TenderDekho Logo
Open Petroleum and Natural Gas NPROCURE

Tender for Pipeline Route Survey for City Gas Distribution & Transmission in Madhya Pradesh

Bid Publish Date

30-Jul-2025, 7:00 am

Bid End Date

25-Aug-2025, 1:00 pm

EMD

₹8,900

Progress

Issue30-Jul-2025, 7:00 am
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

Petroleum and Natural Gas

Contract Form

Fixed-rate

Completion Period

12  Months

Currency Type

Single

Categories 5

This government tender offers a unique opportunity for experienced companies in pipeline surveying and GIS mapping to participate in a major infrastructure development project in Madhya Pradesh. The project involves conducting detailed route surveys for city gas distribution and transmission pipelines, supporting sustainable energy initiatives. Bidders must meet strict eligibility criteria, including technical expertise and financial stability, and follow a structured bidding process with multiple evaluation stages. The project duration is 12 months, with a fixed-rate contract managed by Gujarat Gas Limited. Key deadlines for bid submission are from July 30, 2025, to August 20, 2025. Successful bidders will contribute to the expansion of natural gas infrastructure, ensuring safety, efficiency, and compliance with industry standards. This tender is ideal for companies specializing in pipeline survey, GIS data collection, environmental assessments, and infrastructure development, seeking to collaborate with a leading government sector organization to support energy security and urban growth.

Scope Of Work

The scope of work for this tender includes:

  • Conducting detailed pipeline route surveys for city gas distribution and transmission projects in Madhya Pradesh.
  • Mapping and GIS data collection to identify optimal pipeline routes.
  • Environmental impact assessments and feasibility studies.
  • Preparation of technical reports, route plans, and survey documentation.
  • Compliance with safety standards and government regulations.

Key deliverables include:

  • Completed survey reports with detailed maps.
  • GIS datasets and digital route models.
  • Environmental and social impact assessment reports.
  • Final technical documentation for project approval.

Sequential process:

  1. Site reconnaissance and initial survey planning.
  2. Data collection using GPS, drone, and other surveying tools.
  3. Data analysis and route optimization.
  4. Environmental and social impact assessments.
  5. Compilation of survey reports and submission.
Specification Details
Survey Area Madhya Pradesh cities and rural areas for pipeline routes
Survey Type Topographical, environmental, GIS mapping
Duration 12 months
Deliverables Route maps, GIS datasets, impact reports

Important Requirements:

  • Use of latest surveying technology.
  • Adherence to safety and environmental standards.
  • Submission of all reports in prescribed formats.
  • Coordination with Gujarat Gas Limited and local authorities.

Technical Specifications

The technical specifications for this survey include:

Parameter Specification
Survey Accuracy ±0.5 meters
Data Collection Tools GPS, drone-mounted cameras, GIS software
Environmental Standards Compliance with local environmental regulations
Data Formats GIS shapefiles, CAD drawings, PDF reports
Reporting Weekly progress reports, final comprehensive survey report

Sequential procedures:

  1. Mobilization of survey team and equipment.
  2. Site reconnaissance and initial data collection.
  3. Detailed surveying using GPS and drone technology.
  4. Data processing and analysis.
  5. Final report preparation and submission.

Technical notes:

  • Use high-precision GPS units.
  • Ensure data security and backup.
  • Follow safety protocols during field surveys.

Financial Requirements

The project has a fixed-rate contract basis with a total estimated budget of INR 25 Lakhs. The financial breakdown includes:

Cost Component Amount (INR)
Survey Operations 15 Lakhs
Data Processing & Analysis 5 Lakhs
Reporting & Documentation 3 Lakhs
Miscellaneous & Contingency 2 Lakhs

Payment Schedule:

  • 30% advance upon contract signing.
  • 40% after submission of preliminary reports.
  • 30% upon final acceptance.

Important terms:

  • All payments are subject to approval of deliverables.
  • Bidders must submit detailed financial proposals with itemized costs.

Documents 2

Section -III Schedule of Rates -MadhyaPradesh.pdf

TENDER_DOCUMENT

Section III - Revised Schedule of Rates -MadhyaPradesh.pdf

TENDER_DOCUMENT

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

Bidders must meet the following eligibility criteria:

  • ✓ Must have valid registration and licensing for pipeline surveying and GIS mapping.
  • ✓ Proven experience in conducting pipeline route surveys for natural gas projects.
  • ✓ Financial stability with annual turnover of at least INR 50 lakhs in the last three years.
  • ✓ Demonstrated capability to complete projects within stipulated timelines.
  • ✓ Possession of necessary technical equipment and skilled personnel.
  • ✓ Compliance with all applicable environmental, safety, and industry standards.
Qualification Criteria Minimum Requirement
Annual Turnover INR 50 Lakhs (last 3 years)
Experience At least 2 similar projects in the last 5 years
Certification Valid ISO 9001/14001/45001 certification
Technical Equipment GPS, GIS software, drone survey tools

Note: Bidders must submit relevant documents and certificates as proof of eligibility.

Bidding Process

Process Timeline

1. Primary Stage

26-08-2025 10:30

2. Technical Stage

26-08-2025 10:40

3. Commercial Stage

26-08-2025 10:50

Required Forms

Primary

EMD with UTR Details

User Defined Template-Standard

Required

Technical

Technical Bid Submission

User Defined Template-Standard

Required

Commercial

SOR for ARC - ROUTE SURVEY FOR PIPELINE PROJECTS - MADHYAPRADESH

User Defined Template-Secured

Required

Required Documents

Documents required

1

Section -III Schedule of Rates -MadhyaPradesh.pdf

2

Section III - Revised Schedule of Rates -MadhyaPradesh.pdf

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the main objective of this tender?

This tender aims to select qualified companies to conduct detailed pipeline route surveys for City Gas Distribution and transmission pipelines in Madhya Pradesh, facilitating safe and efficient natural gas infrastructure development.

Who can participate in this tender?

Eligible bidders include companies with proven experience in pipeline surveying, GIS mapping, and environmental assessments, possessing valid licenses, technical equipment, and financial stability as specified in the eligibility criteria.

What are the key deadlines for bid submission?

The bid submission starts on 30-07-2025 at 12:30 PM and closes on 20-08-2025 at 6:30 PM. Bidders must ensure timely submission through the nProcure portal to avoid disqualification.

What technical standards must the survey meet?

Survey accuracy should be within ±0.5 meters, utilizing GPS, drone, and GIS tools. Data must be in specified formats like shapefiles and CAD, with comprehensive environmental compliance and safety protocols followed during data collection.

How will the evaluation of bids be conducted?

Bids will be evaluated based on technical competence (50%), financial proposal (30%), past project performance (10%), and compliance with specifications (10%). A minimum technical score of 70% is required for qualification.