TenderDekho Logo
Closed GEM

Invitation to Bid - POWER PACK DUAL,AC-DC Adaptor 48V 2A,AC-DC Adaptor 5V 1A,DWC HDPE Pipe 75-61 mm,DWC Coupler in Rangareddi, TELANGANA

Bid Publish Date

01-Oct-2026, 5:50 pm

Bid End Date

22-Oct-2026, 3:00 pm

EMD

₹53,800

Value

₹31,77,233

Generate Docs

Progress

Issue01-Oct-2026, 5:50 pm
Corrigendum15-Oct-2026
AwardPending

Public procurement opportunity for Bharat Sanchar Nigam Limited Portal(bsnl) POWER PACK DUAL, AC-DC Adaptor 48V 2A, AC-DC Adaptor 5V 1A, DWC HDPE Pipe 75-61 mm, DWC Coupler in Rangareddi, TELANGANA. Quantity: 24195 issued by. Submission Deadline: 22-10-2026 15: 00: 00. View full details and respond.

Advertisement

Authority & Contact

Office Name

O/o Cgmt, Telangana Telecom Circle

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

24195

Category

DWC HDPE Pipe 75-61 mm

Bid Type

Two Packet Bid

Bid Validity

150 (Days)

Bid Type

Service

Evaluation

Group wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

10

OEM Avg. Turnover

100

Past Performance

30 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

POWER PACK DUAL , AC-DC Adaptor 48V 2A , AC-DC Adaptor 5V 1A , DWC HDPE Pipe 75-61 mm , DWC Coupler

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

18

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Medchal Malkajgiri

Delivery Pincodes

500010

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Parvatham Venkateswarlu500010,BSNL Tel. Exchg., Behind CSI Holy Trinity Church, Bolarum, SecunderabadMedchal MalkajgiriTelangana5000101545-

Authority Records

MINISTRY OF COMMUNICATIONSTELECOMMUNICATIONS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9975833.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

POWER PACK DUAL

48V DC 19inch rack mountable SMPS power plant with 3 Nos. of 48V-10A rectifiers and with dual AC input option and automatic transfer between input sources using relay

15 nos Delivery: 45 days
#2

AC-DC Adaptor 48V 2A

AC Input 100-240V,50 Hz DC Output 48V, 2 Amp, Cable Length 2 meters with Output connector GX12-3 (female)

200 nos Delivery: 45 days
#3

AC-DC Adaptor 5V 1A

AC Input 100-240V,50 Hz DC Output 5V 1A

180 nos Delivery: 45 days
#4

DWC HDPE Pipe 75-61 mm

As per TEC Standard No. TEC 72020 2025

22,000 meter Delivery: 45 days
#5

DWC Coupler

As per TEC Standard No. TEC 72020 2025

1,800 nos Delivery: 45 days
Advertisement

Categories 15

Corrigendum Updates

2 Updates
#1

Update

15-Oct-2026

Extended Deadline

22-Oct-2026, 9:30 am

Opening Date

23-Oct-2026, 9:30 am

#2

Update

05-Oct-2026

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement