TenderDekho Logo
Closed GEM

Contract Bidding Open For Disconnecting of fittings,Degassing of bullets,Providing MS tubular ladder and scaffolding,Providin in ALLAHABAD, UTTAR PRADESH

Bid Publish Date

01-Jun-2026, 4:59 pm

Bid End Date

22-Jun-2026, 5:00 pm

Progress

Issue01-Jun-2026, 4:59 pm
AwardPending
Explore all 3 tabs to view complete tender details

Quantity

72

Categories 119

BP INSTRUMENT ULTRASONIC EXAMINATION AD FILM ELECTRICAL PLATFORM SCALE DECIBEL METER THICKNESS MEASURING DEVICES DIAGNOSTIC TOOL SPOTTING SCOPE ULTRASONIC TESTING SYSTEM PARAMETER TEST TESTING INSTRUMENT TUBE AND FITTING ULTRASONIC THICK GAUGE AIR COOLED ENGINE WHEAT FLOUR OFFSET PRINTING THICKNESS METER RADIO FREQUENCY ANALYSER HARDWARE AND FASTENERS DISTEMPER LPG ELECTRICAL WIRE TEXTURE ANALYZER ULTRASONIC DETECTOR SEALS ULTRASONIC THICKNESS TESTING WATTMETERS SOIL EARTH SNG MAGNET VALVE AMC OF ELECTRONIC ARTICULATING LAZY ARMS CENTRIFUGE BUCKETS PRESSURE VESSEL RAISING OF GROUND BRUSHES MUSICAL INSTRUMENT PARTS AND ACCESSORIES THICKNESS GAUGE DIAMONDS STORAGE VESSEL ULTRASONIC EQUIPMENT RUBBER AND ELASTOMERS DIAPHRAGM VALVES NDT GOLD MEDAL MAINTENANCE CONTRACT OF ELECTRONIC NOZZLE FURNITURE ITEMS SCAFFOLDING TABLES RADIOGRAPHIC EXAMINATION AIR EXHAUSTER PNEUMATIC POSITIONER BLASTING MACHINE AUDIOMETERS ALKANES VOLTMETER VESSEL FITMENT EARTH AND STONE GLUCOMETER TEXTURE ANALYSER BARE METAL PNEUMATIC VALVES BOLTS PRESSURE GAUGE VALVES WASHERS WEIGH BRIDGE THERMOWELLS WATER SUPPLY PROJECT SPORT VEHICLE NUTS DRAINAGE ENGINEERING TESTING SERVICES BUFFS POSITIVE MATERIAL VALVE WATER LEVEL RECORDER SANITARY FITTING WATER SUPPLY MATERIAL WIRE PINCH VALVES BODYWEIGHT MEASURING SCALE MICROWAVE SWITCH ROUTINE MAINTENANCE SMART POSITIONER FILLING RAIN CUT SLIDER VALVES MAGNETIC LIGHTING BACKHOE BOILER MOUNTING VALVE PYROMETERS FIRE BREATHING APPARATUS STEEL WATER TANK COMPRESSED SHEET GAUGE LIFT IRRIGATION NDT INSPECTION VALVE PARTS AND ACCESSORIES EXCAVATION SOLID ROCKET MOTORS ESCRAP METEOROLOGICAL INSTRUMENTS GASKETS BUNDI MEDICAL GAS BOILER VALVE UPVC PIPE FAN METAL PRODUCTS EARTH MOVING ULTRASONIC MEDICAL DIAGNOSTIC GAMMA CAMERAS WEIGHTS LOAD TESTING GLOBE VALVES

The issuing authority has released a public tender for Disconnecting of fittings, Degassing of bullets, Providing MS tubular ladder and scaffolding, Providin in ALLAHABAD, UTTAR PRADESH. Quantity: 72. Submission Deadline: 22-06-2026 17: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9405006.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 19 Items Sign in for GEM prices

#1

Disconnecting of fittings

Disconnecting the inlet, outlet of the LPG liquid and vapour line, SRV, HLA, Servo gauge, Radar gauge Manhole, water drain line, globe valves, ROV and other fittings of the bullets, removal of fire proof coating wherever necessary and disconnection of electrical cables without any damage as per the directions of the BPCL Site Engineer / Third Party Inspection Agency official. Any damage for the fittings or any equipments during removal & fixing of the connection has to be made good by the Tenderer - for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#2

Degassing of bullets

Degassing of bullets with BPCL supplied water after making necessary connections for in and out flow with suitable pipelines / hose arrangements as directed on site. The water used for degassing should be disposed off safely in the drainage and the sludge if any coming along with water should be carefully removed and disposed / kept in safe place as directed at site. The sludge should be buried if necessary as per directions of location in charge or his representative. A sample of all sludge collected should be handed over to the LIC / Site Engineer. Deboxing / Boxing, dismantling / Pitting back all gadgets on bullet, also all jobs related to blind Flanging up to 1st Isolation Valve -- for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#3

Providing MS tubular ladder and scaffolding

Providing MS tubular ladder/scaffolding inside the bullet suitable for cleaning of inner surface and suitable for carrying out all inspections like ultrasonic testing, MPI and all allied jobs as directed. Ladder / scaffolding(s) shall have to be retained at site till the completion of all three bullets testing and the same scaffolding(s) may be used for providing in the other bullets by turn. The contractor shall also provide oxygen meter and ensure oxygen level is as prescribed norms before vessel entry. Oxygen metre can be taken back by contractor after the work is over for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#4

Providing flame proof lighting arrangement and exhaust fan

Providing flame proof lighting arrangement and exhaust fan inside the bullet for carrying out necessary inspection, cleaning and NDT Tests. Contractor to supply the flame proof lightfittings, Junction boxes, required cables etc, as directed at site. Lighting arrangement shall have to be retained at site till completion of all the bullets and the same lighting arrangement may be used in the other bullets by turn - for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#5

Thorough cleaning of the inner surface

Thorough cleaning of the inner surface with water jet and clearing the sludge / rust materials followed by thorough cleaning of inner surface to remove the scales, oil and dust by wire brushes to expose the metal surfaces and thorough buffing of weld joints. Cleaning of minimum 50 mm on both sides of each weld joint including nozzle welds by thorough cleaning using rotary brushes to expose bare metal (Shinning surface) with care to entire weld joints of nozzles and weld area of support legs and other areas as directed at site. The contractor has to provide all equipments and consumables for carrying out the cleaning jobs. Localized grinding of the welds to be done if required as directed by our Site Engineer / Third Party Inspection Agency official. Dispose off the sludge of bullet at designated place after excavation as per direction of BPCL - for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#6

Carrying out external inspection

Carrying out external inspection on mound, retaining wall, inspection tunnel, bottom nozzle & its suspension/ supports, accessible top nozzles etc - for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#7

Fixing back all the liquid and vapour lines

Fixing back all the liquid and vapour lines after servicing the valves, EFCV and fixing all removed fittings like HLA, SRV, Pressure/ Temp/ Servo/ Rochester gauges, manhole cover etc. After completing the testing, purging/fresh gas in is to be carried out with assistance from & under supervision of & as instructed by BPCL/Third Party Inspection Agency - for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#8

Ultrasonic thickness measurement on shell plates

Ultrasonic thickness measurement on shell plates, dished end plates, LPG pipelines and nozzles as per applicable code and as per the instructions of Third Party Agency / BPCL Site Engineer - for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#9

Wet fluorescent magnetic particle test

Wet fluorescent magnetic particle test of welds using AC Yoke ,magnaflux ,tiede,Y6 black light and white washable distemper as background and as per applicable codes and as instructed by BPCL or Third Party Agency. Internal complete .all weld joints from inside, nozzle welds internal & external for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#10

Ultrasonic flaw detection

Complete Ultrasonic flaw detection of welds as per applicable code from inside the bullets and as instructed by BPCL or Third Party Agency for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#11

Dye penetration test

Dye penetration test at all accessible areas and as pe applicable code and as instructed by BPCL or Third Party Agency for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#12

Hardness Testing

Hardness Testing on selected spots on welds, HAZ and parent metal in each accessible area as per applicable codes and as instructed by BPCL and Third Party Agency - for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#13

Radiography test

Radiography test for weld joints at selected locations as problem defects,flaws observed during other tests subject to a maximum of 10 perncent of total weld length as per applicable code and as instructed by Third Party Inspecting Agency. Oonly to be conducted where defects, flaws are observed for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#14

Wet type calibaration of Bullets

Wet type calibaration of Bullets. Calibration table will be in 10 mm height intervals with 1 mm proportional part tables or as decided by BPCL. Approval & stamping of calibration charts by CPWD shall be done by the party. Before start of calibration adetailed procedure has to be submitted - for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#15

Settlement of Mounded bullets

Settlement of Mounded bullets Checking of settlement of Mounded bullets by using laser technique for horizontal plain shift and plumb line Theodolit technique for vertical plain shift. The person performing settlement shall be experienced in the relevant field. Settlement analysis for all three MSVs shall be carried out every six months for a period of three years. This excludes the settlement analysis to be carried out during hydrotesting. During hydrotesting, settlement monitoring shall be done as specified in Line Item No. 16.

18 nos Delivery: 30 days
#16

Settlement of Mounded bullets during hydrotesting

Settlement of Mounded bullets, Checking of settlement of Mounded bullets by using laser technique for horizontal plain shift and plumb line ,Theodolit technique for vertical plain shift. The person performing settlement shall be experienced in the relevant field. Settlement reading shall be taken during filling of water before hydrotest at 0, 25, 50 and after hydrotesting for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#17

Replacement of Nuts, Bolts, Washers and Gaskets

Replacement of Nuts, Bolts, Washers and Gaskets Supply and fixing of all gaskets, studs and nuts for all fittings after the isolation valve near to water drain line provided in Bullets - for 900MT Mounded storage Vessel

3 nos Delivery: 30 days
#18

Hydrotest and StretchTest

Hydrotest and StretchTest, To conduct HYDROTEST TEST of vessel and also connected pipings in total as required and as directed at site, after successful of all ND Test as per SMPV rules and relevant codes for 900 MT Mounded storage Vessel

3 nos Delivery: 30 days
#19

Certification and Documentation

Certification and Documentation for 900 MT LPG Storage Bullets To submit 3 sets of Testing and Inspection certificates AND reports and documents for all tests and inspection covered in the scope of work as per SMPV Rule No.19 .Issue of online certificate of test alongwith annexure giving the details of NDT inspection

3 nos Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data