Contract Bidding Open For boiler fabrication work 1,boiler fabrication work 2,boiler fabrication work 3,boiler fabrication wo in BIJNOR, UTTAR PRADESH

Bid Publish Date

25-Aug-2026, 4:12 pm

Bid End Date

04-Sep-2026, 5:00 pm

Value

₹4,50,000

Location

BIJNOR , UTTAR PRADESH

Progress

Issue25-Aug-2026, 4:12 pm
AwardPending

N/a announces a tender for boiler fabrication work 1, boiler fabrication work 2, boiler fabrication work 3, boiler fabrication work 4, boiler fabrication work 5, boiler fabrication work 6, boiler fabrication work 7, boiler fabrication work 8, boiler fabrication work 9, boiler fabrication work 10, boiler fabrication work 11, boiler fabrication work 12, boiler fabrication work 13, boiler fabrication work 14, boiler fabrication work 15, boiler fabrication work 16, boiler fabrication work 17, boiler fabrication work 18 in BIJNOR, UTTAR PRADESH. Quantity: 552. Submission Deadline: 04-09-2026 17: 00: 00. Last date to apply is approaching fast!

Tender Data

Bid Details

Quantity

552

Category

boiler fabrication work 1

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

2

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

boiler fabrication work 1 , boiler fabrication work 2 , boiler fabrication work 3 , boiler fabrication work 4 , boiler fabrication work 5 , boiler fabrication work 6 , boiler fabrication work 7 , boiler fabrication work 8 , boiler fabrication work 9 , boiler fabrication work 10 , boiler fabrication work 11 , boiler fabrication work 12 , boiler fabrication work 13 , boiler fabrication work 14 , boiler fabrication work 15 , boiler fabrication work 16 , boiler fabrication work 17 , boiler fabrication work 18

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Bijnor

Delivery Pincodes

246763

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Anurag Singh246763,KISAN SAHKARI CHINI MILLS LTD., Sneh Road Najibabad PIN CODE- 246763 GST NO - 09AAAAK1634P1ZD Contact no- 9411427852,6397805612BijnorUttar Pradesh24676317260-

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9794541.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

N/a

Office Name

Lucknow

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 18 Items Sign in for GEM prices

#1

boiler fabrication work 1

Replace the old runner of the bagasse elevator, bagasse carrier, and return bagasse carrier, and install a new runner.

172 per meter Delivery: 60 days
#2

boiler fabrication work 2

Cut and remove the bottom plate of the bagasse elevator, bagasse carrier, and return bagasse carrier, and replace it with the supplied 6 mm plate.

67 meter square Delivery: 60 days
#3

boiler fabrication work 3

Remove the damaged side plate of the boiler and replace it with a 3/5 mm plate.

90 meter square Delivery: 60 days
#4

boiler fabrication work 4

Cut and remove the expansion joint installed in the boiler flue gas ducting, fabricate a new one from a 3/5 mm plate, and install it.

8 each Delivery: 60 days
#5

boiler fabrication work 5

Cut and remove the damaged casing of the bagasse fan, fabricate a new one from the supplied 8 mm MS plate, and install it.

1 each Delivery: 60 days
#6

boiler fabrication work 6

Remove the damaged angle/channel installed beneath the bagasse elevator, bagasse carrier, and return bagasse carrier, and replace it with a new angle/channel.

102 per meter Delivery: 60 days
#7

boiler fabrication work 7

Cut and remove the damaged furnace chute of Boiler No. 2, fabricate a new one from a 6/8 mm plate, and install it.

2 each Delivery: 60 days
#8

boiler fabrication work 8

Cut and remove the damaged casing of the boiler ID fan, fabricate a new one from the supplied 6 mm plate, and install it.

16 per meter Delivery: 60 days
#9

boiler fabrication work 9

Cut and dismantle the suction cone of the ID fan installed on the boiler, fabricate a new section cone from a 6 mm MS plate, and install it.

2 each Delivery: 60 days
#10

boiler fabrication work 10

Cut and remove the damaged plate and flue gas duct of the boiler wet scrubber, replace them with the supplied 3/5 mm plate, and carry out strengthening.

1 lumpsum Delivery: 60 days
#11

boiler fabrication work 11

Cut and remove the damaged manhole (size 400 mm X 400 mm) of the boiler wet scrubber, fabricate a new one, and install it.

8 pcdn Delivery: 60 days
#12

boiler fabrication work 12

Cut and remove the worn-out chute of the boiler bagasse feeder, fabricate a new one from the supplied MS plate, and install it.

30 per meter Delivery: 60 days
#13

boiler fabrication work 13

Dismantle the damaged pipeline at various locations in the boiler house, dispose of it in the scrap yard, and install a new 6-inch pipeline.

12 pcdm Delivery: 60 days
#14

boiler fabrication work 14

Dismantle the damaged pipeline at various locations in the boiler house, dispose of it in the scrap yard, and install a new 4-inch pipeline.

12 pcdm Delivery: 60 days
#15

boiler fabrication work 15

Fabricate and install 6-inch bends at various locations in the boiler house.

6 pcdn Delivery: 60 days
#16

boiler fabrication work 16

Fabricate and install 4-inch bends at various locations in the boiler house.

6 pcdn Delivery: 60 days
#17

boiler fabrication work 17

Fabricate and install 6-inch flanges at various locations in the boiler house.

8 pcdn Delivery: 60 days
#18

boiler fabrication work 18

Fabricate and install 4-inch flanges at various locations in the boiler house.

8 pcdn Delivery: 60 days

Categories 25

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer