Progress
RAPublic procurement opportunity for Indian Army Mat Flooring, Projector Screen, Wall Panelling, Putty and Painting, Signage, Electrical, False Ceiling, 2 ton AC in BANGALORE, KARNATAKA. Quantity: 2535 issued by. Submission Deadline: 25-06-2026 11: 00: 00. View full details and respond.
Start
23-Aug-2026, 3:00 pm
End
24-Aug-2026, 3:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
2535
Category
Putty and Painting
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
5
OEM Avg. Turnover
5
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Mat Flooring , Projector Screen , Wall Panelling , Putty and Painting , Signage , Electrical , False Ceiling , 2 ton AC
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Mat Flooring
Removing of existing floor carpet and laying of 12 mm thick fluffy Polypropylene carpet of approved color and sample
Projector Screen
Supply of 12 ft x 8 ft Projector Screen
Wall Panelling
Installation of WPC fluted wall panelling on the Projector screen wall of approved color and sample
Putty and Painting
Painting of the entire hall with 1 coat of putty 1 coat of primer and 2 coats of approved emulsion. Mechanised sanding of the walls. dimension 42 ft x 27 ft
Signage
Supply and installation of front lit acrylic lettes of Chief Instructor Workshop fixed on the gallery wall. Warm white light with less luminous
Electrical
Rewiring of the hall with concealed conduits, modular switches 18 W COB lights (6 Nos) 2 Way switches, LED profile lighting, AC wiring and all other electrical related works. Ceiling light remains same.
False Ceiling
Gypsum false ceiling of the stage area lowering the height and merging with the beam bottom
2 ton AC
Supply and installation of 2 Ton AC with gas filling, piping and outdoor stand. Includes core cutting. Samsung 2 Ton 3 Star AI Inverter Smart windfree Split AC. Copper Coil.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Mat Flooring | Removing of existing floor carpet and laying of 12 mm thick fluffy Polypropylene carpet of approved color and sample | 1,500 | sqft | ciw2meg_gem | 14 | |
| 2 | Projector Screen | Supply of 12 ft x 8 ft Projector Screen | 1 | sqft | ciw2meg_gem | 14 | |
| 3 | Wall Panelling | Installation of WPC fluted wall panelling on the Projector screen wall of approved color and sample | 644 | sqft | ciw2meg_gem | 14 | |
| 4 | Putty and Painting | Painting of the entire hall with 1 coat of putty 1 coat of primer and 2 coats of approved emulsion. Mechanised sanding of the walls. dimension 42 ft x 27 ft | 1 | job | ciw2meg_gem | 14 | |
| 5 | Signage | Supply and installation of front lit acrylic lettes of Chief Instructor Workshop fixed on the gallery wall. Warm white light with less luminous | 24 | letters | ciw2meg_gem | 14 | |
| 6 | Electrical | Rewiring of the hall with concealed conduits, modular switches 18 W COB lights (6 Nos) 2 Way switches, LED profile lighting, AC wiring and all other electrical related works. Ceiling light remains same. | 1 | job | ciw2meg_gem | 14 | |
| 7 | False Ceiling | Gypsum false ceiling of the stage area lowering the height and merging with the beam bottom | 360 | sqft | ciw2meg_gem | 14 | |
| 8 | 2 ton AC | Supply and installation of 2 Ton AC with gas filling, piping and outdoor stand. Includes core cutting. Samsung 2 Ton 3 Star AI Inverter Smart windfree Split AC. Copper Coil. | 4 | nos | ciw2meg_gem | 14 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer