TenderDekho Logo
Closed GEM

Bids are Invited For Router VOIP Gateway,Firewall,Endpoint Security Antivirus Solution,Subscription 500 end points,Layer in KODERMA, JHARKHAND

Bid Publish Date

16-Oct-2025, 12:08 pm

Bid End Date

10-Dec-2025, 1:00 pm

EMD

₹30,00,000

Generate Docs

Progress

Issue16-Oct-2025, 12:08 pm
Corrigendum08-Dec-2025
AwardPending

Public procurement opportunity for National Informatics Centre Services Incorporated (nicsi) Router VOIP Gateway, Firewall, Endpoint Security Antivirus Solution, Subscription 500 end points, Layer 3 Switch 48 Port, Layer 2 manageable 8 Port Switch, Layer 2 manageable 12 Port Switch, Layer 2 Manageable 24 Port Switch, Layer 2 Manageable POE Plus 48 Port Switch, Layer 2 Manageable 48 Port Switch, Stacking module for 24 port switches L2, 1000 Base TX transceivers for copper 1000 Base TX, 1000 Base LX transceivers with LC connector 1000 Base LX, 10 Gig LR transceivers, 100 Gig SR4 transceiverfor 100 Gig SR4, Centralized Network Management System, WLC controller support, Dual Band access point WiFi 6, Tri radio mode access point, Dual Band access point WiFi 6 80211ax, Server with Hypervisor Visualization license, NU OnPremises Calling Enhanced license, IP Phone, IP Phone with touch screen, UTP cable CAT 6, 24 port Patch Panel CAT 6, Information outlets CAT 6, Faceplate Single port CAT 6, Patch Cord UTP CAT6 1 Meter, Patch Cord UTP CAT6 2 Meter, Patch Cord UTP CAT6 3 Meter for outdoor, Fiber Optic outdoor armoured cable 144 core, Fiber Optic outdoor armoured cable 6 core, 144 Core LIU, 24 Core LIU, 12 Core LIU, Simplex Fiber Pigtail 1 meter, Optical Fiber Patch Cord Length 3 m, Optical Fiber Patch Cord Length 10 m SM LCLC, Optical Fiber Patch Cord Length 10 m MM LC LC, Fibre optic joint Enclosure 8 round ports, Fibre optic joint Enclosure 4 round ports, Wire Manager Patch Chord Minder panel, Supply of Gang Box, 19 Rack 42 U height, 19 Rack 24 U height, 19 Rack 9 U height, 19 Rack Pole Mount Outdoor, PVC conduit of OD size 25 MM, PVC conduit of OD size 32 MM, PVC duct of size 25 into 25 MM, PVC duct of size 45 into 45 MM, HDPE PVC jacket 15 inch diameter, GI pipe 2 inch diameter, PVC Flexible Pipe 20 MM, PVC Flexible Pipe 32 MM, Armoured flexible pipe 40 MM, Tubular Pole, Laying of UTP CAT 6A CAT 6 cable STP Cable, Installation and Termination of information outlets, Installation and termination of UTP cables on Patch Panel, Performance testing, Installation of Jack Panel with cable manager, Installation of Gang box with Faceplate, Outdoor Laying of Fiber Cable, Fusion splicing of LC type pigtails, Supply and installation of buffer tubing kit, Performance testing OTDR Test report, Installation of LIU, Installation of floor mount Rack 24 42 U, Installation of wall mount Rack 9 U, Installation of Pole mount Rack 9 U, Installation of PVC conduit of OD size 25 mm, Installation of PVC conduit of OD size 32 mm, Installation of marked PVC duct of size 25 into 25 mm, Installation of marked PVC duct of size 45 into 45 mm, Installation of 15inch diameter HDPE PVC, Installation of GI pipe 2 inch underground and on surface, Installation of PVC flexible pipe of Size 20 MM, Installation of PVC flexible pipe of Size 32 MM, Installation of armoured Flexible Pipe 40 MM, Excavation and resurfacing, Supply and Installation of Fiber Optics cable, Cable pulling pit, Erection of MS Pole, Desktop, Laptop, LED Display, Smart Class Room Solution, Video Conference Solution, 1KVA Online UPS, 1KVA Online Rack mount, 6KVA Online UPS, Supply and Installation of 3 core electrical cable, Supply and Installation of Switch Socket and MCB, 5MP Fixed lens Dome Camera, 5MP VF Bullet Camera, 5MP PTZ camera, 128 Channel NVR, 12TB Surveillance grade HDDs, Technical Qualified Manpower in KODERMA, JHARKHAND. Quantity: 61070 issued by. Submission Deadline: 10-12-2025 13: 00: 00. View full details and respond.

Tender Data

Bid Details

Quantity

61070

Category

Smart Class Room Solution

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Router VOIP Gateway , Firewall , Endpoint Security Antivirus Solution , Subscription 500 end points , Layer 3 Switch 48 Port , Layer 2 manageable 8 Port Switch , Layer 2 manageable 12 Port Switch , Layer 2 Manageable 24 Port Switch , Layer 2 Manageable POE Plus 48 Port Switch , Layer 2 Manageable 48 Port Switch , Stacking module for 24 port switches L2 , 1000 Base TX transceivers for copper 1000 Base TX , 1000 Base LX transceivers with LC connector 1000 Base LX , 10 Gig LR transceivers , 100 Gig SR4 transceiverfor 100 Gig SR4 , Centralized Network Management System , WLC controller support , Dual Band access point WiFi 6 , Tri radio mode access point , Dual Band access point WiFi 6 80211ax , Server with Hypervisor Visualization license , NU OnPremises Calling Enhanced license , IP Phone , IP Phone with touch screen , UTP cable CAT 6 , 24 port Patch Panel CAT 6 , Information outlets CAT 6 , Faceplate Single port CAT 6 , Patch Cord UTP CAT6 1 Meter , Patch Cord UTP CAT6 2 Meter , Patch Cord UTP CAT6 3 Meter for outdoor , Fiber Optic outdoor armoured cable 144 core , Fiber Optic outdoor armoured cable 6 core , 144 Core LIU , 24 Core LIU , 12 Core LIU , Simplex Fiber Pigtail 1 meter , Optical Fiber Patch Cord Length 3 m , Optical Fiber Patch Cord Length 10 m SM LCLC , Optical Fiber Patch Cord Length 10 m MM LC LC , Fibre optic joint Enclosure 8 round ports , Fibre optic joint Enclosure 4 round ports , Wire Manager Patch Chord Minder panel , Supply of Gang Box , 19 Rack 42 U height , 19 Rack 24 U height , 19 Rack 9 U height , 19 Rack Pole Mount Outdoor , PVC conduit of OD size 25 MM , PVC conduit of OD size 32 MM , PVC duct of size 25 into 25 MM , PVC duct of size 45 into 45 MM , HDPE PVC jacket 15 inch diameter , GI pipe 2 inch diameter , PVC Flexible Pipe 20 MM , PVC Flexible Pipe 32 MM , Armoured flexible pipe 40 MM , Tubular Pole , Laying of UTP CAT 6A CAT 6 cable STP Cable , Installation and Termination of information outlets , Installation and termination of UTP cables on Patch Panel , Performance testing , Installation of Jack Panel with cable manager , Installation of Gang box with Faceplate , Outdoor Laying of Fiber Cable , Fusion splicing of LC type pigtails , Supply and installation of buffer tubing kit , Performance testing OTDR Test report , Installation of LIU , Installation of floor mount Rack 24 42 U , Installation of wall mount Rack 9 U , Installation of Pole mount Rack 9 U , Installation of PVC conduit of OD size 25 mm , Installation of PVC conduit of OD size 32 mm , Installation of marked PVC duct of size 25 into 25 mm , Installation of marked PVC duct of size 45 into 45 mm , Installation of 15inch diameter HDPE PVC , Installation of GI pipe 2 inch underground and on surface , Installation of PVC flexible pipe of Size 20 MM , Installation of PVC flexible pipe of Size 32 MM , Installation of armoured Flexible Pipe 40 MM , Excavation and resurfacing , Supply and Installation of Fiber Optics cable , Cable pulling pit , Erection of MS Pole , Desktop , Laptop , LED Display , Smart Class Room Solution , Video Conference Solution , 1KVA Online UPS , 1KVA Online Rack mount , 6KVA Online UPS , Supply and Installation of 3 core electrical cable , Supply and Installation of Switch Socket and MCB , 5MP Fixed lens Dome Camera , 5MP VF Bullet Camera , 5MP PTZ camera , 128 Channel NVR , 12TB Surveillance grade HDDs , Technical Qualified Manpower

Authority Records

MINISTRY OF ELECTRONICS AND INFORMATION TECHNOLOGYELECTRONICS AND INFORMATION TECHNOLOGY DEPARTMENTNATIONAL INFORMATICS CENTRE SERVICES INCORPORATED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8475089.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 101 Items Sign in for GEM prices

#1

Router VOIP Gateway

Router VOIP Gateway with PRI cards 5 years warranty support for Router Installation and Configuration of Router

2 nos Delivery: 119 days
#2

Firewall

Firewall network security appliance 5 years warranty support for Firewall Installation and Configuration of Firewall

2 nos Delivery: 119 days
#3

Endpoint Security Antivirus Solution

Endpoint Security Antivirus Solution 5 years warrantylicence support Installation and Configuration on the systems

2 nos Delivery: 119 days
#4

Subscription 500 end points

Subscription 500 end points scalable to 1000 via additional licenses

1 nos Delivery: 119 days
#5

Layer 3 Switch 48 Port

Layer 3 Switch 48 Port SFP with at least four 40100 G uplink ports 5 years warranty support for Layer 3 Switch 48 Port SFP Installation and Configuration of Layer 3 switch Redundant power supply with 5year warranty support for Layer 3 switch

2 nos Delivery: 119 days
#6

Layer 2 manageable 8 Port Switch

Layer 2 manageable 8 Port Switch with POE 5 years warranty support for Layer 2 switch Installation and Configuration of Layer 2 switch

12 nos Delivery: 119 days
#7

Layer 2 manageable 12 Port Switch

Layer 2 manageable 12 Port Switch with POE 101001000 Mbps with 2 SFP Uplink ports 5 years warranty support for Layer 2 switch Installation and Configuration of Layer 2 switch

10 nos Delivery: 119 days
#8

Layer 2 Manageable 24 Port Switch

Layer 2 Manageable 24 Port Switch with POE 10x100x1000 Mbps with 4 SFP Uplink ports and slot for stacking with support for 80Gbps or better stacking 5 years warranty support for Layer 2 switch Installation and Configuration of Layer 2 switch

4 nos Delivery: 119 days
#9

Layer 2 Manageable POE Plus 48 Port Switch

Layer 2 Manageable 48 Port Switch with POE 10x100x1000 Mbps with 4 SFP Uplink ports and slot for stacking with support for 80Gbps or better stacking 5 years warranty support for Layer 2 switch Installation and Configuration of Layer 2 switch

5 nos Delivery: 119 days
#10

Layer 2 Manageable 48 Port Switch

Layer 2 Manageable 48 Port Switch 10x100x1000 Mbps with 4 SFP Uplink ports and slot for stacking with support for 80Gbps or better stacking 5 years warranty support for Layer 2 switch Installation and Configuration of Layer 2 switch

3 nos Delivery: 119 days
#11

Stacking module for 24 port switches L2

Stacking module for 24 port switches L2 5 years warranty for Stacking module for 24 port switches L2

8 nos Delivery: 119 days
#12

1000 Base TX transceivers for copper 1000 Base TX

1000 Base TX transceivers for copper 5 years warranty for 1000 Base TX transceivers for copper

22 nos Delivery: 119 days
#13

1000 Base LX transceivers with LC connector 1000 Base LX

1000 Base LX transceivers with LC connector sm 5 years warranty for 1000 Base LX transceivers with LC connector sm

66 nos Delivery: 119 days
#14

10 Gig LR transceivers

10 Gig LR transceivers equivalent LC connector SM 5 years warranty for 10 Gig LR transceiversequivalent LC connector SM

114 nos Delivery: 119 days
#15

100 Gig SR4 transceiverfor 100 Gig SR4

100 Gig SR4 transceiver 5 years warranty for 100 Gig SR4 transceiver

4 nos Delivery: 119 days
#16

Centralized Network Management System

Centralized Network Management System NMS onprem or cloud with multivendor support 5 years warranty for SDN Controller Appliance for above 500 network elements Installation configuration and documentation of NMS SDN License

3 nos Delivery: 119 days
#17

WLC controller support

WLC controller support upto 250 Aps and 5K clients 5 years warranty support Installation and Configuration of WLC

2 nos Delivery: 119 days
#18

Dual Band access point WiFi 6

Dual Band access point with WiFi 6 technology 4x4 multiuser multipleinput multipleoutput MUMIMO technology supporting four spatial streams 5 years warranty support for Access Point Installation and Configuration of Indoor Access Point

38 nos Delivery: 119 days
#19

Tri radio mode access point

triradio mode access point with WiFi 6 technology 8x8 uplinkdownlink MUMIMO with eight spatial streams for Wireless coverage in the auditorium 5 years warranty support for Access Point Installation and Configuration of Indoor access point with external antenna

4 nos Delivery: 119 days
#20

Dual Band access point WiFi 6 80211ax

DualBand access point with WiFi 6 80211ax support featuring 4x4 multiuser multipleinput multipleoutput MUMIMO technology for Wireless coverage for the outdoor areas 5 years warranty support for Access Point Installation and Configuration of Outdoor access point with external antenna

15 nos Delivery: 119 days
#21

Server with Hypervisor Visualization license

Server with HypervisorVisualization license for IP telephony 5 years warranty support for IPT Appliance and VM license Installation and Configuration for Appliance and VM license

2 nos Delivery: 119 days
#22

NU OnPremises Calling Enhanced license

NU OnPremises Calling Enhanced license OnPremises SW Bundle v15 5 years warranty support for IP Telephony software and license Installation and Configuration of IP Telephony software and license

1 nos Delivery: 119 days
#23

IP Phone

IP Phone as per specs mentioned in the RFP 5 years warranty support for IP Phone Installation and Configuration of IP Phone

30 nos Delivery: 119 days
#24

IP Phone with touch screen

IP Phone with touch screen as per specs mentioned in the RFP 5 years warranty support for IP Phone Installation and Configuration of IP Phone

10 nos Delivery: 119 days
#25

UTP cable CAT 6

Supply of UTP cable CAT 6 305 Meter Box

60 box Delivery: 119 days
#26

24 port Patch Panel CAT 6

Supply of 24 port Patch Panel CAT 6 loaded with IO

29 nos Delivery: 119 days
#27

Information outlets CAT 6

Supply of Information outlets CAT 6

429 nos Delivery: 119 days
#28

Faceplate Single port CAT 6

Supply of Faceplate Single port CAT 6

429 nos Delivery: 119 days
#29

Patch Cord UTP CAT6 1 Meter

Supply of Patch Cord UTP CAT6 1 Meter

486 nos Delivery: 119 days
#30

Patch Cord UTP CAT6 2 Meter

Supply of Patch Cord UTP CAT6 2 Meter

372 nos Delivery: 119 days
#31

Patch Cord UTP CAT6 3 Meter for outdoor

Supply of Patch Cord UTP CAT6 3 Meter for outdoor

60 nos Delivery: 119 days
#32

Fiber Optic outdoor armoured cable 144 core

Supply of Fiber Optic outdoor armoured cable loose tube Single mode SM 10 G in meter 144 core

3,220 mtr Delivery: 119 days
#33

Fiber Optic outdoor armoured cable 6 core

Supply of Fiber Optic outdoor armoured cable loose tube Single mode SM 10 G in meter 6 core

5,510 mtr Delivery: 119 days
#34

144 Core LIU

Supply of 144 Core LIU SM loaded with Splice tray couplers etc

6 nos Delivery: 119 days
#35

24 Core LIU

Supply of 24 Core LIU SM loaded with Splice tray couplers etc

4 nos Delivery: 119 days
#36

12 Core LIU

Supply of 12 Core LIU SM loaded with Splice tray couplers etc

27 nos Delivery: 119 days
#37

Simplex Fiber Pigtail 1 meter

Supply of SM Simplex Fiber Pigtail 1 meter

1,284 nos Delivery: 119 days
#38

Optical Fiber Patch Cord Length 3 m

Supply of Optical Fiber Patch Cord SM LCLC Length 3 m

256 nos Delivery: 119 days
#39

Optical Fiber Patch Cord Length 10 m SM LCLC

Supply of Optical Fiber Patch Cord SM LCLC Length 10 m

10 nos Delivery: 119 days
#40

Optical Fiber Patch Cord Length 10 m MM LC LC

Supply of Optical Fiber Patch Cord MM LC LC OM4 Length 10 m

10 nos Delivery: 119 days
#41

Fibre optic joint Enclosure 8 round ports

Supply of Fibre optic joint Enclosure 1 oval port 2 cables 8 round ports

5 nos Delivery: 119 days
#42

Fibre optic joint Enclosure 4 round ports

Supply of Fibre optic joint Enclosure 1 oval port 2 cables 4 round ports

10 nos Delivery: 119 days
#43

Wire Manager Patch Chord Minder panel

Supply of Wire ManagerPatch Chord Minder panel

29 nos Delivery: 119 days
#44

Supply of Gang Box

Supply of Gang Box

429 nos Delivery: 119 days
#45

19 Rack 42 U height

Supply of 19 inch Rack Floor standing 8001000 mm depth 42 U

2 nos Delivery: 119 days
#46

19 Rack 24 U height

Supply of 19 inch Rack Floor standing 800800 mm depth 24 U height

2 nos Delivery: 119 days
#47

19 Rack 9 U height

Supply of 19 inch Rack Wall Mount 600 mm depth 9 U height

13 nos Delivery: 119 days
#48

19 Rack Pole Mount Outdoor

Supply of 19 inch Rack Pole Mount 600 mm depth 9 U height for Outdoor

11 nos Delivery: 119 days
#49

PVC conduit of OD size 25 MM

Supply of PVC conduit of OD size Per meter 25 MM

1,380 nos Delivery: 119 days
#50

PVC conduit of OD size 32 MM

Supply of PVC conduit of OD size Per meter 32 MM

2,320 mtr Delivery: 119 days
#51

PVC duct of size 25 into 25 MM

Supply of marked PVC duct of size Per meter 25X25 MM

2,016 mtr Delivery: 119 days
#52

PVC duct of size 45 into 45 MM

Supply of marked PVC duct of size Per meter 45X45 MM

720 mtr Delivery: 119 days
#53

HDPE PVC jacket 15 inch diameter

Supply of 15inch diameter HDPE PVC jacket underground or on surface per meter

5,110 mtr Delivery: 119 days
#54

GI pipe 2 inch diameter

Supply of GI pipe underground and on surface 2inch diameter

245 mtr Delivery: 119 days
#55

PVC Flexible Pipe 20 MM

Supply of PVC Flexible Pipe of Size Per Meter 20 MM

150 mtr Delivery: 119 days
#56

PVC Flexible Pipe 32 MM

Supply of PVC Flexible Pipe of Size Per Meter 32 MM

210 mtr Delivery: 119 days
#57

Armoured flexible pipe 40 MM

Supply of armoured flexible pipe of Size Per Meter 40 MM

180 mtr Delivery: 119 days
#58

Tubular Pole

Supply of Tubular Pole MildGalvanized Steel 12 Ft

11 nos Delivery: 119 days
#59

Laying of UTP CAT 6A CAT 6 cable STP Cable

Laying of UTP CAT 6A CAT 6 cable STP Cable per meter

2,100 mtr Delivery: 119 days
#60

Installation and Termination of information outlets

Installation Termination of information outlets including termination of CAT 6A CAT 6 STP cable on IO

429 nos Delivery: 119 days
#61

Installation and termination of UTP cables on Patch Panel

Installation termination of UTP cables on Patch Panel CAT 6 CAT 6A STP Cable with wire Manager

471 nos Delivery: 119 days
#62

Performance testing

Performance testing of the laid UTP CAT 6 CAT 6A STP cable Penta scanner report documentation per node

471 nos Delivery: 119 days
#63

Installation of Jack Panel with cable manager

Installation of Jack Panel with cable manager

29 nos Delivery: 119 days
#64

Installation of Gang box with Faceplate

Installation of Gang box with Faceplate

429 nos Delivery: 119 days
#65

Outdoor Laying of Fiber Cable

Outdoor Laying of Fiber Cable Per Meter

8,730 mtr Delivery: 119 days
#66

Fusion splicing of LC type pigtails

Fusion splicing of LC type pigtails

1,500 nos Delivery: 119 days
#67

Supply and installation of buffer tubing kit

Supply and installation of buffer tubing kit

1,500 nos Delivery: 119 days
#68

Performance testing OTDR Test report

Performance testing of laid Fiber Optic cable for continuity length dB loss OTDR Test report as per ANSITIA 45560 document for FO test procedures documentation of the results on per core basis

1,284 nos Delivery: 119 days
#69

Installation of LIU

Installation of LIU 612 244896144 fiber

37 nos Delivery: 119 days
#70

Installation of floor mount Rack 24 42 U

Installation of floor mount Rack 24 42 U with all accessories

4 nos Delivery: 119 days
#71

Installation of wall mount Rack 9 U

Installation of wall mount Rack 9 U with all accessories

13 nos Delivery: 119 days
#72

Installation of Pole mount Rack 9 U

Installation of Pole mount Rack 9 U with all accessories

11 nos Delivery: 119 days
#73

Installation of PVC conduit of OD size 25 mm

Installation of PVC conduit of OD size Per Meter 25 mm

1,380 mtr Delivery: 119 days
#74

Installation of PVC conduit of OD size 32 mm

Installation of PVC conduit of OD size Per Meter 32 mm

2,320 mtr Delivery: 119 days
#75

Installation of marked PVC duct of size 25 into 25 mm

Installation of marked PVC duct of size Per Meter 25 x 25 mm

2,016 mtr Delivery: 119 days
#76

Installation of marked PVC duct of size 45 into 45 mm

Installation of marked PVC duct of size Per Meter 45 x 45 mm

720 mtr Delivery: 119 days
#77

Installation of 15inch diameter HDPE PVC

Installation of 15inch diameter HDPE PVC jacket underground or on surface per meter

5,110 mtr Delivery: 119 days
#78

Installation of GI pipe 2 inch underground and on surface

Installation of GI pipe 2 inch underground and on surface

245 mtr Delivery: 119 days
#79

Installation of PVC flexible pipe of Size 20 MM

Installation of PVC flexible pipe of Size Per Meter 20 MM

150 mtr Delivery: 119 days
#80

Installation of PVC flexible pipe of Size 32 MM

Installation of PVC flexible pipe of Size Per Meter 32 MM

210 mtr Delivery: 119 days
#81

Installation of armoured Flexible Pipe 40 MM

Installation of armoured Flexible Pipe Outdoor 40 MM

180 mtr Delivery: 119 days
#82

Excavation and resurfacing

Excavation and resurfacing of the soilconcreteTrenchless digging depth 1 mtr

5,110 mtr Delivery: 119 days
#83

Supply and Installation of Fiber Optics cable

Supply and Installation of Fiber Optics cable route marker per unit

103 nos Delivery: 119 days
#84

Cable pulling pit

Cable pulling pit minimum size 222 feet made of reinforced concrete and brick walls with removable covers per unit

33 nos Delivery: 119 days
#85

Erection of MS Pole

Erection of MS Pole along with pole mounting of outdoor AP and preparation of base plinth made of reinforced concrete brick

11 nos Delivery: 119 days
#86

Desktop

Intel Core i7 12700 or AMD Ryzen 7 5700G, 16GB RAM, 1 TB ssd

170 nos Delivery: 119 days
#87

Laptop

Intel Core i7 or latest generation or AMD Ryzen7 or better, 16GB RAM, 1TB SSD

5 nos Delivery: 119 days
#88

LED Display

LED Display with Standard Warranty for both NOC Rooms Senior Master Room Conference room

5 nos Delivery: 119 days
#89

Smart Class Room Solution

Smart Class Room Solution with Standard Warranty must include all accessories support device

7 nos Delivery: 119 days
#90

Video Conference Solution

Video Conference Solution with Standard Warranty

1 nos Delivery: 119 days
#91

1KVA Online UPS

1KVA Online UPS with inbuilt battery for Access Rack

14 nos Delivery: 119 days
#92

1KVA Online Rack mount

1KVA Online Rack mount UPS with inbuilt battery for Outdoor Rack with 5 Years warranty Support on UPS and Batteries

11 nos Delivery: 119 days
#93

6KVA Online UPS

6KVA Online UPS with battery for NOC Rack

2 nos Delivery: 119 days
#94

Supply and Installation of 3 core electrical cable

Supply Installation of 3 core electrical cable 25mm

700 mtr Delivery: 119 days
#95

Supply and Installation of Switch Socket and MCB

Supply Installation of Switch Socket MCB etc

18 nos Delivery: 119 days
#96

5MP Fixed lens Dome Camera

5MP Fixed lens Dome Camera With 3 Years warranty Support

40 nos Delivery: 119 days
#97

5MP VF Bullet Camera

5MP VF Bullet Camera With 5 Years warranty Support

75 nos Delivery: 119 days
#98

5MP PTZ camera

5MP PTZ camera With 5 Years warranty Support

5 nos Delivery: 119 days
#99

128 Channel NVR

128 Channel NVR With 5 Years warranty Support

2 nos Delivery: 119 days
#100

12TB Surveillance grade HDDs

12TB Surveillance grade HDDs With 5 Years warranty Support

20 nos Delivery: 119 days
#101

Technical Qualified Manpower

Technical Qualified Manpower to Manage Network Operation Centre L1 L2 support engineers for 5 years

2 nos Delivery: 1,825 days

Corrigendum Updates

10 Updates
#1

Update

08-Dec-2025

Extended Deadline

10-Dec-2025, 7:30 am

Opening Date

10-Dec-2025, 8:00 am

#2

Update

28-Nov-2025
#3

Update

28-Nov-2025

Extended Deadline

05-Dec-2025, 12:30 pm

Opening Date

05-Dec-2025, 1:00 pm

#4

Update

25-Nov-2025
#5

Update

25-Nov-2025

Extended Deadline

02-Dec-2025, 12:30 pm

Opening Date

02-Dec-2025, 1:00 pm

#6

Update

24-Nov-2025

Extended Deadline

01-Dec-2025, 12:30 pm

Opening Date

01-Dec-2025, 1:00 pm

#7

Update

13-Nov-2025

Extended Deadline

20-Nov-2025, 12:30 pm

Opening Date

20-Nov-2025, 1:00 pm

#8

Update

06-Nov-2025

Extended Deadline

13-Nov-2025, 12:30 pm

Opening Date

13-Nov-2025, 1:00 pm

#9

Update

21-Oct-2025
#10

Update

17-Oct-2025

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria

3

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer