TenderDekho Logo
Closed GEM

South Central Railway High Performance Power Supplies Tender Krishna Andhra Pradesh 2026 IS 550 / ISO Standards

Bid Publish Date

08-Aug-2026, 2:52 pm

Bid End Date

22-Aug-2026, 3:00 pm

Progress

Issue08-Aug-2026, 2:52 pm
AwardPending

Key Highlights

  • Past performance criteria: 20% of tender quantity in last 3 years with Indian Railways or government agencies
  • Delivery terms: Free Delivery at Site including loading/unloading; installation/commissioning may be included
  • Warranty certificates and test reports mandatory with material supply
  • Technical documentation: Make/Model details to be submitted with offer

Tender Overview

The South Central Railway invites bids for high performance power supplies in the Krishna, Andhra Pradesh (520001) region. The procurement targets a generic power supply category with attributes including Power Supply Type, multiple Outputs, and AC Power Supply with defined output phases. Precise quantities are not disclosed, and the estimated contract value is not stated. The tender emphasizes past performance with Indian Railways or government agencies, reinforcing eligibility for bulk, regular orders. Delivery is described as Free Delivery at Site with loading/unloading included, and installation/commissioning may be part of scope as per STC/ATC terms. Bidders must provide warranty certificates and technical literature (Make/Model) with their offer. The Bidder is expected to submit past performance evidence such as consignee receipts or acceptance certificates and to acknowledge deviations from additional specifications if any. This tender may favor suppliers with proven track records in supplying similar items, with a focus on reliability and timely delivery.

Technical Specifications & Requirements

  • Category: GENERIC; Product/Service: Power supply units with defined power output characteristics
  • Outputs: Multiple outputs; AC output phase: specified per tender item
  • Standards & certification expectation: warranty certificates and test reports to accompany delivery; technical leaflets detailing Make/Model numbers
  • Delivery scope: Free delivery at site; installation/commissioning may be included
  • Documentation requirements include past performance evidence and proof of acceptance by consignee
  • Emphasis on avoiding ambiguities by clearly stating deviations from provided specifications

Terms, Conditions & Eligibility

  • Past performance: satisfactory execution of similar items with at least 20% of tender quantity for a single contract in last 3 years
  • Warranty/Test reports: to be submitted with supply
  • Delivery terms: Free delivery at site; installation/commissioning scope included where applicable
  • Documentation: technical leaflets with Make/Model; proof of acceptance by consignee
  • Security/EMD: not specified in data; ensure compliant tender submission
  • Period of validity: bid validity period and adherence to ATC/ISDCT as applicable

Key Specifications

  • Power Supply Type

  • Number Of Outputs

  • AC Output Phase details

Terms & Conditions

  • 20% tender quantity past performance requirement within last 3 years

  • Free delivery at site with loading/unloading; installation/commissioning included if applicable

  • Warranty certificates and technical leaflets required with bid

Important Clauses

Payment Terms

Not specified in data; bidders should confirm payment terms in bid submission

Delivery Schedule

Free delivery at site; installation/commissioning scope as per STC/ATC

Penalties/Liquidated Damages

Not detailed in data; check ATC for LD or penalties

Bidder Eligibility

  • Past performance in supplying similar power supplies to government agencies

  • Ability to provide Make/Model specifications and warranty certificates

  • Compliance with site delivery, installation, and commissioning requirements

Authority & Contact

Department

Indian Railways

Office Name

Principal Chief Material Manager Secunderabad

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

high performance power supplies (Q3)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Office of Electric Loco Shed

Delivery Pincodes

520009

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sankati Srinivas520009,Office of Electric Loco Shed, Near Milk Factory, Chitti Nagar, Vijayawada.Office of Electric Loco Shed-520009115-

Authority Records

MINISTRY OF RAILWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9626863.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 3

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar power supply deliveries

4

Financial statements or solvency proof

5

Past performance receipts or consignee acceptance certificates

6

Warranty certificates and test reports

7

OEM authorization/Make-Model specification leaflets

8

Delivery and installation capability documentation

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
GENERIC Power Supply Type AC
GENERIC Number Of Outputs 1
AC Number of Output Phase for AC Power Supply Single Phase

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to bid for high performance power supplies tender in Krishna?

Bidders must submit GST, PAN, experience certificates, and financial statements along with past performance evidence for similar items. Include Make/Model leaflets, warranty certificates, and consignee acceptance proof. Ensure compliance with STC/ATC and provide deviations explicitly if any.

What documents are required for South Central Railway power supply bid in 2026?

Required documents include GST certificate, PAN, experience certificates for similar work, financial statements, past performance receipts, warranty/test reports, OEM authorizations, and technical leaflets showing Make/Model numbers. All documents should demonstrate readiness for site delivery and commissioning.

What are the delivery terms for power supplies to Indian Railways?

Delivery terms specify Free Delivery at Site including loading/unloading. Installation or commissioning may be included in contract price per STC/ATC. Ensure readiness for on-site delivery and provide installation schedule within bid to avoid delays.

Which standards or certifications are required for power supply tenders?

Warranties and test reports are mandatory. Supply should be accompanied by IS/IEC-compliant documentation and Make/Model leaflets. Validation against supplier performance is required for bulk orders; ensure ISI/ISO compliance where specified.

What is the past performance criterion for this Railways tender?

Bidders with satisfactory ex***** execution of contracts for similar items and at least 20% of tender quantity in a single contract during the last 3 years are considered responsive. Provide consignee receipts or CRAC as proof.

How to verify eligibility criteria for this tender in 2026?

Check eligibility against past performance, capability to deliver Free-at-Site, and submission of required technical documents. Provide Make/Model details, warranty, and test reports; demonstrate ability to fulfill installation requirements per STC/ATC terms.

What are the key terms around installation and commissioning?

If installation/commissioning is included, ensure the contract price covers related services. Confirm site readiness, provide installation timelines, and attach detailed commissioning procedures. Timely completion under ATC terms reduces risk of penalties.

What happens if deviations from specifications are proposed?

Deviations must be explicitly stated in the bid; unspecified deviations may be presumed to conform to all specifications. Clear deviation notes help avoid rejection and allow technical evaluation of conformity to overall requirements.