TenderDekho Logo
Closed GEM

Procurement Opportunity: Test setup of Measuring instruments,Test Setup or switchgear,ACB Control Panel Setup,Tube light stu in BANGALORE, KARNATAKA

Bid Publish Date

11-Sep-2026, 11:19 am

Bid End Date

10-Oct-2026, 10:00 am

EMD

₹56,457

Generate Docs

Progress

Issue11-Sep-2026, 11:19 am
Corrigendum03-Oct-2026
AwardPending

Hmt International announces a tender for Test setup of Measuring instruments, Test Setup or switchgear, ACB Control Panel Setup, Tube light study Kit, Panel of Single Phase Fan AC Induction Motor circuit panel, Induction motor Study panel, Control panel of Motor Reversing Circuit, Control Panel of DOL starter, Control Panel of auto transformer starter, Control panel of star delta starter, Control Panel of VFD Test setup, Control Panel soft starter for three phase induction motor, Lead acid battery Test setup, Control Panel of Feeder, Warranty for all above equipment for 3 years from date of acceptance certificate from end user in BANGALORE, KARNATAKA. Quantity: 15. Submission Deadline: 10-10-2026 10: 00: 00. Last date to apply is approaching fast!

Advertisement

Authority & Contact

Organization

Hmt International

Office Name

Hmt International Limited Bangalore

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

15

Category

Test setup of Measuring instruments

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

85

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Test setup of Measuring instruments , Test Setup or switchgear , ACB Control Panel Setup , Tube light study Kit , Panel of Single Phase Fan AC Induction Motor circuit panel , Induction motor Study panel , Control panel of Motor Reversing Circuit , Control Panel of DOL starter , Control Panel of auto transformer starter , Control panel of star delta starter , Control Panel of VFD Test setup , Control Panel soft starter for three phase induction motor , Lead acid battery Test setup , Control Panel of Feeder , Warranty for all above equipment for 3 years from date of acceptance certificate from end user

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

18

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Bengaluru Urban

Delivery Pincodes

560032

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Neethu V560032,HMT Bhavan #59 Bellary RoadBengaluru UrbanKarnataka560032190-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9879987.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

Test setup of Measuring instruments

As per enclosed specification or ATC document

1 set Delivery: 90 days
#2

Test Setup or switchgear

As per enclosed specification or ATC document

1 set Delivery: 90 days
#3

ACB Control Panel Setup

As per enclosed specification or ATC document

1 set Delivery: 90 days
#4

Tube light study Kit

As per enclosed specification or ATC document

1 set Delivery: 90 days
#5

Panel of Single Phase Fan AC Induction Motor circuit panel

As per enclosed specification or ATC document

1 set Delivery: 90 days
#6

Induction motor Study panel

As per enclosed specification or ATC document

1 set Delivery: 90 days
#7

Control panel of Motor Reversing Circuit

As per enclosed specification or ATC document

1 set Delivery: 90 days
#8

Control Panel of DOL starter

As per enclosed specification or ATC document

1 set Delivery: 90 days
#9

Control Panel of auto transformer starter

As per enclosed specification or ATC document

1 set Delivery: 90 days
#10

Control panel of star delta starter

As per enclosed specification or ATC document

1 set Delivery: 90 days
#11

Control Panel of VFD Test setup

As per enclosed specification or ATC document

1 set Delivery: 90 days
#12

Control Panel soft starter for three phase induction motor

As per enclosed specification or ATC document

1 set Delivery: 90 days
#13

Lead acid battery Test setup

As per enclosed specification or ATC document

1 set Delivery: 90 days
#14

Control Panel of Feeder

As per enclosed specification or ATC document

1 set Delivery: 90 days
#15

Warranty for all above equipment for 3 years from date of acceptance certificate from end user

As per enclosed specification or ATC document

1 set Delivery: 90 days

Categories 50

Corrigendum Updates

1 Update
#1

Update

03-Oct-2026

Extended Deadline

10-Oct-2026, 4:30 am

Opening Date

11-Oct-2026, 4:30 am

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

11

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer