TenderDekho Logo
Active GEM

Indian Army LV7 Components Tender Sonitpur Assam 2026 – End User Certificate, 3 Years Experience, EFT Mandate

Bid Publish Date

22-Jul-2026, 5:54 pm

Bid End Date

01-Aug-2026, 6:00 pm

Progress

Issue22-Jul-2026, 5:54 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

155

Category

LV7 TMB 2702 5450 9950 REVERSE LIGHT SWITCH

Bid Type

Two Packet Bid

Key Highlights

  • Embedded Malicious Code Certification required and breach consequences clearly stated
  • OEM/Authorized Distributor authorization mandatory for bidding
  • End User Certificate provision via buyer's format; data sheet mandatory with bid
  • 3 years govt supply experience required; contracts to be attached
  • Data sheet vs. product parameters mismatch risk of rejection
  • Non-disclosure declaration to be uploaded on bidder letterhead
  • Option clause reserves right to modify BOQ quantities or scope
  • No explicit EMD amount published; bidders should follow standard bid security norms

Categories 12

Tender Overview

Indian Army invites bids for multiple LV7 components including light vehicle parts such as reverse light switches, tie rod assemblies, synchronising cones, and related items listed under LV7. The procurement is located in Sonitpur, Assam and encompasses 13 items with no disclosed BOQ quantities in the provided data. Key differentiators include mandatory supplier certifications, data-sheet verification, and OEM authorization requirements. Estimated value, start/end dates, and item-wise quantities are not disclosed, but bidders should prepare for a comprehensive supply of defence-grade components aligning with Central/State Govt procurement norms.

Technical Specifications & Requirements

  • No product-specific technical specifications are published in the data. Bidders must upload a detailed Data Sheet for each offered item and ensure alignment with product parameters to avoid bid rejection.
  • Mandatory documents include PAN Card, GSTIN, and a Cancelled Cheque; an EFT Mandate certified by the bank is required for payment processing.
  • End User Certificate may be provided in the buyer’s format; OEM authorization or distributor authorization is required if applicable.
  • Supplier must demonstrate prior manufacturing/supply of similar category products to government entities for at least 3 years; contracts supporting yearly quantity delivery are preferred.
  • A Malicious Code Certificate must certify absence of embedded malicious code; non-compliance risks contract termination.

Terms, Conditions & Eligibility

  • EMD/Performance terms: Not disclosed in the data; bidders must fulfill standard government bid security practices.
  • Experience criteria: At least 3 years of regular supply to Central/State Govt/PSU entities; primary product must meet the criterion in case of bundles.
  • Data sheet verification: Discrepancies between data sheet and offered parameters may lead to bid rejection. Ensure consistency with ISI/IS numbers if applicable.
  • Authorisation: OEM or authorised distributor details must be provided; NDA and non-disclosure declarations are required.
  • Warranty/penalties: Not specified in data; ensure compliance with standard govt procurement penalties and warranty expectations.

Key Specifications

    • Product category: LV7 vehicle components (examples include reverse light switch, tie rod assembly, synchronising cone, demister fan, oil cooler, 24VDC/12VDC converter, suspension/leaf springs)
    • Government procurement context: supply to Indian Army, Defence category items
    • Data sheet requirement: uploaded with bid; ensure parameter match with offered items
    • Experience: minimum 3 years of regular govt supply to Central/State Govt/PSU
    • Authorisation: OEM/authorized distributor documentation mandatory

Terms & Conditions

  • 3 years govt procurement experience mandatory with contracts supporting yearly quantities

  • PAN, GSTIN, cancelled cheque and EFT mandate must be submitted with bid

  • Data sheet alignment and OEM authorization are critical to bid viability

Important Clauses

Payment Terms

Not explicitly published; bidders should anticipate standard govt NP terms and EFT-based payments per supplier contract

Delivery Schedule

No explicit delivery timeline provided; expect delivery within typical defence procurement windows after order conformation

Penalties/Liquidated Damages

Not detailed; vendors should assume standard LD clauses and performance penalties per defence procurement norms

Bidder Eligibility

  • Regularly manufactured and supplied similar LV7 category products to government entities for ≥3 years

  • No liquidation, court receivership, or bankruptcy; adequate financial standing

  • Compliance with data sheet verification and minimum documentation requirements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

LV7 TMB 2702 5450 9950 REVERSE LIGHT SWITCH , LV7 STLN VF B 2594502 TIE ROD ASSY , LV7 TMB 2060 3210 7139 2ND LEAF , LV7 TATA 2657 5420 9952 SPEEDOMETER 1 0 825 , LV7 STLN VF F 6W00600 DEMISTER FAN , LV7 STLN X 3943800 M 250990 SPRING BRAKE CHAMBER , LV7 STLN VF X 7821000 S A OF ELEMENT OIL COOLER , LV7 STLN VF F 2202400 24VDC 12VDC CONVERTER ACTIA MAKE , LV7 STLN VF B 3118702 S A SPRING SHACKLE , LV7 STLN VF 5360 72 0472208 SPRING LEAF , LV7 STLN VF 5360 72 0472170 SPRING LEAF , LV7 TATA 2505 2620 3802 SYNCHRONISING CONE , LV7 TMB 2576 2410 0101 ASSY RUBBER SUPPORT FRONT

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

26

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

SONITPUR

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SONITPURSONITPUR--1930-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9626673.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 13 Items Sign in for GEM prices

#1

LV7 TMB 2702 5450 9950 REVERSE LIGHT SWITCH

LV7 TMB 2702 5450 9950 REVERSE LIGHT SWITCH

19 pieces Delivery: 30 days
#2

LV7 STLN VF B 2594502 TIE ROD ASSY

LV7 STLN VF B 2594502 TIE ROD ASSY

10 pieces Delivery: 30 days
#3

LV7 TMB 2060 3210 7139 2ND LEAF

LV7 TMB 2060 3210 7139 2ND LEAF

9 pieces Delivery: 30 days
#4

LV7 TATA 2657 5420 9952 SPEEDOMETER 1 0 825

LV7 TATA 2657 5420 9952 SPEEDOMETER 1 0 825

12 pieces Delivery: 30 days
#5

LV7 STLN VF F 6W00600 DEMISTER FAN

LV7 STLN VF F 6W00600 DEMISTER FAN

13 pieces Delivery: 30 days
#6

LV7 STLN X 3943800 M 250990 SPRING BRAKE CHAMBER

LV7 STLN X 3943800 M 250990 SPRING BRAKE CHAMBER

12 pieces Delivery: 30 days
#7

LV7 STLN VF X 7821000 S A OF ELEMENT OIL COOLER

LV7 STLN VF X 7821000 S A OF ELEMENT OIL COOLER

12 pieces Delivery: 30 days
#8

LV7 STLN VF F 2202400 24VDC 12VDC CONVERTER ACTIA MAKE

LV7 STLN VF F 2202400 24VDC 12VDC CONVERTER ACTIA MAKE

2 pieces Delivery: 30 days
#9

LV7 STLN VF B 3118702 S A SPRING SHACKLE

LV7 STLN VF B 3118702 S A SPRING SHACKLE

11 pieces Delivery: 30 days
#10

LV7 STLN VF 5360 72 0472208 SPRING LEAF

LV7 STLN VF 5360 72 0472208 SPRING LEAF

15 pieces Delivery: 30 days
#11

LV7 STLN VF 5360 72 0472170 SPRING LEAF

LV7 STLN VF 5360 72 0472170 SPRING LEAF

8 pieces Delivery: 30 days
#12

LV7 TATA 2505 2620 3802 SYNCHRONISING CONE

LV7 TATA 2505 2620 3802 SYNCHRONISING CONE

11 pieces Delivery: 30 days
#13

LV7 TMB 2576 2410 0101 ASSY RUBBER SUPPORT FRONT

LV7 TMB 2576 2410 0101 ASSY RUBBER SUPPORT FRONT

21 pieces Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

- PAN Card copy

2

- GSTIN copy

3

- Cancelled cheque copy

4

- EFT Mandate certified by bank

5

- Data Sheet for all offered products

6

- End User Certificate (buyer format if requested)

7

- OEM Authorization/Manufacturer Authorization (if applicable)

8

- Malicious Code Certificate

9

- Non-Disclosure Declaration (bidder letterhead)

10

- Previous government contracts / experience certificates (3 years required)

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid on Indian Army LV7 components tender in Assam 2026?

Bidders must submit PAN, GSTIN, cancelled cheque, EFT Mandate, and OEM authorization along with a data sheet for each offered item. Ensure 3 years of govt supply experience and End User Certificate if required. Provide NDA and Malicious Code Certificate; verify parameters align with the data sheet to avoid rejection.

What documents are required for defence procurement in Sonitpur Assam?

Required documents include PAN, GSTIN, cancelled cheque, EFT Mandate certified by bank, data sheets, OEM authorization, End User Certificate format, Malicious Code Certificate, NDA, and previous govt contracts demonstrating 3 years of relevant supply experience.

What are the key eligibility criteria for LV7 components tender in Assam?

Key criteria: minimum 3 years of govt/PSU supply of similar LV7 items; financial stability; demonstrable contracts with yearly quantities; OEM/authorized distributor authorization; absence of liquidation or bankruptcy; data sheet alignment with offered items.

What technical documents must accompany the LV7 bid submission in Assam?

Submit Data Sheets for all offered LV7 items, OEM authorization, End User Certificate (if requested), Malicious Code Certificate, and NDA. Ensure data sheet matches product parameters and that supplier capabilities meet defence-grade requirements.

When is the submission deadline for this Indian Army tender in Assam 2026?

Specific bid submission dates are not provided here; bidders should monitor official procurement notices for the Indian Army LV7 components contract in Sonitpur and prepare by ensuring complete documentation as outlined, including data sheets and OEM authorisations.

What payment terms are expected for Indian Army LV7 component supply contracts?

While exact terms are not published, bidders should anticipate standard govt procurement practices with EFT-based payments and contractually defined milestones. Ensure EFT Mandate is bank-certified and aligns with contract payment schedules.

What is the role of the End User Certificate in this defence tender?

End User Certificate may be provided in the buyer’s standard format and is required to confirm authorised end-use of supplied LV7 components. Prepare the certificate format in advance and attach with bid if specified by the buyer.

What are the risks of data sheet mismatches in this tender?

Mismatches between data sheets and offered product parameters can lead to bid rejection. Mitigate by uploading accurate, item-specific data sheets, cross-checking dimensions, ratings, and compatibility with the 13 LV7 items listed.