Bid Publish Date
25-Sep-2026, 11:14 am
Bid End Date
16-Oct-2026, 2:00 pm
EMD
₹82,588
Location
Progress
Rail Land Development Authority has released a public tender for Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Controller, Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Access Point, Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of User Authentication Device, Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Room Wireless Access Point, Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Network Switches in CENTRAL DELHI, DELHI. Quantity: 29. Submission Deadline: 16-10-2026 14: 00: 00. Download documents and apply online.
Quantity
29
Category
Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Access Point
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
20
OEM Avg. Turnover
160
Past Performance
50 %
Warranty Period
3 days
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Controller , Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Access Point , Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of User Authentication Device , Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Room Wireless Access Point , Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Network Switches
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
39
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Central
Delivery Pincodes
110002
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| RAJEEV KUMAR | 110002,Rail Land Development Authority, Ministry of Railways Government of India, Unit No. 702-B, 7th Floor, Konnectus Tower-2, DMRC Building, Ajmeri Gate | Central | Delhi | 110002 | 1 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Controller
Enterprise Wireless Access Controller
Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Access Point
Wi-Fi 7 tri-band concurrent wireless access points
Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of User Authentication Device
User Authentication Device/Captive Portal Gateway
Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Room Wireless Access Point
Wi-Fi 6 Dual-band 802.11ax
Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Network Switches
Switches with 24x100/1000/2500 Mbps PoE++ ports
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Controller | Enterprise Wireless Access Controller | 1 | pieces | amit@rlda | 120 | |
| 2 | Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Wireless Access Point | Wi-Fi 7 tri-band concurrent wireless access points | 20 | pieces | amit@rlda | 120 | |
| 3 | Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of User Authentication Device | User Authentication Device/Captive Portal Gateway | 1 | pieces | amit@rlda | 120 | |
| 4 | Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Room Wireless Access Point | Wi-Fi 6 Dual-band 802.11ax | 5 | pieces | amit@rlda | 120 | |
| 5 | Supply, Installation, Configuration, Implementation, Testing, Commissioning and Training of Network Switches | Switches with 24x100/1000/2500 Mbps PoE++ ports | 2 | pieces | amit@rlda | 120 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer