TenderDekho Logo
Closed GEM

Invitation to Bid - Chassis Core Switch with Min 6 Slots or More and with Line Cards and SUP engines Transceivers with in PAPUM PARE, ARUNACHAL PRADESH

Bid Publish Date

01-Jul-2025, 1:31 pm

Bid End Date

22-Jul-2025, 2:00 pm

EMD

₹8,00,000

Progress

Issue01-Jul-2025, 1:31 pm
Technical22-07-2025 12:40:40
Financial
Award14-Sep-2025, 2:47 am
Explore all 4 tabs to view complete tender details

Quantity

27105

Category

Chassis Core Switch with Min 6 Slots or More and with Line Cards and SUP engines Transceivers with 3 Years Warranty

Bid Type

Two Packet Bid

Categories 41

North Eastern Regional Institute Of Science And Technology Arunachal Pradesh has released a public tender for Chassis Core Switch with Min 6 Slots or More and with Line Cards and SUP engines Transceivers with 3 Years Warranty, 42 U Network Rack, Distribution Switch With Transceivers, Software Define Controller with VMware Software with a Rack Server, Access Switch, 09 U Network Rack, 06 U Network Rack, 12 Core Single Mode OFC Armoured, 48 Core Armoured OFC cable Laying in South Campus, HDPE Pipe, OFC LIU 24 Ports, RJ 45 Patch Panel fully loaded, Cat 6 Patch Chord 2 Mtrs, Cat 6 Patch Chord 1 Mtrs, 10 KVA Online UPS with battery 120 Minutes Back up, Armoured LC SC MM OFC Duplex Patch chord 2 mtrs, Armoured LC LC SM OFC Duplex Patch chord 2 mtrs, Armoured LC SC SM OFC Duplex Patch chord 2mtrs, Cat7 Patch Cord 10 Mtr 10G Support, Cat7 Patch Cord 5 Mtr 10G Support, Armoured LC SC MM Duplex Patch Cord 5 Mtr, Armoured LC SC SM Duplex Patch Cord 5 Mtr, Armoured LC LC MM Duplex Patch Cord 5 Mtr, Armoured LC LC SM Duplex Patch Cord 5 Mtr, CAT 6A UTP Cable 10 Gbps capability, IO boxand Back Boxand Face Plate with keystone, 2 inch PVC Capping OR casing Pipe, 1 inch PVC Capping OR casing Pipe, 1 inch and 2 inch bend OR L OR T connectors to complete the Solution OR installation, 8 Port Serial CONSOL Server ATEN SN9108C0 or Equivalent of Higher all accessories to be added, 6 Core OFC cable, Omada Pro AX5400 EAP 670 Ceiling Mount WiFi 6 Access Point, Brick chamber OR manhole Size 1 m x1 x1 point 5 mtr Considering all 5 Locations, Underground OFC Laying using HDD method though HDPE pipe, Pulling of Fiber Cable through HDPE pipes, Construction of brick chamber or manhole Size 1 m x1 x1 point 5 mtr Considering all 5 Locations, OFC Splicing 24 In ET Cell plus 120 in Admin Rack plus 24 Each in 5 Buildings 24 x 5 is equal to 120 Total 264 Cores, OFC Laying RCC root or Join Indicator of Height Min 2 mtrs or more in PAPUM PARE, ARUNACHAL PRADESH. Quantity: 27105. Submission Deadline: 22-07-2025 14: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Chassis Core Switch with Min 6 Slots or More and with Line Cards and SUP engines Transceivers with 3 Years Warranty , 42 U Network Rack , Distribution Switch With Transceivers , Software Define Controller with VMware Software with a Rack Server , Access Switch , 09 U Network Rack , 06 U Network Rack , 12 Core Single Mode OFC Armoured , 48 Core Armoured OFC cable Laying in South Campus , HDPE Pipe , OFC LIU 24 Ports , RJ 45 Patch Panel fully loaded , Cat 6 Patch Chord 2 Mtrs , Cat 6 Patch Chord 1 Mtrs , 10 KVA Online UPS with battery 120 Minutes Back up , Armoured LC SC MM OFC Duplex Patch chord 2 mtrs , Armoured LC LC SM OFC Duplex Patch chord 2 mtrs , Armoured LC SC SM OFC Duplex Patch chord 2mtrs , Cat7 Patch Cord 10 Mtr 10G Support , Cat7 Patch Cord 5 Mtr 10G Support , Armoured LC SC MM Duplex Patch Cord 5 Mtr , Armoured LC SC SM Duplex Patch Cord 5 Mtr , Armoured LC LC MM Duplex Patch Cord 5 Mtr , Armoured LC LC SM Duplex Patch Cord 5 Mtr , CAT 6A UTP Cable 10 Gbps capability , IO boxand Back Boxand Face Plate with keystone , 2 inch PVC Capping OR casing Pipe , 1 inch PVC Capping OR casing Pipe , 1 inch and 2 inch bend OR L OR T connectors to complete the Solution OR installation , 8 Port Serial CONSOL Server ATEN SN9108C0 or Equivalent of Higher all accessories to be added , 6 Core OFC cable , Omada Pro AX5400 EAP 670 Ceiling Mount WiFi 6 Access Point , Brick chamber OR manhole Size 1 m x1 x1 point 5 mtr Considering all 5 Locations , Underground OFC Laying using HDD method though HDPE pipe , Pulling of Fiber Cable through HDPE pipes , Construction of brick chamber or manhole Size 1 m x1 x1 point 5 mtr Considering all 5 Locations , OFC Splicing 24 In ET Cell plus 120 in Admin Rack plus 24 Each in 5 Buildings 24 x 5 is equal to 120 Total 264 Cores , OFC Laying RCC root or Join Indicator of Height Min 2 mtrs or more

Authority Records

MINISTRY OF EDUCATIONHIGHER EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8020990.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 39 Items Sign in for GEM prices

#1

Chassis Core Switch with Min 6 Slots or More and with Line Cards and SUP engines Transceivers with 3 Years Warranty

Chassis Core Switch with Min 6 Slots or More and with Line Cards and SUP engines Transceivers with 3 Years Warranty

1 piece Delivery: 45 days
#2

42 U Network Rack

42 U Network Rack

1 piece Delivery: 45 days
#3

Distribution Switch With Transceivers

Distribution Switch With Transceivers

2 piece Delivery: 45 days
#4

Software Define Controller with VMware Software with a Rack Server

Software Define Controller with VMware Software with a Rack Server

1 piece Delivery: 45 days
#5

Access Switch

Access Switch

2 piece Delivery: 45 days
#6

Access Switch

Access Switch

4 piece Delivery: 45 days
#7

09 U Network Rack

09 U Network Rack

6 piece Delivery: 45 days
#8

06 U Network Rack

06 U Network Rack

4 piece Delivery: 45 days
#9

12 Core Single Mode OFC Armoured

12 Core Single Mode OFC Armoured

3,000 meter Delivery: 45 days
#10

48 Core Armoured OFC cable Laying in South Campus

48 Core Armoured OFC cable Laying in South Campus

3,000 meter Delivery: 45 days
#11

HDPE Pipe

HDPE Pipe

6,000 meter Delivery: 45 days
#12

OFC LIU 24 Ports

OFC LIU 24 Ports

13 piece Delivery: 45 days
#13

RJ 45 Patch Panel fully loaded

RJ 45 Patch Panel fully loaded

8 piece Delivery: 45 days
#14

Cat 6 Patch Chord 2 Mtrs

Cat 6 Patch Chord 2 Mtrs

270 piece Delivery: 45 days
#15

Cat 6 Patch Chord 1 Mtrs

Cat 6 Patch Chord 1 Mtrs

270 piece Delivery: 45 days
#16

10 KVA Online UPS with battery 120 Minutes Back up

10 KVA Online UPS with battery 120 Minutes Back up

1 piece Delivery: 45 days
#17

Armoured LC SC MM OFC Duplex Patch chord 2 mtrs

Armoured LC SC MM OFC Duplex Patch chord 2 mtrs

10 piece Delivery: 45 days
#18

Armoured LC LC SM OFC Duplex Patch chord 2 mtrs

Armoured LC LC SM OFC Duplex Patch chord 2 mtrs

40 piece Delivery: 45 days
#19

Armoured LC SC SM OFC Duplex Patch chord 2mtrs

Armoured LC SC SM OFC Duplex Patch chord 2mtrs

70 piece Delivery: 45 days
#20

Cat7 Patch Cord 10 Mtr 10G Support

Cat7 Patch Cord 10 Mtr 10G Support

20 piece Delivery: 45 days
#21

Cat7 Patch Cord 5 Mtr 10G Support

Cat7 Patch Cord 5 Mtr 10G Support

20 piece Delivery: 45 days
#22

Armoured LC SC MM Duplex Patch Cord 5 Mtr

Armoured LC SC MM Duplex Patch Cord 5 Mtr

10 piece Delivery: 45 days
#23

Armoured LC SC SM Duplex Patch Cord 5 Mtr

Armoured LC SC SM Duplex Patch Cord 5 Mtr

10 piece Delivery: 45 days
#24

Armoured LC LC MM Duplex Patch Cord 5 Mtr

Armoured LC LC MM Duplex Patch Cord 5 Mtr

10 piece Delivery: 45 days
#25

Armoured LC LC SM Duplex Patch Cord 5 Mtr

Armoured LC LC SM Duplex Patch Cord 5 Mtr

10 piece Delivery: 45 days
#26

CAT 6A UTP Cable 10 Gbps capability

CAT 6A UTP Cable 10 Gbps capability

14 piece Delivery: 45 days
#27

IO boxand Back Boxand Face Plate with keystone

IO boxand Back Boxand Face Plate with keystone

270 piece Delivery: 45 days
#28

2 inch PVC Capping OR casing Pipe

2 inch PVC Capping OR casing Pipe

150 piece Delivery: 45 days
#29

1 inch PVC Capping OR casing Pipe

1 inch PVC Capping OR casing Pipe

300 piece Delivery: 45 days
#30

1 inch and 2 inch bend OR L OR T connectors to complete the Solution OR installation

1 inch and 2 inch bend OR L OR T connectors to complete the Solution OR installation

200 piece Delivery: 45 days
#31

8 Port Serial CONSOL Server ATEN SN9108C0 or Equivalent of Higher all accessories to be added

8 Port Serial CONSOL Server ATEN SN9108C0 or Equivalent of Higher all accessories to be added

4 piece Delivery: 45 days
#32

6 Core OFC cable

6 Core OFC cable

1,000 meter Delivery: 45 days
#33

Omada Pro AX5400 EAP 670 Ceiling Mount WiFi 6 Access Point

Omada Pro AX5400 EAP 670 Ceiling Mount WiFi 6 Access Point

20 piece Delivery: 45 days
#34

Brick chamber OR manhole Size 1 m x1 x1 point 5 mtr Considering all 5 Locations

Brick chamber OR manhole Size 1 m x1 x1 point 5 mtr Considering all 5 Locations

20 piece Delivery: 45 days
#35

Underground OFC Laying using HDD method though HDPE pipe

Underground OFC Laying using HDD method though HDPE pipe

6,000 meter Delivery: 45 days
#36

Pulling of Fiber Cable through HDPE pipes

Pulling of Fiber Cable through HDPE pipes

6,000 meter Delivery: 45 days
#37

Construction of brick chamber or manhole Size 1 m x1 x1 point 5 mtr Considering all 5 Locations

Construction of brick chamber or manhole Size 1 m x1 x1 point 5 mtr Considering all 5 Locations

20 piece Delivery: 45 days
#38

OFC Splicing 24 In ET Cell plus 120 in Admin Rack plus 24 Each in 5 Buildings 24 x 5 is equal to 120 Total 264 Cores

OFC Splicing 24 In ET Cell plus 120 in Admin Rack plus 24 Each in 5 Buildings 24 x 5 is equal to 120 Total 264 Cores

264 core Delivery: 45 days
#39

OFC Laying RCC root or Join Indicator of Height Min 2 mtrs or more

OFC Laying RCC root or Join Indicator of Height Min 2 mtrs or more

60 piece Delivery: 45 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
BMG INFORMATICS PRIVATE LIMITED   Under PMA
-22-07-2025 12:40:40
2
CORPORATE INFOTECH PRIVATE LIMITED.   Under PMA
-22-07-2025 12:27:21
3
HUE SERVICE PRIVATE LIMITED   Under PMA
-22-07-2025 13:23:05
4
INFOTECH SOLUTION   Under PMA
-22-07-2025 13:31:56

Financial Results

Rank Seller Price Item
L1
BMG INFORMATICS PRIVATE LIMITED( MSE Social Category:General )    Under PMA
Item Categories : Chassis Core Switch with Min 6 Slots or More and with Line Cards and SUP engines Transceivers with
L2
INFOTECH SOLUTION   Under PMA
Item Categories : Chassis Core Switch with Min 6 Slots or More and with Line Cards and SUP engines Transceivers with
L3
CORPORATE INFOTECH PRIVATE LIMITED.   Under PMA
Item Categories : Chassis Core Switch with Min 6 Slots or More and with Line Cards and SUP engines Transceivers with

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.