Repair of Brush Cutter,Repair of BKR Petrol Engine Hedge Trimmer Cutter,Repair of Kisan Kraft Hand
Indian Army
ALWAR, RAJASTHAN
Progress
Quantity
158
Category
Repair of Heat Pillar
Bid Type
Two Packet Bid
The Indian Air Force invites bids for repair services across six items including Heat Pillar, Oil-Filled Radiator, Brush Cutter, Heat Blower, Refrigerator, and Hot/Cold Water Dispenser. The contract contemplates quantity variances up to 25% with rates held, and delivery periods tied to original timelines. Mandatory pre-bid meeting ensures alignment on item specifications, and Bidders must provide MII compliance and MSME categorization. GST documentation (GST certificate, GST challan for 3 months, GST 3B for last year) is required, along with an affidavit confirming non-blacklisting. This procurement targets capable service providers for in-country maintenance of critical equipment.
Repair scope for six items: Heat Pillar, Oil-Filled Radiator, Brush Cutter, Heat Blower, Refrigerator, Hot/Cold Water Dispenser
Delivery/extension: 25% quantity variance; minimum 30 days additional time
EMD/security: not specified in data; ensure compliance with EMD terms (implicit in bid process)
Standards/certifications: MII compliance and MSME category required
Documentation: GST certificate with 3B and challan; affidavit of non-blacklisting
Pre-bid meeting to clarify exact repairable item specifications
Option clause allows ±25% quantity change at contract rates
Mandatory GST documents and MSME/MII eligibility
Pre-bid meeting required for precise repair specifications
Affidavit confirming non-blacklisting; date post-bid publication
Delivery timelines extendable with minimum 30 days
Not explicitly stated; adhere to standard government procurement payment terms post-delivery as per contract
Delivery period commences from last date of original delivery order; additional time calculated by (increased quantity / original quantity) × original delivery period, minimum 30 days
Not specified in data; standard L.D. provisions may apply per government policy
MSME category in relevant repair/service domain
MII compliance certificate
GST registration with valid filings (3B, challans)
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
ALWAR, RAJASTHAN
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Navy
KANCHIPURAM, TAMIL NADU
Indian Army
GURDASPUR, PUNJAB
Indian Army
AMRITSAR, PUNJAB
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Repair of Heat Pillar | Repair of Heat Pillar | 102 | ea | icocg | 90 |
| 2 | Repair of Oil Filled Radiator | Repair of Oil Filled Radiator | 3 | ea | icocg | 90 |
| 3 | Repair of Brush cutter machine | Repair of Brush cutter machine | 27 | ea | icocg | 90 |
| 4 | Repair of Heat Blower | Repair of Heat Blower | 11 | ea | icocg | 90 |
| 5 | Repair of Refrigerator | Repair of Refrigerator | 1 | ea | icocg | 90 |
| 6 | Repair of Hot Cold Water Dispenser | Repair of Hot Cold Water Dispenser | 14 | ea | icocg | 90 |
Discover companies most likely to bid on this tender
GST certificate
GST challan (last 3 months)
GST 3B return (last 1 year)
MII compliance certificate
MSME category certificate (relevant category)
Affidavit of not being blacklisted (non-judicial stamp paper)
Pre-bid meeting attendance certificate (if issued)
Any OEM authorization or repair capability certificates (if applicable)
Extended Deadline
02-Feb-2026, 9:00 am
Opening Date
02-Feb-2026, 9:30 am
Extended Deadline
29-Jan-2026, 9:00 am
Opening Date
29-Jan-2026, 9:30 am
Key insights about PUNJAB tender market
Bidders should confirm MSME/MII eligibility, submit GST documentation (GST certificate, 3B, challans), provide non-blacklist affidavit, and attend the mandatory pre-bid meeting. Ensure capability to repair Heat Pillar, Oil-Filled Radiator, Brush Cutter, Heat Blower, Refrigerator, and Hot/Cold Water Dispenser per procurement terms.
Submit GST certificate, last year GST 3B, last 3 months GST challans, MII compliance certificate, MSME category proof, non-blacklist affidavit, and any OEM authorization for repair capabilities. Include pre-bid meeting attendance if applicable.
The purchaser may increase or decrease the bid quantity up to 25% at contracted rates. If extended delivery, additional time is calculated as (increased quantity / original quantity) × original delivery period, with a minimum of 30 days.
Delivery periods start from the last date of the original delivery order. If quantity changes, the extended time follows the option clause formula, ensuring minimum 30 days beyond original schedule; proper coordination with IAF procurement is required.
Bidders must provide MII compliance certificate and belong to MSME in the relevant category. GST compliance is mandatory, with GST challans and 3B filings up to the last year, and an affidavit confirming non-blacklisting.
Eligible bidders must hold MSME status in the relevant category, possess MII compliance, and be GST compliant with timely filings. Pre-bid meeting participation is mandatory to interpret exact repairable item specifications and bidding format.
Prepare on non-judicial stamp paper with bid reference, stating the firm is not blacklisted by any ministry or govt department. Include issuance date post-publication and sign with authorized signatory as part of bid submission.
Pre-bid meeting is mandatory to understand exact repair item specifications. Attendance details are provided by the procurement office; ensure participation to clarify scope for Heat Pillar, Oil-Filled Radiator, Brush Cutter, and other devices.
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS