Progress
Public procurement opportunity for Assam Rifles Item No. 1, Item No. 2, Item No. 3, Item No. 4, Item No. 5, Item No. 6, Item No. 7, Item No. 8, Item No. 9, Item No. 10, Item No. 11, Item No. 12, Item No. 13, Item No. 14, Item No. 15, Item No. 16, Item No. 17, Item No. 18, Item No. 19, Item No. 20, Item No. 21, Item No. 22, Item No. 23, Item No. 24, Item No. 25, Item No. 26, Item No. 27, Item No. 28, Item No. 29, Item No. 30, Item No. 31, Item No. 32, Item No. 33, Item No. 34 in CHANDEL, MANIPUR. Quantity: 336 issued by. Submission Deadline: 25-09-2026 10: 00: 00. View full details and respond.
Quantity
336
Category
Item No. 1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
10 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
15
Past Performance
10 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Item No. 1 , Item No. 2 , Item No. 3 , Item No. 4 , Item No. 5 , Item No. 6 , Item No. 7 , Item No. 8 , Item No. 9 , Item No. 10 , Item No. 11 , Item No. 12 , Item No. 13 , Item No. 14 , Item No. 15 , Item No. 16 , Item No. 17 , Item No. 18 , Item No. 19 , Item No. 20 , Item No. 21 , Item No. 22 , Item No. 23 , Item No. 24 , Item No. 25 , Item No. 26 , Item No. 27 , Item No. 28 , Item No. 29 , Item No. 30 , Item No. 31 , Item No. 32 , Item No. 33 , Item No. 34
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Chandel
Delivery Pincodes
795135
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sachu C | 795135,HQ 26 Sector Assam Rifles Pallel, District Chandel(Kakching), Manipur(MN)-795135 | Chandel | Manipur | 795135 | 1 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Item No. 1
Annual maintenance charges for overhauling of 63 KVA Genr sets with replacement following existing spare parts as per direction of engr- in-charge
Item No. 2
Cylinder line assembly with oring
Item No. 3
Piston assembly with piston pin and piston ring
Item No. 4
Head Gasket
Item No. 5
Main bearing
Item No. 6
CR Bearing
Item No. 7
Valve pair inlet outlet
Item No. 8
Valve seal insert inlet
Item No. 9
Valve seal insert exhaust
Item No. 10
Valve Guide
Item No. 11
Valve stem seal
Item No. 12
Lube oil pump
Item No. 13
Rear bearing
Item No. 14
Turbo Charger
Item No. 15
Thrust washer
Item No. 16
Fly wheel oil seal
Item No. 17
Rear oil seal
Item No. 18
Gasket rocker Cover
Item No. 19
Annual maintenance charges for repair/replacement of 250KVA/125/100 KVA Genr sets with replacement following existing spare parts as per direction of engr- in-charge
Item No. 20
AVR 250 KVA,125 KVA&100 KVA
Item No. 21
Panel Board repair
Item No. 22
Exhaust Manifold (Silencer and existing spare parts repair)
Item No. 23
Coolant
Item No. 24
Fan Belt as per sample
Item No. 25
Radiator Repairing, cleaning and re-fixing
Item No. 26
Oil pump repairing
Item No. 27
Fuel Pump repairing
Item No. 28
Head repairing
Item No. 29
supply an fixing of diesel fuel filter primary and secondary as per sample and direction of engr -in-charge
Item No. 30
supply an fixing of air filter primary and secondary as per sample and direction of engr -in-charge
Item No. 31
supply an fixing of fuel line primary and secondary as per sample and direction of engr -in-charge
Item No. 32
supply an replacement of engine oil as per sample and direction of engr -in-charge
Item No. 33
supply an replacement of Bty terminal connector as per sample and direction of engr -in-charge
Item No. 34
Repair of Governor as per dirction of engr-in-charge
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Item No. 1 | Annual maintenance charges for overhauling of 63 KVA Genr sets with replacement following existing spare parts as per direction of engr- in-charge | 1 | job | 26sectengr | 120 | |
| 2 | Item No. 2 | Cylinder line assembly with oring | 10 | set | 26sectengr | 120 | |
| 3 | Item No. 3 | Piston assembly with piston pin and piston ring | 10 | set | 26sectengr | 120 | |
| 4 | Item No. 4 | Head Gasket | 2 | nos | 26sectengr | 120 | |
| 5 | Item No. 5 | Main bearing | 2 | nos | 26sectengr | 120 | |
| 6 | Item No. 6 | CR Bearing | 2 | nos | 26sectengr | 120 | |
| 7 | Item No. 7 | Valve pair inlet outlet | 12 | nos | 26sectengr | 120 | |
| 8 | Item No. 8 | Valve seal insert inlet | 12 | nos | 26sectengr | 120 | |
| 9 | Item No. 9 | Valve seal insert exhaust | 12 | nos | 26sectengr | 120 | |
| 10 | Item No. 10 | Valve Guide | 12 | nos | 26sectengr | 120 | |
| 11 | Item No. 11 | Valve stem seal | 12 | nos | 26sectengr | 120 | |
| 12 | Item No. 12 | Lube oil pump | 2 | nos | 26sectengr | 120 | |
| 13 | Item No. 13 | Rear bearing | 2 | nos | 26sectengr | 120 | |
| 14 | Item No. 14 | Turbo Charger | 2 | nos | 26sectengr | 120 | |
| 15 | Item No. 15 | Thrust washer | 2 | nos | 26sectengr | 120 | |
| 16 | Item No. 16 | Fly wheel oil seal | 2 | nos | 26sectengr | 120 | |
| 17 | Item No. 17 | Rear oil seal | 2 | nos | 26sectengr | 120 | |
| 18 | Item No. 18 | Gasket rocker Cover | 2 | nos | 26sectengr | 120 | |
| 19 | Item No. 19 | Annual maintenance charges for repair/replacement of 250KVA/125/100 KVA Genr sets with replacement following existing spare parts as per direction of engr- in-charge | 1 | job | 26sectengr | 120 | |
| 20 | Item No. 20 | AVR 250 KVA,125 KVA&100 KVA | 3 | nos | 26sectengr | 120 | |
| 21 | Item No. 21 | Panel Board repair | 2 | nos | 26sectengr | 120 | |
| 22 | Item No. 22 | Exhaust Manifold (Silencer and existing spare parts repair) | 2 | nos | 26sectengr | 120 | |
| 23 | Item No. 23 | Coolant | 60 | ltr | 26sectengr | 120 | |
| 24 | Item No. 24 | Fan Belt as per sample | 6 | nos | 26sectengr | 120 | |
| 25 | Item No. 25 | Radiator Repairing, cleaning and re-fixing | 3 | nos | 26sectengr | 120 | |
| 26 | Item No. 26 | Oil pump repairing | 2 | nos | 26sectengr | 120 | |
| 27 | Item No. 27 | Fuel Pump repairing | 2 | nos | 26sectengr | 120 | |
| 28 | Item No. 28 | Head repairing | 2 | nos | 26sectengr | 120 | |
| 29 | Item No. 29 | supply an fixing of diesel fuel filter primary and secondary as per sample and direction of engr -in-charge | 10 | nos | 26sectengr | 120 | |
| 30 | Item No. 30 | supply an fixing of air filter primary and secondary as per sample and direction of engr -in-charge | 10 | nos | 26sectengr | 120 | |
| 31 | Item No. 31 | supply an fixing of fuel line primary and secondary as per sample and direction of engr -in-charge | 6 | nos | 26sectengr | 120 | |
| 32 | Item No. 32 | supply an replacement of engine oil as per sample and direction of engr -in-charge | 120 | ltr | 26sectengr | 120 | |
| 33 | Item No. 33 | supply an replacement of Bty terminal connector as per sample and direction of engr -in-charge | 4 | nos | 26sectengr | 120 | |
| 34 | Item No. 34 | Repair of Governor as per dirction of engr-in-charge | 2 | nos | 26sectengr | 120 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer