TenderDekho Logo
Active GEM

E-municipalities Uttar Pradesh LED Luminaire Tender Ghazipur IS 10322 Part 5 2026

Bid Publish Date

13-Oct-2026, 8:31 pm

Bid End Date

20-Oct-2026, 9:00 pm

Progress

Issue13-Oct-2026, 8:31 pm
AwardPending

Key Highlights

  • • LED luminaire procurement for road and street lighting conforming to IS 10322 Part 5/Section 3 (V3)
  • • Quantity flexibility: +25% at contracted rates during contract and currency of contract
  • • Mandatory Detailed Design Drawings submission within 5 days of award; approvals or modification list within 5 days
  • • 3+ years of govt department/Govt PSU supply experience required; contract copies to be submitted

Tender Overview

The procuring organization is the E-municipalities division of the Urban Development Department, Uttar Pradesh, seeking LED luminaires for road and street lighting conforming to IS 10322 (Part 5/Section 3) (V3). The project location is Ghazipur, Uttar Pradesh (PIN 232325). Key procurement elements include a flexible quantity option up to 25% at contracted rates and a mandatory detailed design drawing approval process prior to fabrication. Bidders must demonstrate three years of government supply experience and maintain non-obsolete product status with OEM involvement. The tender emphasizes adherence to specified IS standard and timely delivery against approved drawings. This tender targets suppliers capable of meeting government distribution timelines and post-approval design modifications, with GST considerations handled per actuals.

Key Specifications

  • LED luminaire for road and street lighting

  • IS 10322 (Part 5/Section 3) (V3) compliance

  • 2+ years residual market life (not obsolete within 2 years)

  • 3+ years govt/PSU supply experience

  • GST as actuals or lower of quoted GST

  • Detailed Design Drawings approval prior to fabrication

Terms & Conditions

  • Option clause allows 25% quantity variation at contract rates

  • Approval of Detailed Design Drawings within 5 days post-award

  • 3 years govt procurement experience required with contract copies

Important Clauses

Payment Terms

GST reimbursement based on actuals or lower quoted rate; no fixed percentage stated

Delivery Schedule

Delivery aligned to approved drawings; extended delivery time calculated by (increased quantity / original quantity) × original delivery period with minimum 30 days

Penalties/Liquidated Damages

LD terms not explicitly provided; delivery shifts due to drawing approval implied

Bidder Eligibility

    • Must not be under liquidation or bankruptcy; provide undertaking
    • Regularly manufactured and supplied similar LED luminaire to Govt/PSU for 3+ years
    • Not declared end-of-life by OEM within the next 2 years
Advertisement

Tender Data

Bid Details

Quantity

80

Bid Type

Two Packet Bid

Bid Validity

70 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

45

OEM Avg. Turnover

67

Past Performance

80 %

Warranty Period

1 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Q2)

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

65

Delivery Locations

1

Delivery Cities

Ghazipur

Delivery Pincodes

232326

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ghanshyam Singh232326,Nagar Panchayat Dildarnagar GhazipurGhazipurUttar Pradesh2323268065-

Authority Records

URBAN DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10031021.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

Office Name

Nagar Panchayat Dildarnagar

Grievance Contact

[email protected]

Categories 5

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

- GST registration certificate

2

- PAN card

3

- Experience certificates showing 3+ years Govt/PSU supply

4

- Financial statements (last 3 years)

5

- EMD/security deposit documents as per bid norms

6

- Technical bid documents and product specifications

7

- OEM authorization or dealership certificates

8

- Detailed Design Drawings (within 5 days of award)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for LED luminaire tender in Ghazipur Uttar Pradesh?

Bidders must meet 3+ years govt/PSU supply experience, provide Detailed Design Drawings within 5 days of award, and ensure IS 10322 (Part 5/Section 3) (V3) compliant luminaires with non-obsolete products. Prepare GST details and OEM authorizations; follow the 25% quantity option clause and submission of all required documents to participate.

What documents are required for LED street light procurement in UP?

Submit GST registration, PAN, 3+ years govt/PSU experience certificates, financial statements, EMD/security deposit documents, technical bid and OEM authorization, plus Detailed Design Drawings within 5 days of award; ensure non-obsolescence and compliance with IS 10322 standards.

What standards govern the Ghazipur LED lighting tender 2026?

Tenders require IS 10322 (Part 5/Section 3) (V3) compliance for LED luminaires; suppliers must ensure OEM confirmation of product lifecycle and avoid end-of-life declarations within the next 2 years.

When is the delivery period adjusted after drawing approval delays?

Delivery is refixed without LD for the period of delay in approval of Detailed Design Drawings; the extension uses the formula: (increased quantity / original quantity) × original delivery period, with a minimum of 30 days.

How is GST reimbursement handled in this UP LED tender?

GST reimbursement will be per actuals or at the applicable rate, whichever is lower, and cannot exceed the quoted GST percentage. Vendors should account for GST during bid pricing and post-award adjustments.

What is the eligibility criterion for suppliers of LED luminaires to UP govt?

Suppliers must have 3+ years of regular govt/PSU supply experience in the same category, provide contract copies, and ensure the offered luminaires are not end-of-life within the next two years per OEM.

What happens if a bidder is not approved on Detailed Drawings?

If the buyer raises modifications, the supplier must implement those in approved drawings and resubmit; approval or modification list within 5 days is required to proceed with fabrication and delivery.

Advertisement