TenderDekho Logo
Open Local Administration NPROCURE

Porbandar Storm Water Management Tender for Infrastructure Development & Maintenance

Bid Publish Date

04-Sep-2025, 4:30 am

Bid End Date

18-Sep-2025, 12:30 pm

EMD

₹5,59,468

Value

₹5,59,46,868

Progress

Issue04-Sep-2025, 4:30 am
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

Local Administration

Tender Fee

₹14,160

Contract Form

Works

Completion Period

9  Months

Currency Type

Single

Categories 13

This government tender from Porbandar Municipal Corporation offers a significant opportunity for civil engineering and infrastructure companies to participate in the development of storm water management systems. The project involves master planning, civil works, and 7-year operation & maintenance to address ingress and erosion issues in Porbandar, Gujarat. With an estimated value of approximately 56 million INR, the tender emphasizes technical expertise, compliance, and timely delivery. Bidders must meet strict eligibility criteria, submit comprehensive documentation, and adhere to deadlines. This project aims to enhance urban resilience, improve drainage infrastructure, and support sustainable city growth. The tender process is conducted electronically through the official portal, with detailed technical and contractual specifications provided in the downloadable documents. Participation in this project will contribute to Porbandar’s urban development goals and offer lucrative opportunities for experienced civil contractors and water management firms.

Scope Of Work

The scope of work includes:

  • Conducting detailed master planning for storm water management in Porbandar.
  • Designing infrastructure to prevent ingress & erosion, including drainage systems, channels, and related civil works.
  • Preparing detailed drawings and technical specifications.
  • Procuring necessary materials and equipment as per approved specifications.
  • Construction, installation, and commissioning of storm water infrastructure.
  • Providing comprehensive operation & maintenance (O&M) services for 7 years post-completion.

Key deliverables include:

  • Detailed project reports and master plan documents.
  • Technical drawings and construction schedules.
  • Procurement of materials as per specifications.
  • Complete civil and infrastructural works.
  • Ongoing maintenance and operational support.
Specification Details
Completion Period 9 months
Estimated Cost 55,946,867 INR
Contract Type Works
Location Porbandar, Gujarat

Sequential process:

  1. Tender document review and clarification.
  2. Submission of technical and financial bids.
  3. Bid evaluation and selection.
  4. Contract signing.
  5. Project execution and supervision.
  6. Final inspection and handover.
  7. Operation & Maintenance for 7 years.

Technical Specifications

The technical specifications include:

Parameter Requirement
Civil Works Complete storm water drainage system including channels, inlets, and outlets
Material Standards As per IS codes and project drawings
Design Load Designed for maximum rainfall intensity as per Gujarat standards
Construction Quality Use of durable, weather-resistant materials
Testing All components must pass quality and performance tests as specified in the tender documents

Sequential procedures:

  • Review technical drawings and specifications.
  • Procure materials meeting technical standards.
  • Execute civil works following approved plans.
  • Conduct testing and quality assurance.
  • Complete installation and commissioning.

Financial Requirements

The project has an estimated cost of approximately 55.94 million INR, which includes all civil works, materials, and O&M services. The tender fee is set at 14,160 INR, and the EMD amount is 559,468 INR. Payment terms are as follows:

  • 10% advance upon contract signing.
  • 40% during project milestones.
  • 50% on project completion and acceptance.
  • Final payment after successful operation & maintenance for 7 years.
Cost Component Amount (INR)
Tender Fee 14,160
EMD 559,468
Estimated Project Cost 55,946,867
Total Budget Approx. 56 million INR

All payments will be subject to compliance with contractual milestones and quality standards.

Documents 21

01-Porbandar-Phase-I-Godhaniya-SBD.pdf

TENDER_DOCUMENT

02-Schedule-B-Porbandar Part 1 Godhaniya.pdf

TENDER_DOCUMENT

03-Godhaniya-Preamble and Payment Schedules.pdf

TENDER_DOCUMENT

04-Drawings.pdf

TENDER_DOCUMENT

05-Make List.pdf

TENDER_DOCUMENT

06-TEST SCHEDULE.pdf

TENDER_DOCUMENT

07-01_GR_P-1_.pdf

TENDER_DOCUMENT

07-02_GR_P-2.pdf

TENDER_DOCUMENT

07-03_GR_P-3.pdf

TENDER_DOCUMENT

07-04_GR_P-4.pdf

TENDER_DOCUMENT

08-DMO 2799 11-Mar-2024 662.pdf

TENDER_DOCUMENT

09-GR TESTING.pdf

TENDER_DOCUMENT

10_A_P-1_GENERAL TECHNICAL SPECIFICATION _ELECTRICAL -1-33.pdf

TENDER_DOCUMENT

11-BUILDING SPECIFICATON (1).pdf

TENDER_DOCUMENT

12-ROAD SPECIFICATION.pdf

TENDER_DOCUMENT

13-Technical Specification for Civil work.pdf

TENDER_DOCUMENT

14-OandM - Scope and Specification-R1.pdf

TENDER_DOCUMENT

15-Itemwise Technical Specification for Civil work-Godhaniya R1.pdf

TENDER_DOCUMENT

16-Itemwise Tech._Speci._Electrical_Work Godhaniya R1.pdf

TENDER_DOCUMENT

10_A_P-2_GENERAL TECHNICAL SPECIFICATION _ELECTRICAL -34-63.pdf

TENDER_DOCUMENT

Corrigendum-1 Note-Godhaniya (2nd Attempt).pdf

TENDER_DOCUMENT

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

Bidders must meet the following criteria:

  • ✓ Must have valid tender fee and EMD submitted as per tender requirements.
  • ✓ Proven experience in civil infrastructure projects, especially urban storm water management.
  • ✓ Demonstrate financial stability with an estimated project cost of at least 55.94 million INR.
  • ✓ Possess necessary licenses, certifications, and technical qualifications.
  • ✓ Submit all required documents including tender fee proof, EMD proof, and other specified certifications.
Qualification Criterion Details
Tender Fee Submission proof required
EMD Submission proof required
Experience Minimum 3 similar projects completed in last 5 years
Financial Capacity Annual turnover of at least 10 million INR for last 3 years
Certifications Valid registration, GST, and relevant technical licenses

Note: Only bids with complete documentation and compliance will be considered.

Bidding Process

Process Timeline

1. PRELIMINARY

18-09-2025 18:05

2. COMMERICAL

18-09-2025 18:10

Required Forms

PRELIMINARY

Tender Fee Form

Library-Standard

Required

Emd Fee Form

Library-Standard

Required

COMMERICAL

Percentage Rate

Library-Secured

Required

Required Documents

Stage - PRELIMINARY

1

TENDER FEE

Required
2

EMD

Required
3

AS PER TENDER CRITERIA

Required

Form - Tender Fee Form

1

Provide any proof of Bid Processing Fee

Required

Form - Emd Fee Form

1

Provide any proof of EMD Document

Required

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the main objective of this tender?

This tender seeks qualified contractors to develop a comprehensive storm water management system in Porbandar, including infrastructure development and 7-year operation & maintenance, to mitigate ingress and erosion issues.

Who can participate in this tender?

Eligible bidders include civil engineering firms, water management specialists, infrastructure contractors, and companies with proven experience in urban storm water projects, possessing valid licenses and certifications.

What are the key deadlines for bid submission?

Bid submissions open on 04-09-2025 at 10:00 AM and close on 18-09-2025 at 6:00 PM. The bid opening will occur immediately after the deadline, at 6:05 PM on 18-09-2025. Ensure timely submission to avoid disqualification.

What documents are required to bid?

Bidders must submit the tender fee proof, EMD proof, technical experience certificates, financial statements, and other certifications as specified in the tender documents. All documents must be uploaded electronically via the official portal.

How is the bid evaluated?

Bids are evaluated based on technical competence (50%), financial bid (30%), and past project experience (20%). Minimum thresholds must be met, and the most competitive bid will be awarded the contract following transparent evaluation procedures.