Bid Publish Date
26-Sep-2026, 8:37 pm
Bid End Date
07-Oct-2026, 10:00 am
Location
Progress
RAThe Indian Army, Department Of Military Affairs, seeks supply of a broad range of mechanical spare parts, including Oil Control Piston Ring, Solenoid Valve, Roller Bearing, Gear Couplings, Shut up Knob, Track Chain Bush, Boom Jack Pipe, Hydraulic Hose, Foam Strip, Fender components, Master Pin, Inertia Break, Nut/Bolt sets, Element Air Main, Shim, and Air/Fuel filters. The procurement location is NORTH 24 PARGANAS, WEST BENGAL (700057). The BOQ lists 20 items, but explicit quantities and total estimated value are not disclosed. Key differentiators include ISO 9001 certification requirement for bidders or OEMs and dedicated service/support channels. The buyer reserves options to adjust quantity up to 25% and modify delivery timelines accordingly. This tender emphasizes compliance and post-award support as a decisive factor.
Oil Control Piston Ring
Solenoid Valve
Roller Bearing
Gear Couplings
Shut up Knob
Track Chain Bush
Boom Jack Pipe
Front Blade Hydraulic Hose
Foam Strip LH
Fender Rear LH/RH
Master Pin
Inertia Break
Nuts/Bolts M-10x90 mm
Air Main Element, Shim 1.4 mm
Air Filter Element, Pre Filter Fuel, Float
Option clause allowing up to 25% quantity increase during contract
ISO 9001 certification mandatory for bid or OEM
Dedicated service/support channels and escalation matrix required
Turnover proof required for last 3 years; CA/audited statements accepted
Submission of PAN, GSTIN, cancelled cheque, EFT mandate
Total payment terms not explicitly stated; standard procurement practice requires submission of bank EFT mandate and GST compliance; no advance mentioned
Delivery period may be extended with option to increase quantity by up to 25%; extension formula provided in terms
No specific LD percentage provided in data; standard supply contract penalties implied by delivery delays
Not under liquidation, court receivership, or bankruptcy
ISO 9001 certification either bidder or OEM
Last 3 years average turnover as per bid document
Submission of PAN, GSTIN, EFT mandate and financial statements
Start
15-Oct-2026, 8:00 pm
End
16-Oct-2026, 8:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
184
Category
Oil Control Piston Ring
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
50 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Oil Control Piston Ring , Solenoid Valve , Roller Bearing , Gear Couplings , Shut up Knob , Track Chain Bush , Boom Jack Pipe , Front Blade Hydraulic Hose , Foam Strip LH , Fender Rear LH , Fender Rear RH , Master Pin , Inertia Break , Nut Lock M-10 , Bolt M-10x90 mm , Element Air Main , Shim 1.4 mm , Air Filter Element , Pre Filter Fuel , Float
Pre-Bid Date
29-09-2026 09:00:00
Pre-Bid Venue
Engineer Regiment, Near KV No-1, Kanchrapara military station , 24 north parganas, west bengal-743193
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
North parganas
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | North 24 parganas | North parganas | - | - | 5 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Oil Control Piston Ring
Oil Control Piston Ring
Solenoid Valve
Solenoid Valve
Roller Bearing
Roller Bearing
Gear Couplings
Gear Couplings
Shut up Knob
Shut up Knob
Track Chain Bush
Track Chain Bush
Boom Jack Pipe
Boom Jack Pipe
Front Blade Hydraulic Hose
Front Blade Hydraulic Hose
Foam Strip LH
Foam Strip LH
Fender Rear LH
Fender Rear LH
Fender Rear RH
Fender Rear RH
Master Pin
Master Pin
Inertia Break
Inertia Break
Nut Lock M-10
Nut Lock M-10
Bolt M-10x90 mm
Bolt M-10x90 mm
Element Air Main
Element Air Main
Shim 1.4 mm
Shim 1.4 mm
Air Filter Element
Air Filter Element
Pre Filter Fuel
Pre Filter Fuel
Float
Float
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Oil Control Piston Ring | Oil Control Piston Ring | 5 | pieces | qm236engr | 15 | |
| 2 | Solenoid Valve | Solenoid Valve | 3 | pieces | qm236engr | 15 | |
| 3 | Roller Bearing | Roller Bearing | 12 | pieces | qm236engr | 15 | |
| 4 | Gear Couplings | Gear Couplings | 6 | pieces | qm236engr | 15 | |
| 5 | Shut up Knob | Shut up Knob | 20 | pieces | qm236engr | 15 | |
| 6 | Track Chain Bush | Track Chain Bush | 20 | pieces | qm236engr | 15 | |
| 7 | Boom Jack Pipe | Boom Jack Pipe | 8 | pieces | qm236engr | 15 | |
| 8 | Front Blade Hydraulic Hose | Front Blade Hydraulic Hose | 6 | pieces | qm236engr | 15 | |
| 9 | Foam Strip LH | Foam Strip LH | 6 | pieces | qm236engr | 15 | |
| 10 | Fender Rear LH | Fender Rear LH | 4 | pieces | qm236engr | 15 | |
| 11 | Fender Rear RH | Fender Rear RH | 4 | pieces | qm236engr | 15 | |
| 12 | Master Pin | Master Pin | 10 | pieces | qm236engr | 15 | |
| 13 | Inertia Break | Inertia Break | 10 | pieces | qm236engr | 15 | |
| 14 | Nut Lock M-10 | Nut Lock M-10 | 15 | pieces | qm236engr | 15 | |
| 15 | Bolt M-10x90 mm | Bolt M-10x90 mm | 15 | pieces | qm236engr | 15 | |
| 16 | Element Air Main | Element Air Main | 5 | pieces | qm236engr | 15 | |
| 17 | Shim 1.4 mm | Shim 1.4 mm | 20 | pieces | qm236engr | 15 | |
| 18 | Air Filter Element | Air Filter Element | 6 | pieces | qm236engr | 15 | |
| 19 | Pre Filter Fuel | Pre Filter Fuel | 5 | pieces | qm236engr | 15 | |
| 20 | Float | Float | 4 | pieces | qm236engr | 15 |
PAN Card
GSTIN
Cancelled Cheque
EFT Mandate certified by bank
Audited Balance Sheets or CA/Cost Accountant turnover certificate for last 3 years
ISO 9001 certification ( bidder or OEM )
Vendor Code creation documents as per T&C
Any OEM authorization documents if bidding as channel partner
Key insights about WEST BENGAL tender market
To bid, ensure ISO 9001 certification (bidder or OEM), prepare PAN, GSTIN, cancelled cheque, EFT mandate, and three-year turnover documents. Submit audited statements or CA certificate and comply with the 25% quantity extension rule. Confirm service support details and escalation matrix with bid submission.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, audited turnover statements for last three years, ISO 9001 certificate, OEM authorizations if applicable, and vendor code creation documents. Ensure all are certified and uploaded with the bid as per T&Cs.
Bidders must supply ISO 9001 certified products or from an OEM with ISO 9001; no ISI or BIS specific marks mentioned. Ensure parts compatibility with listed components and standard service support mechanism, including a toll-free number and escalation matrix.
Delivery time adjusts using formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. If original is under 30 days, extended period equals the original delivery period.
Submit PAN, GSTIN, cancelled cheque, and EFT mandate. Ensure turnover proof (audited or CA certificate) is provided to support eligibility and financial stability for vendor code assignment.
BOQ lists 20 items including Oil Control Piston Ring, Solenoid Valve, Roller Bearing, Gear Couplings, and related mechanical parts. Specific quantities are not disclosed; bidders should anticipate a broad mechanical spare-parts scope for military assets.
Bidders must provide a dedicated toll-free service line and an escalation matrix for technical support. This ensures prompt assistance post-sale and aligns with Army procurement expectations for maintenance and spare parts supply.
Minimum average annual turnover for the last three years must be demonstrated per the bid document, using audited balances or CA/Cost Accountant certificates. This confirms financial capability to sustain supply commitments and after-sales support.