard

Required

Certificate-A

User Defined Template-Standard

Required

Bidder Confirmation

User Defined Template-Standard

Required

Price

GTPS Price Bid EW-360

User Defined Template-Secured

Required

Required Documents

Stage - Preliminary Stage

1

Attach scan copy of Tender Fee & EMD

Required

Stage - Technical Stage

1

Attach scan copy of supporting documents as per tender

Required

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

✓ Must have valid registration and licenses for executing power plant mechanical works.
✓ Must attach scan copies of Tender Fee & EMD documents for preliminary submission.
✓ Proven experience in duct repair and replacement projects at thermal power plants.
✓ Demonstrated technical capability with relevant certifications.
✓ Financial stability as per the following criteria:

Parameter Minimum Requirement
Turnover Rs. 5 Crores in last 3 years
Experience At least 3 similar projects completed in power sector
Certification ISO 9001, 14001, OHSAS 18001 (or equivalent)

✓ Bidders must submit technical documents supporting their experience and compliance.
✓ All supporting documents should be valid, clear, and legible.

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the deadline for bid submission?

The bid submission deadline is 30th October 2026 at 18:00 hours. Bidders must upload all required documents before this time to be considered.

What are the eligibility criteria for bidders?

Eligible bidders must have relevant experience in power plant duct works, valid licenses, and meet financial stability requirements. They must submit supporting documents such as past project certificates, financial statements, and technical certifications as specified in the tender.

How can I access the tender documents?

Tender documents are available for free download from the official procurement portal. Bidders need to register on the portal and can access the documents via the provided link. A pre-bid meeting will be held on 06-11-2026 for clarifications.

What technical standards must the duct work meet?

The ducts must be fabricated using MS or SS materials with a minimum thickness of 2 mm, coated with anti-corrosive paint, and tested for pressure and leaks post-installation. All work must comply with safety and environmental standards outlined in the tender.

What is the estimated project cost?

The estimated project cost ranges between Rs. 50 Lakhs and Rs. 1 Crore, depending on scope and materials. Payment will be made in installments based on project milestones, with a total duration of 18 months.