Progress
RAQuantity
170
Category
Workstation including installation & electrical wiring connection with socket packet
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for a workstation furniture and accessory package comprising a workstation setup including installation and electrical wiring with socket, a Mid Back office chair black, Monitor Desk Mount, LED Back light boards 3x2 ft with fitting, and ACP quotation board 4x2 ft. The estimated EMD is ₹41,970. Although exact location details are sparse, this procurement falls under tender in India for army office infrastructure upgrades. A key differentiator is the integrated delivery of installation and electrical connections across multiple items, enabling a ready-to-use workstation environment.
Workstation setup with installation and electrical wiring connections
Mid Back office chair (color: black)
Monitor Desk Mount
LED Back light boards 3x2 ft with fittings
ACP quotation board 4x2 ft
EMD of ₹41,970 required to participate
Quantity variation up to ±25% during contract
Delivery timeline calculated from last original delivery order date with minimum 30 days
Installation and electrical wiring are included within the scope
No explicit BOQ or detailed technical standards provided
Not explicitly stated in available data; bidders must confirm terms at bid submission
Delivery period commences from the last date of original delivery order; option quantity affects extension time using formula with a 30-day minimum
Not specified in the provided terms; bidders should seek clarity during bid clarifications
Submit ₹41,970 EMD as specified
Demonstrate capacity for integrated installation and electrical wiring work
Provide GST, PAN, and any relevant OEM authorizations or dealer certificates
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Workstation including installation & electrical wiring connection with socket packet , Mid Back office chair black , Monitor Desk Mount , LED Back light boards 3x2 ft with fitting , ACP quotation board 4x2 ft
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
EMD submission proof for ₹41,970
Experience certificates for similar office furniture/installation work (if requested)
Technical bid documents demonstrating compliance with installed electrical wiring and mounting hardware
OEM authorizations or dealership certificates for chairs, monitor mounts, LED boards, ACP boards (if required)
Start
14-Dec-2025, 12:00 pm
End
15-Dec-2025, 12:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | DEVANSH VISION Under PMA | Make : Nilkamal Model : LINEAR WORKSTATION Title : Workstation including installation & electrical wiring connection with socket packet | 18-11-2025 09:58:59 | |
| 2 | M/S MANISH ENGINEERING GROUP Under PMA | Make : Unbrand Model : Workstation including installation & electrical Title : Workstation including installation & electrical wiring connection with socket packet | 18-11-2025 11:50:03 | |
| 3 | MAHINDRA GLOBAL Under PMA | Make : Nilkamal Model : MG Title : Workstation including installation & electrical wiring connection with socket packet | 18-11-2025 00:48:56 | |
| 4 | PURPLE OFFICE SYSTEMS Under PMA | Make : Purple Office Systems Model : PURPLE CUSTOM FURNITURE Title : Workstation including installation & electrical wiring connection with socket packet | 17-11-2025 20:01:00 | |
| 5 | Sunjog Enterprises Under PMA | Make : Unbrand Model : Workstation including installation & electrical Title : Workstation including installation & electrical wiring connection with socket packet | 18-11-2025 11:59:14 |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | DEVANSH VISION(MSE,MII) Under PMA Winner | ₹13,39,800 | Item Categories : Workstation including installation & electrical wiring connection with socket packet,Mid Back offic |
| L2 | MAHINDRA GLOBAL (MSE,MII) Under PMA | ₹13,43,600 | Item Categories : Workstation including installation & electrical wiring connection with socket packet,Mid Back offic |
🎉 L1 Winner
DEVANSH VISION(MSE,MII) Under PMA
Final Price: ₹13,39,800
Key insights about BIHAR tender market
Bidders should prepare EMD of ₹41,970, GST and PAN documents, OEM authorizations if required, and technical bids demonstrating installation capabilities. Ensure submission of all required documents, and confirm endorsement of the delivery extension rules with a clear plan for bundled installation and wiring work.
Required documents include GST registration, PAN card, EMD receipt for ₹41,970, and any experience certificates for similar installation projects. Also include technical bid documents, OEM authorizations if applicable, and proof of ability to perform electrical wiring and monitor mounting work.
Delivery starts from the last date of the original delivery order, with a minimum 30-day extension under the option clause. Quantity may vary by up to ±25% during contract, at contracted rates, affecting delivery timelines accordingly.
No explicit standards are stated in the tender data. Bidders should verify whether ISI, ISO, or national standards apply during bid submission and seek clarifications if required for chair, monitor mount, LED boards, and ACP boards.
Items include workstation installation with wiring, a black mid-back office chair, a monitor desk mount, LED back light boards 3x2 ft with fittings, and an ACP quotation board 4x2 ft. EMD amount and bundled installation scope are highlighted in the procurement terms.
Specific bid submission deadlines are not provided in the data. Prospective bidders should monitor official notices and prepare EMD, GST, PAN, and technical bid materials in advance for timely submission.
Payment terms are not detailed in the available information. Bidders must obtain clarification during bid clarification and ensure readiness to comply with standard government settlement timelines once defined.
Prepare a detailed installation plan including wiring diagrams, safety standards, and on-site execution methodology. Include credentialed technicians, test procedures for electrical connections, and a warranty/AMC plan relevant to the workstation components.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS