TenderDekho Logo
Active GEM

Bids are Invited For Non Modular Piano Type Domestic Electrical Sockets ISI Marked To IS 1293,PVC Insulated Copper Cable in ETAH, UTTAR PRADESH

Bid Publish Date

18-Sep-2026, 5:40 pm

Bid End Date

17-Oct-2026, 4:00 pm

EMD

₹10

Value

₹11,84,145

Generate Docs

Progress

Issue18-Sep-2026, 5:40 pm
Corrigendum12-Oct-2026
AwardPending

A tender has been published for Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow Non Modular Piano Type Domestic Electrical Sockets ISI Marked To IS 1293, PVC Insulated Copper Cable Single Core and Multi Core Circular Sheathed with Flexible Conductor (V2) ISI Marked To IS 694, Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1), Self Ballasted LED Lamps (LED Bulb) Conforming to IS 16102 (Part 2) (V3), LED Batten Light (LED Tube Light) (V2), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II), 5A Switch in ETAH, UTTAR PRADESH. Quantity: 980 by. Submission Deadline: 17-10-2026 16: 00: 00. Check eligibility and apply.

Advertisement

Tender Data

Bid Details

Quantity

980

Category

Non Modular Piano Type Domestic Electrical Sockets ISI Marked To IS 1293

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

3

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Non Modular Piano Type Domestic Electrical Sockets ISI Marked To IS 1293 , PVC Insulated Copper Cable Single Core and Multi Core Circular Sheathed with Flexible Conductor (V2) ISI Marked To IS 694 , Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) , Self Ballasted LED Lamps (LED Bulb) Conforming to IS 16102 (Part 2) (V3) , LED Batten Light (LED Tube Light) (V2) , LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) , 5A Switch

Advisory Bank

PUNJAB NATIONAL BANK

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Etah

Delivery Pincodes

207001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Abhinav Pandya207001,Jawaharpur Thermal Power PlantEtahUttar Pradesh2070012545-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9905213.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow

Office Name

Lucknow

Grievance Contact

[email protected]

Corrigendum Updates

2 Updates
#1

Update

12-Oct-2026

Extended Deadline

17-Oct-2026, 10:30 am

Opening Date

18-Oct-2026, 10:30 am

#2

Update

07-Oct-2026

Extended Deadline

12-Oct-2026, 10:30 am

Opening Date

13-Oct-2026, 10:30 am

Categories 29

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Additional Doc 1 (Requested in ATC)

4

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement