Bid Publish Date
29-Aug-2026, 4:37 pm
Bid End Date
08-Sep-2026, 5:00 pm
Location
Progress
The procurement opportunity is issued by the Uttar Pradesh Cooperative Sugar Factories Federation Limited for Bare Copper Wire 4 SWG. Although BOQ items are not listed and exact quantities are not disclosed, the tender involves a copper conductor with 4 SWG sizing. The buyer retains quantity flexibilities of ±25% and may exercise this option at contract award or during the currency of the contract, at contracted rates. Delivery timelines commence from the last date of the original delivery order, with a minimum additional time of 30 days when extending quantities. An ATC document has been uploaded for bidder reference. This tender requires bidders to consider potential quantity variations and implement scalable supply planning.
Option Clause permits ±25% quantity variation at contract award and during currency
Delivery period starts from the last date of the original delivery order; extended time uses calculated formula
ATC document governs bidder obligations; no explicit EMD or payment terms shown in data
Quantity may be increased by up to 25% at contract placement and during currency; delivery time extension uses (Increase quantity / Original quantity) × Original delivery period with a 30-day minimum
Bidder must review and comply with Buyer Uploaded ATC document; terms not fully disclosed in the public data
BOQ shows zero items; bidders should prepare for non-itemized procurement and propose quantities accordingly
Proven ability to supply bare copper wire in similar gauge (4 SWG) to large buyers
Financial stability demonstrated by recent statements and ability to scale on short notice
Compliance with ATC guidelines and any OEM authorization requirements
Quantity
25
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
20 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
BARE COPPER WIRE 4 SWG
Advisory Bank
Bank Of Baroda
ePBG Percentage
3%
ePBG Duration (Months)
12
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Bareilly
Delivery Pincodes
243203
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Narendra Mohan Srivastav | 243203,The Kisan Sahakari chini mill Semikhera, Bareilly (U.P) Pin Code -243203 GST NO-09AAAAK3453A1Z3 Contact no -+9186504 81688,7880888935 | Bareilly | Uttar Pradesh | 243203 | 25 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar copper wire supply
Financial statements / auditor reports demonstrating financial capacity
EMD/Security deposit documentation (as applicable under clause - specify amount if viewable in ATC)
Technical bid documents including product specifications and compliance statements
OEM authorizations (if bidding as an authorized distributor)
Any ATC-specific documents uploaded by the buyer
Bidders must submit GST registration, PAN, experience certificates, and financials, plus any OEM authorizations with the technical bid. The tender allows +/-25% quantity variation at contract award, and delivery terms start from the original delivery order date. Review the ATC for compliance specifics and ensure capacity to scale production.
Submit GST and PAN documents, recent financial statements, experience certificates for similar supply, EMD/Security deposit proof if applicable, OEM authorization letters, and the technical bid with product compliance declarations. Include ATC-compliant documents as uploaded by the buyer and ensure submissions align with tender guidelines.
Delivery terms allow a quantity increase up to 25% at contract placement or during contract currency. The additional time is computed using the formula (Increase quantity ÷ Original quantity) × Original delivery period, with a mandatory minimum of 30 days. Delivery starts from the last date of the original delivery order.
Download and thoroughly review the ATC document uploaded by the buyer. Ensure all stated conditions, formatting, and submission requirements are met in the technical bid. Align your bid with ATC instructions, including any additional certifications or declarations specified.
Provide exact product specification for 4 SWG bare copper wire, proof of capacity to meet potential quantity increases, and evidence of OEM authorization if applicable. Include manufacturing lead times, quality assurances, and any ISI or ISO certifications if referenced in ATC guidance.
The BOQ shows no itemized quantities (Total Items: 0), indicating a non-standard scope. Bidders should prepare a scalable supply plan, propose prices for multiple quantity bands, and be ready to fulfill orders arising from ±25% quantity variations at contracted rates.
Eligible bidders must demonstrate supplier capability for bare copper wire of 4 SWG, provide financial stability documents, and possession of necessary registrations. Compliance with ATC, OEM authorizations, and prior similar project experience will strengthen eligibility for UP government procurement.
Bidders should monitor the procurement portal for opening and closing dates; the current data does not specify exact dates. Ensure readiness of technical and financial bids, and confirm EMD details and submission deadlines from the ATC and portal notifications.