TenderDekho Logo
GEM

Bids are Invited For Integrated Ducting Cooler Cooling Capacity upto 700 Sqft,Integrated Ducting Cooler Cooling Capacity in JABALPUR, MADHYA PRADESH

Bid Publish Date

19-Dec-2024, 8:48 pm

Bid End Date

09-Jan-2025, 9:00 pm

EMD

₹30,000

Progress

Issue19-Dec-2024, 8:48 pm
Technical22-12-2024 15:58:02
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

4339

Categories 40

Indian Army has released a public tender for Integrated Ducting Cooler Cooling Capacity upto 700 Sqft, Integrated Ducting Cooler Cooling Capacity upto 1200 Sqft, Integrated Ducting Cooler Cooling Capacity upto 1600 Sqft, Duct Fabrication 24 Gage Iron Sheet, Weather-Proof Canvas, Thermal Insulation 6mm, Powder Coated Aluminium Grill Dual Deflection, MS Cooler Stand, VC Protector Starter for 3 Phase Machine, Standard Installation Charges for Integrated Ducting Cooler in JABALPUR, MADHYA PRADESH. Quantity: 4339. Submission Deadline: 09-01-2025 21: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Integrated Ducting Cooler Cooling Capacity upto 700 Sqft , Integrated Ducting Cooler Cooling Capacity upto 1200 Sqft , Integrated Ducting Cooler Cooling Capacity upto 1600 Sqft , Duct Fabrication 24 Gage Iron Sheet , Weather-Proof Canvas , Thermal Insulation 6mm , Powder Coated Aluminium Grill Dual Deflection , MS Cooler Stand , VC Protector Starter for 3 Phase Machine , Standard Installation Charges for Integrated Ducting Cooler

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-7275812.pdf

Main Document

View File

Referenced Document

attached categories, trials are allowed as per approved procurement policy of the buyer nodal Ministries)

Referenced Document

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
AIR VIEW   Under PMA
-22-12-2024 15:58:02
2
DSupply   Under PMA
-09-01-2025 10:20:01
3
G.S.Enterprises   Under PMA
-09-01-2025 18:04:44
4
HARSH MATCHING   Under PMA
-05-01-2025 13:38:29
5
KETAN ENTERPRISES   Under PMA
-05-01-2025 12:12:48
6
MEHUL TRADERS   Under PMA
-04-01-2025 20:14:30
7
SHRIPAL PRINTERS   Under PMA
-09-01-2025 11:05:57

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1KETAN ENTERPRISES(MSE,MII)   Under PMA Winner ₹9,50,900Item Categories : Integrated Ducting Cooler Cooling Capacity upto 700 Sqft,Integrated Ducting Cooler Cooling Capacity
L2MEHUL TRADERS (MSE,MII)   Under PMA₹9,75,589Item Categories : Integrated Ducting Cooler Cooling Capacity upto 700 Sqft,Integrated Ducting Cooler Cooling Capacity
L3HARSH MATCHING (MSE,MII)   Under PMA₹9,79,020Item Categories : Integrated Ducting Cooler Cooling Capacity upto 700 Sqft,Integrated Ducting Cooler Cooling Capacity

🎉 L1 Winner

KETAN ENTERPRISES(MSE,MII)   Under PMA

Final Price: ₹9,50,900

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

FAQs
  1. What are the eligibility criteria for participating in this tender?
    For eligibility, bidders need a minimum of 3 years’ experience in related fields, a minimum average annual turnover of ₹5 lakh, and compliance with OEM turnover requirements. MSEs and startups have specific exemptions from experience and turnover criteria.
2. What documentation is required from bidders?

Bidders must provide experience criteria documentation, past performance certificates, bidder turnover information, OEM authorization certificates, and compliance documents with BoQ specifications.

3. How can a bidder avail exemption from EMD?

Bidders seeking exemption from EMD must submit valid documentation as per the GeM GTC. Only MSE manufacturers and service providers are eligible for EMD exemption.

4. What are the financial requirements for the bid?

The bidder must demonstrate a minimum average annual turnover of ₹5 lakh over the last three years and ensure that any OEM involved meets a turnover of ₹30 lakh in the same timeframe.

5. What are the technical specifications required for the integrated ducting coolers?

The specification includes various capacities such as up to 700 Sqft, 1200 Sqft, and 1600 Sqft, alongside duct fabrication, weather-proof canvas, and thermal insulation.

6. Can startups participate in this tender?

Yes, startups can participate and are exempted from the turnover and experience criteria provided they comply with quality specifications.

7. What is the evaluation process for the submitted bids?

Bids will undergo evaluation based on technical compliance, followed by financial assessment. A reverse auction may occur among the lowest-priced technically qualified bidders.

8. When is the deadline for bid submission?

The bids must be submitted by 09-01-2025, 21:00:00.

9. What happens if the bid does not meet local content requirements?

Bidders must ensure a minimum local content of 50% for Class 1 suppliers and 20% for Class 2 suppliers, as outlined in the tender specifications.

10. How long is the bid offer validity?

The validity period for the bid offer is 180 days from the bid closing date.

11. What are the expectant delivery days for items once the bid is awarded?

The delivery will be expected within 45 days post-award of the bid, as per the specifics outlined in the documentation.

12. Where can the bid documents be accessed?

All bid documents can be accessed through the provided links in the tender’s main document.

13. What should be done if there are questions during the technical evaluation phase?

Bidders are allowed 2 days for technical clarifications during the evaluation period.

14. How is performance security evaluated?

A performance security of 3% of the total contract value is required to ensure compliance with the terms upon bid acceptance.

15. What are the ramifications for non-compliance with the tender specifications?

Non-compliance with the specifications may lead to disqualification from the bidding process or voiding of the contract, should it be awarded.