TenderDekho Logo
Closed GEM

Salem Steel Plant Sliding Ledge/Clamp/Link Components Tender Tamil Nadu 2025 - IS MII/Udhayam, 16 Weeks Delivery, FOB Salem

Bid Publish Date

24-Oct-2025, 4:22 pm

Bid End Date

15-Nov-2025, 3:00 pm

Progress

Issue24-Oct-2025, 4:22 pm
Technical15-11-2025 14:59:11
Award25-Dec-2025, 1:03 am
Explore all 4 tabs to view complete tender details

Quantity

375

Category

EXPANDING WEDGE FOR MANDREL-CPRL

Bid Type

Two Packet Bid

Key Highlights

  • Salem Steel Plant requires 20 CPRL/MANDREL-CPRL components including sliding ledges, clamps, links, wedges, and covers
  • Delivery timeline fixed at 16 weeks from order; quantity variation up to 25% with proportional schedule changes
  • FOB Salem Steel Plant pricing on GeM including freight, insurance, P&F, with taxes; 100% payment in 30 days post-acceptance
  • Warranty: minimum 12 months from installation or 18 months from supply; warranty certificate mandatory
  • MII/Udhayam certificate required; Composite Undertaking Form to accompany bid
  • Inter-matching items (13–15 & 18–20) require single-party order
  • Material test certificate to be attached during actual supply

Categories 46

Tender Overview

Salem Steel Plant in SALEM, TAMIL NADU invites bids for a broad range of mechanical components including SLIDING LEDGE-1 to LEDGE-4 for ENTRY SHEAR-CPRL, CLAMPING STRIP/SEGMENTS for MANDREL-CPRL, EXPANDING WEDGE, LINKS, FINGER CLAMP, BACKUP ROLL PLUMMER BLOCK COVERS, SS STUB END-BEND ROLL SCALE BREAKER APL3, and SS BEARING HOUSING for BENDING ROLL APL-3. The 20-item BoQ comprises metal fabrication and assembly parts for the CPRL/MANDREL-CPRL lines. Bids promote standard compliance, with F.O.R Salem Steel Plant delivery and all-inclusive pricing on GeM.

  • Location: Salem, Tamil Nadu (PIN 636001)
  • Delivery: 16 weeks from order; extended timeframe via option clause up to original period, minimum 30 days
  • Payment: 100% within 30 days after receipt and acceptance at Salem Steel Plant Stores
  • EMD: ₹ 1,000 for listed items; price to be quoted on FOB basis including Freight, Insurance, P&F on GeM
  • Warranty: minimum 12 months from installation or 18 months from supply; MII/Udhayam certification required
  • Special terms: composite undertaking, MII certificate, single-party order for inter-matching items, firm price until supply completion
  • This tender emphasizes exact drawings/specifications adherence and a 25% quantity option during contract execution.

Technical Specifications & Requirements

  • Items are broadly described by title: “SLIDING LEDGE-1 to LEDGE-4 for ENTRY SHEAR-CPRL”, “CLAMP SEGMENT-1/2 for MANDREL-CPRL”, “EXPANDING WEDGE for MANDREL-CPRL”, “LONG LINK/MIDDLE LINK for SHEAR-CPRL”, “FINGER CLAMP for WELDING MACHINE-CPRL”, “BACKUP ROLL PLUMMER BLOCK COVERS P-1/2/3 APL3/APL”, “SS STUB END-BEND ROLL SCALE BREAKER APL3”, “SS BEARING HOUSING FOR BENDING ROLL APL-3”, “SUPPORTS-BENDING ROLL BOTTOM UNIT-1/2”, and related components.
  • Delivery Schedule: 16 weeks from order placement; option clause may extend, with time proportional to quantity increase (minimum 30 days)
  • Materials/Manufacture: supply per drawings; material test certificate to be provided at supply; items 13-15 & 18-20 noted as inter-matching, requiring single-party ordering
  • Quality/Compliance: no explicit standards listed; bidders must attach signed technical specifications and ensure conformance with drawings; warranty and post-delivery support implied by AtC
  • Documentation: EMD, composite undertaking, MII certificate, and technical bid documents required; price bids on FOB Salem basis including freight/insurance/P&F; GST/PAN validity assumed
  • Warranty/Support: minimum 12 months from installation, or 18 months from supply; warranty certificate to accompany delivery

Terms, Conditions & Eligibility

  • EMD: ₹ 1,000 for items 1–5, 9–12; bidders must provide EMD as per clause; conditional waiver per policy
  • Delivery: 16 weeks from order date; option clause allows quantity variation up to 25% with corresponding delivery extension rules
  • Payment Terms: 100% payment within 30 days after receipt and acceptance at SPS Stores
  • MII/Udhayam Preference: eligibility requires valid MII/Udhayam certificates
  • Warranty: minimum 12 months from installation; 18 months from supply; warranty certificate required with supply
  • Specifications: bidder must submit signed technical specification copy; items 13–15 & 18–20 require single-party order due to inter-matching
  • Pricing: firm price maintained until supply completion; no price bid in technical offer; base price on FOB Salem Steel Plant with all charges
  • Documents: Composite Undertaking Form; MII certificate; eligibility documentation; GST/PAN/experience/fiscal documents often required
  • Delivery/Quality: supply per drawings with material test certificates; deviation allowed only with attached documentation

Key Specifications

  • Items: sliding ledges, clamps, links, wedges, finger clamps, plummer block covers, scale breakers, bearing housings

  • Delivery: 16 weeks from order; extensions per option clause with minimum 30 days

  • EMD: ₹1,000 for specified items; rest per policy

  • Warranty: at least 12 months from installation; 18 months from supply

  • Payment: 100% within 30 days after receipt and acceptance

  • Contractual compliance: firm price until completion; no price bid in technical bid

Terms & Conditions

  • EMD requirement of ₹1,000 for select items; submission with bid

  • Delivery within 16 weeks, with option-based extensions up to original period

  • 100% payment terms within 30 days post-acceptance at SPS stores

Important Clauses

Payment Terms

100% payment within 30 days after receipt and acceptance at Salem Steel Plant Stores; FOB Salem pricing including Freight & Insurance on GeM

Delivery Schedule

Delivery within 16 weeks from order placement; quantity variations up to 25% with proportional delivery time adjustments

Penalties/Liquidated Damages

Not explicitly stated; delivery extensions governed by option clause; must adhere to delivery timelines or face implied non-performance risk

Bidder Eligibility

  • Valid MII/Udhayam certificate for eligibility

  • Experience evidence for supply of CPRL/MANDREL-CPRL components

  • GeM/F.O.R Salem Steel Plant compliance and signing of technical specs

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SLIDING LEDGE-1 FOR ENTRY SHEAR-CPRL , SLIDING LEDGE-2 FOR ENTRY SHEAR-CPRL , SLIDING LEDGE-3 FOR ENTRY SHEAR-CPRL , SLIDING LEDGE-4 FOR ENTRY SHEAR- CPRL , CLAMPING STRIP FOR MANDREL-CPRL , CLAMP SEGMENT-1 FOR MANDREL-CPRL , CLAMP SEGMENT-2 FOR MANDREL-CPRL , EXPANDING WEDGE FOR MANDREL-CPRL , LONG LINK FOR SHEAR-CPRL , MIDDLE LINK FOR SHEAR- CPRL , FINGER CLAMP FOR WELDING MACHINE-CPRL , SHORT LINK FOR SHEAR-CPRL , BACKUP ROLL PLUMMER BLOCK COVER P-1 APL3 , BACKUP ROLL PLUMMER BLOCK COVER P-2 APL , BACKUP ROLL PLUMMER BLOCK COVER P-3 APL3 , SS STUB END-BEND ROLL SCALE BREAKER APL3 , SS BEARING HOUSING FOR BENDING ROLLAPL-3 , SUPPORT- BENDING ROLL BOTTOM UNIT-1 , SUPPORT-BENDING ROLL BOTTOM UNIT-2 , SUPPORTS-BACK UP ROLL BOTTOM UNIT- 1

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8507374.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 20 Items Sign in for GEM prices

#1

SLIDING LEDGE-1 FOR ENTRY SHEAR-CPRL

SLIDING LEDGE-1 FOR ENTRY SHEAR-CPRL

2 nos Delivery: 112 days
#2

SLIDING LEDGE-2 FOR ENTRY SHEAR-CPRL

SLIDING LEDGE-2 FOR ENTRY SHEAR-CPRL

2 nos Delivery: 112 days
#3

SLIDING LEDGE-3 FOR ENTRY SHEAR-CPRL

SLIDING LEDGE-3 FOR ENTRY SHEAR-CPRL

2 nos Delivery: 112 days
#4

SLIDING LEDGE-4 FOR ENTRY SHEAR-CPRL

SLIDING LEDGE-4 FOR ENTRY SHEAR-CPRL

2 nos Delivery: 112 days
#5

CLAMPING STRIP FOR MANDREL-CPRL

CLAMPING STRIP FOR MANDREL-CPRL

2 nos Delivery: 112 days
#6

CLAMP SEGMENT-1 FOR MANDREL-CPRL

CLAMP SEGMENT-1 FOR MANDREL-CPRL

2 nos Delivery: 112 days
#7

CLAMP SEGMENT-2 FOR MANDREL-CPRL

CLAMP SEGMENT-2 FOR MANDREL-CPRL

2 nos Delivery: 112 days
#8

EXPANDING WEDGE FOR MANDREL-CPRL

EXPANDING WEDGE FOR MANDREL-CPRL

1 nos Delivery: 112 days
#9

LONG LINK FOR SHEAR-CPRL

LONG LINK FOR SHEAR-CPRL

2 nos Delivery: 112 days
#10

MIDDLE LINK FOR SHEAR-CPRL

MIDDLE LINK FOR SHEAR-CPRL

2 nos Delivery: 112 days
#11

FINGER CLAMP FOR WELDING MACHINE-CPRL

FINGER CLAMP FOR WELDING MACHINE-CPRL

10 nos Delivery: 112 days
#12

SHORT LINK FOR SHEAR-CPRL

SHORT LINK FOR SHEAR-CPRL

2 nos Delivery: 112 days
#13

BACKUP ROLL PLUMMER BLOCK COVER P-1 APL3

BACKUP ROLL PLUMMER BLOCK COVER P-1 APL3

46 nos Delivery: 112 days
#14

BACKUP ROLL PLUMMER BLOCK COVER P-2 APL

BACKUP ROLL PLUMMER BLOCK COVER P-2 APL

46 nos Delivery: 112 days
#15

BACKUP ROLL PLUMMER BLOCK COVER P-3 APL3

BACKUP ROLL PLUMMER BLOCK COVER P-3 APL3

46 nos Delivery: 112 days
#16

SS STUB END-BEND ROLL SCALE BREAKER APL3

SS STUB END-BEND ROLL SCALE BREAKER APL3

60 nos Delivery: 112 days
#17

SS BEARING HOUSING FOR BENDING ROLLAPL-3

SS BEARING HOUSING FOR BENDING ROLLAPL-3

8 set Delivery: 112 days
#18

SUPPORT-BENDING ROLL BOTTOM UNIT-1

SUPPORT-BENDING ROLL BOTTOM UNIT-1

46 nos Delivery: 112 days
#19

SUPPORT-BENDING ROLL BOTTOM UNIT-2

SUPPORT-BENDING ROLL BOTTOM UNIT-2

46 nos Delivery: 112 days
#20

SUPPORTS-BACK UP ROLL BOTTOM UNIT-1

SUPPORTS-BACK UP ROLL BOTTOM UNIT-1

46 nos Delivery: 112 days

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar CPRL/MANDREL-CPRL component supply

4

Financial statements supporting turnover (as applicable)

5

EMD document (₹1,000 per item group as specified)

6

Technical bid documents including signed copies of technical specifications

7

OEM authorizations or single-party confirmation for inter-matching items

8

MII/Udhayam certificate

9

Composite Undertaking Form

10

Material test certificates to be submitted during delivery

Technical Results

S.No Seller Item Date Status
1
ALAGU ENGINEERING WORKS   Under PMA
-15-11-2025 14:59:11
2
HMTC ENGINEERING COMPANY (KOLKATA) PRIVATE LIMITED   Under PMA
-15-11-2025 11:15:59
3
METAL PRODUCTS (INDIA)   Under PMA
-14-11-2025 20:37:15
4
S P ENTERPRISE   Under PMA
-14-11-2025 13:38:18
5
TECHNO ENGINEERS   Under PMA
-15-11-2025 14:48:33

Contract / Result Documents 15

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid for the Salem Steel Plant CPRL components tender in Tamil Nadu 2025

Prepare a GeM bid with FOB Salem pricing including freight and P&F; attach EMD ₹1,000 for relevant items, composite Undertaking Form, MII/Udhayam certificate, and signed technical specifications; delivery is 16 weeks, payment 30 days after acceptance; ensure material test certificates with supply.

What documents are required for the Salem Steel Plant tender participation

Submit GST and PAN, experience certificates for CPRL/MANDREL-CPRL items, financial statements if requested, EMD doc, composite undertaking, MII/Udhayam certificates, OEM authorizations if applicable, signed technical specification copy, and material test certificates at supply.

What are the delivery and payment terms for the GeM Salem tender

Delivery: 16 weeks from order; option clauses allow 25% quantity variation with proportional extension; payment: 100% within 30 days after receipt and acceptance at SPS Stores; pricing on FOB Salem Plant basis including freight and insurance.

What warranty is required for the CPRL components tender in Salem

Warranty: minimum 12 months from installation or 18 months from supply; warranty certificate must accompany delivery and be submitted with the supply documents.

Which items require inter-matching and single-party ordering in the Salem tender

Items 13–15 and 18–20 are inter-matching; the tender requires single-party order for these items to ensure compatibility and seamless integration per drawings.

What is the EMD amount for the Salem Steel Plant items

EMD amount is ₹1,000 for item groups 1–5, 9–12 as specified; bidders must provide the EMD document with their bid on GeM.

How to demonstrate MII/Udhayam eligibility for this tender

Submit valid MII/Udhayam certificates along with Composite Undertaking Form; eligibility requires certification verification and possibly verification of enterprise status per GeM guidelines.

What are the critical technical specifications for these items in Salem

The tender specifies component names and drawings; items must be supplied per technical specifications and drawings enclosed; material test certificates and signed copies of technical specs are mandatory at supply and acceptance.