TenderDekho Logo
Closed GEM

Government Tender Published for Complete Gear Box Model H1-200, Ratio 1.75 by 1, P1,Input Shaft,Pinion,Wheel,Input oil Seal,Output in KANPUR DEHAT, UTTAR PRADESH

Bid Publish Date

29-Mar-2025, 3:44 pm

Bid End Date

26-Apr-2025, 4:00 pm

Progress

Issue29-Mar-2025, 3:44 pm
Award01-Jul-2025, 1:45 am
Explore all 5 tabs to view complete tender details

Quantity

180

Categories 37

Neyveli Uttar Pradesh Power Limited invites bids for Complete Gear Box Model H1-200, Ratio 1. 75 by 1, P1, Input Shaft, Pinion, Wheel, Input oil Seal, Output Oil Seal, Complete Gear Box Model H2-160, Ratio 15. 4 by 1, P1, Input Pinion Shaft, 1st Stage Wheel, Final Pinion Shaft, Output Wheel, Input Oil Seal, Complete Fluid Coupling WDFC-410, Impeller, Runner, Casing, Shaft, Fusible Plug, Washer for Fusible Plug, Multi Disc Unit, MDU Bolt, Spherical Collar, MDU NUT, Flexible Coupling, filing plug, Runner Half Coupling, Outer half Coupling, OIL Seal for Casing, Oil Seal for Chamber, Complete Fluid Coupling PST-530, Impller, Output Shaft, Output Connecting Coupling, Input Connecting Coupling, Motorized Oil Circulation Pump, Oil Seal, Breather, Hose Pipe Set 1 Set Consist 2 Numbers, SCOOP TUBE COMPLETE CCW 530 PST, SCOOP TUBE COMPLETE CW 530 PST, Suction strainer, Y TYPE FILTER, FILLING or DRAIN PLUG, OIL LEVEL WINDOW in KANPUR DEHAT, UTTAR PRADESH. Quantity: 180. Submission Deadline: 26-04-2025 16: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

Complete Gear Box Model H1-200, Ratio 1.75 by 1, P1 , Input Shaft , Pinion , Wheel , Input oil Seal , Output Oil Seal , Complete Gear Box Model H2-160, Ratio 15.4 by 1, P1 , Input Pinion Shaft , 1st Stage Wheel , Final Pinion Shaft , Output Wheel , Input Oil Seal , Complete Fluid Coupling WDFC-410 , Impeller , Runner , Casing , Shaft , Fusible Plug , Washer for Fusible Plug , Multi Disc Unit , MDU Bolt , Spherical Collar , MDU NUT , Flexible Coupling , filing plug , Runner Half Coupling , Outer half Coupling , OIL Seal for Casing , Oil Seal for Chamber , Complete Fluid Coupling PST-530 , Impller , Output Shaft , Output Connecting Coupling , Input Connecting Coupling , Motorized Oil Circulation Pump , Oil Seal , Breather , Hose Pipe Set 1 Set Consist 2 Numbers , SCOOP TUBE COMPLETE CCW 530 PST , SCOOP TUBE COMPLETE CW 530 PST , Suction strainer , Y TYPE FILTER , FILLING or DRAIN PLUG , OIL LEVEL WINDOW

Authority Records

MINISTRY OF COAL

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7527130.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 48 Items Sign in for GEM prices

#1

Complete Gear Box Model H1-200, Ratio 1.75 by 1, P1

As per Technical Specification sheet

1 nos Delivery: 120 days
#2

Input Shaft

As per Technical Specification sheet

1 nos Delivery: 120 days
#3

Pinion

As per Technical Specification sheet

1 nos Delivery: 120 days
#4

Wheel

As per Technical Specification sheet

1 nos Delivery: 120 days
#5

Input oil Seal

As per Technical Specification sheet

4 nos Delivery: 120 days
#6

Output Oil Seal

As per Technical Specification sheet

4 nos Delivery: 120 days
#7

Complete Gear Box Model H2-160, Ratio 15.4 by 1, P1

As per Technical Specification sheet

1 nos Delivery: 120 days
#8

Input Pinion Shaft

As per Technical Specification sheet

2 nos Delivery: 120 days
#9

1st Stage Wheel

As per Technical Specification sheet

2 nos Delivery: 120 days
#10

Final Pinion Shaft

As per Technical Specification sheet

2 nos Delivery: 120 days
#11

Output Wheel

As per Technical Specification sheet

2 nos Delivery: 120 days
#12

Input Oil Seal

As per Technical Specification sheet

12 nos Delivery: 120 days
#13

Output Oil Seal

As per Technical Specification sheet

12 nos Delivery: 120 days
#14

Complete Fluid Coupling WDFC-410

As per Technical Specification sheet

1 nos Delivery: 120 days
#15

Impeller

As per Technical Specification sheet

1 nos Delivery: 120 days
#16

Runner

As per Technical Specification sheet

1 nos Delivery: 120 days
#17

Casing

As per Technical Specification sheet

1 nos Delivery: 120 days
#18

Shaft

As per Technical Specification sheet

1 nos Delivery: 120 days
#19

Fusible Plug

As per Technical Specification sheet

12 nos Delivery: 120 days
#20

Washer for Fusible Plug

As per Technical Specification sheet

12 nos Delivery: 120 days
#21

Multi Disc Unit

As per Technical Specification sheet

6 nos Delivery: 120 days
#22

MDU Bolt

As per Technical Specification sheet

12 nos Delivery: 120 days
#23

Spherical Collar

As per Technical Specification sheet

12 nos Delivery: 120 days
#24

MDU NUT

As per Technical Specification sheet

12 nos Delivery: 120 days
#25

Flexible Coupling

As per Technical Specification sheet

2 nos Delivery: 120 days
#26

filing plug

As per Technical Specification sheet

6 nos Delivery: 120 days
#27

Runner Half Coupling

As per Technical Specification sheet

1 nos Delivery: 120 days
#28

Outer half Coupling

As per Technical Specification sheet

1 nos Delivery: 120 days
#29

OIL Seal for Casing

As per Technical Specification sheet

6 nos Delivery: 120 days
#30

Oil Seal for Chamber

As per Technical Specification sheet

6 nos Delivery: 120 days
#31

Complete Fluid Coupling PST-530

As per Technical Specification sheet

1 nos Delivery: 120 days
#32

Impller

As per Technical Specification sheet

1 nos Delivery: 120 days
#33

Runner

As per Technical Specification sheet

1 nos Delivery: 120 days
#34

Input Shaft

As per Technical Specification sheet

1 nos Delivery: 120 days
#35

Fusible Plug

As per Technical Specification sheet

8 nos Delivery: 120 days
#36

Output Shaft

As per Technical Specification sheet

1 nos Delivery: 120 days
#37

Output Connecting Coupling

As per Technical Specification sheet

1 nos Delivery: 120 days
#38

Input Connecting Coupling

As per Technical Specification sheet

1 nos Delivery: 120 days
#39

Motorized Oil Circulation Pump

As per Technical Specification sheet

1 nos Delivery: 120 days
#40

Oil Seal

As per Technical Specification sheet

8 nos Delivery: 120 days
#41

Breather

As per Technical Specification sheet

2 nos Delivery: 120 days
#42

Hose Pipe Set 1 Set Consist 2 Numbers

As per Technical Specification sheet

2 nos Delivery: 120 days
#43

SCOOP TUBE COMPLETE CCW 530 PST

As per Technical Specification sheet

1 nos Delivery: 120 days
#44

SCOOP TUBE COMPLETE CW 530 PST

As per Technical Specification sheet

1 nos Delivery: 120 days
#45

Suction strainer

As per Technical Specification sheet

2 nos Delivery: 120 days
#46

Y TYPE FILTER

As per Technical Specification sheet

2 nos Delivery: 120 days
#47

FILLING or DRAIN PLUG

As per Technical Specification sheet

4 nos Delivery: 120 days
#48

OIL LEVEL WINDOW

As per Technical Specification sheet

4 nos Delivery: 120 days

Financial Results

Rank Seller Price Item
L1
M/S ASSOCIATE ENGINEERS   Under PMA
Item Categories : Complete Gear Box Model H1-200, Ratio 1.75 by 1, P1,Input Shaft,Pinion,Wheel,Input oil Seal,Output

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What are the eligibility requirements for participation in this tender?

The eligibility requirements include being a registered entity within the relevant sector, possessing valid licenses, and demonstrating experience in supplying similar machinery parts. Compliance with all regulatory standards and a reputation for reliability in service delivery are crucial factors as well.

What technical specifications are required for the parts to be supplied?

All parts must meet specified technical specifications, including compatibility with existing machinery, adherence to safety and quality standards, and provision of OEM certifications. Bidders must also detail the functionalities of each component to ensure they meet operational needs.

What are the financial requirements for submitting a proposal?

Bidders must detail their financial proposals, which should include the total cost of items, applicable taxes, and any additional charges related to delivery. Clear itemization of costs will assist in the evaluation process and ensure transparency throughout procurement.

How should submissions be prepared and what formats are accepted?

Submissions must be prepared in a single envelope format containing both technical and financial documents. Accepted document formats include PDF and Word files, provided they are complete and duly signed by an authorized representative of the bidding entity.

What are the provisions for Micro, Small, and Medium Enterprises in this tender?

MSEs can benefit from relaxed eligibility criteria, preferential consideration in evaluation, and provisions allowing easier compliance with bidding processes. These provisions aim to promote inclusivity and encourage participation from innovative smaller suppliers in line with national policies.