TenderDekho Logo
Active GEM

Tender Notice for Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireles in CENTRAL DELHI, DELHI

Bid Publish Date

25-Sep-2026, 11:14 am

Bid End Date

16-Oct-2026, 2:00 pm

EMD

₹82,588

Progress

Issue25-Sep-2026, 11:14 am
AwardPending

Rail Land Development Authority has released a public tender for Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Controller, Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Access Point, Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of User Authentication Device, Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Room Wireless Access Point, Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Network Switches in CENTRAL DELHI, DELHI. Quantity: 29. Submission Deadline: 16-10-2026 14: 00: 00. Download documents and apply online.

Advertisement

Tender Data

Bid Details

Quantity

29

Category

Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Access Point

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

20

OEM Avg. Turnover

160

Past Performance

50 %

Warranty Period

3 days

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Controller , Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Access Point , Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of User Authentication Device , Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Room Wireless Access Point , Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Network Switches

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

39

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Central

Delivery Pincodes

110002

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
RAJEEV KUMAR110002,Rail Land Development Authority, Ministry of Railways Government of India, Unit No. 702-B, 7th Floor, Konnectus Tower-2, DMRC Building, Ajmeri GateCentralDelhi1100021120-

Authority Records

MINISTRY OF RAILWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9943955.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

Railways Autonomous

Office Name

Rail Land Development Authority

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Controller

Enterprise Wireless Access Controller

1 pieces Delivery: 120 days
#2

Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Access Point

Wi-Fi 7 tri-band concurrent wireless access points

20 pieces Delivery: 120 days
#3

Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of User Authentication Device

User Authentication Device/Captive Portal Gateway

1 pieces Delivery: 120 days
#4

Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Room Wireless Access Point

Wi-Fi 6 Dual-band 802.11ax

5 pieces Delivery: 120 days
#5

Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Network Switches

Switches with 24x100/1000/2500 Mbps PoE++ ports

2 pieces Delivery: 120 days

Categories 16

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement