Bid Publish Date
25-Aug-2026, 4:12 pm
Bid End Date
04-Sep-2026, 5:00 pm
Value
₹4,50,000
Location
Progress
N/a announces a tender for boiler fabrication work 1, boiler fabrication work 2, boiler fabrication work 3, boiler fabrication work 4, boiler fabrication work 5, boiler fabrication work 6, boiler fabrication work 7, boiler fabrication work 8, boiler fabrication work 9, boiler fabrication work 10, boiler fabrication work 11, boiler fabrication work 12, boiler fabrication work 13, boiler fabrication work 14, boiler fabrication work 15, boiler fabrication work 16, boiler fabrication work 17, boiler fabrication work 18 in BIJNOR, UTTAR PRADESH. Quantity: 552. Submission Deadline: 04-09-2026 17: 00: 00. Last date to apply is approaching fast!
Quantity
552
Category
boiler fabrication work 1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
boiler fabrication work 1 , boiler fabrication work 2 , boiler fabrication work 3 , boiler fabrication work 4 , boiler fabrication work 5 , boiler fabrication work 6 , boiler fabrication work 7 , boiler fabrication work 8 , boiler fabrication work 9 , boiler fabrication work 10 , boiler fabrication work 11 , boiler fabrication work 12 , boiler fabrication work 13 , boiler fabrication work 14 , boiler fabrication work 15 , boiler fabrication work 16 , boiler fabrication work 17 , boiler fabrication work 18
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Bijnor
Delivery Pincodes
246763
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Anurag Singh | 246763,KISAN SAHKARI CHINI MILLS LTD., Sneh Road Najibabad PIN CODE- 246763 GST NO - 09AAAAK1634P1ZD Contact no- 9411427852,6397805612 | Bijnor | Uttar Pradesh | 246763 | 172 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
boiler fabrication work 1
Replace the old runner of the bagasse elevator, bagasse carrier, and return bagasse carrier, and install a new runner.
boiler fabrication work 2
Cut and remove the bottom plate of the bagasse elevator, bagasse carrier, and return bagasse carrier, and replace it with the supplied 6 mm plate.
boiler fabrication work 3
Remove the damaged side plate of the boiler and replace it with a 3/5 mm plate.
boiler fabrication work 4
Cut and remove the expansion joint installed in the boiler flue gas ducting, fabricate a new one from a 3/5 mm plate, and install it.
boiler fabrication work 5
Cut and remove the damaged casing of the bagasse fan, fabricate a new one from the supplied 8 mm MS plate, and install it.
boiler fabrication work 6
Remove the damaged angle/channel installed beneath the bagasse elevator, bagasse carrier, and return bagasse carrier, and replace it with a new angle/channel.
boiler fabrication work 7
Cut and remove the damaged furnace chute of Boiler No. 2, fabricate a new one from a 6/8 mm plate, and install it.
boiler fabrication work 8
Cut and remove the damaged casing of the boiler ID fan, fabricate a new one from the supplied 6 mm plate, and install it.
boiler fabrication work 9
Cut and dismantle the suction cone of the ID fan installed on the boiler, fabricate a new section cone from a 6 mm MS plate, and install it.
boiler fabrication work 10
Cut and remove the damaged plate and flue gas duct of the boiler wet scrubber, replace them with the supplied 3/5 mm plate, and carry out strengthening.
boiler fabrication work 11
Cut and remove the damaged manhole (size 400 mm X 400 mm) of the boiler wet scrubber, fabricate a new one, and install it.
boiler fabrication work 12
Cut and remove the worn-out chute of the boiler bagasse feeder, fabricate a new one from the supplied MS plate, and install it.
boiler fabrication work 13
Dismantle the damaged pipeline at various locations in the boiler house, dispose of it in the scrap yard, and install a new 6-inch pipeline.
boiler fabrication work 14
Dismantle the damaged pipeline at various locations in the boiler house, dispose of it in the scrap yard, and install a new 4-inch pipeline.
boiler fabrication work 15
Fabricate and install 6-inch bends at various locations in the boiler house.
boiler fabrication work 16
Fabricate and install 4-inch bends at various locations in the boiler house.
boiler fabrication work 17
Fabricate and install 6-inch flanges at various locations in the boiler house.
boiler fabrication work 18
Fabricate and install 4-inch flanges at various locations in the boiler house.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | boiler fabrication work 1 | Replace the old runner of the bagasse elevator, bagasse carrier, and return bagasse carrier, and install a new runner. | 172 | per meter | buyer10.cdgvvdup.up | 60 | |
| 2 | boiler fabrication work 2 | Cut and remove the bottom plate of the bagasse elevator, bagasse carrier, and return bagasse carrier, and replace it with the supplied 6 mm plate. | 67 | meter square | buyer10.cdgvvdup.up | 60 | |
| 3 | boiler fabrication work 3 | Remove the damaged side plate of the boiler and replace it with a 3/5 mm plate. | 90 | meter square | buyer10.cdgvvdup.up | 60 | |
| 4 | boiler fabrication work 4 | Cut and remove the expansion joint installed in the boiler flue gas ducting, fabricate a new one from a 3/5 mm plate, and install it. | 8 | each | buyer10.cdgvvdup.up | 60 | |
| 5 | boiler fabrication work 5 | Cut and remove the damaged casing of the bagasse fan, fabricate a new one from the supplied 8 mm MS plate, and install it. | 1 | each | buyer10.cdgvvdup.up | 60 | |
| 6 | boiler fabrication work 6 | Remove the damaged angle/channel installed beneath the bagasse elevator, bagasse carrier, and return bagasse carrier, and replace it with a new angle/channel. | 102 | per meter | buyer10.cdgvvdup.up | 60 | |
| 7 | boiler fabrication work 7 | Cut and remove the damaged furnace chute of Boiler No. 2, fabricate a new one from a 6/8 mm plate, and install it. | 2 | each | buyer10.cdgvvdup.up | 60 | |
| 8 | boiler fabrication work 8 | Cut and remove the damaged casing of the boiler ID fan, fabricate a new one from the supplied 6 mm plate, and install it. | 16 | per meter | buyer10.cdgvvdup.up | 60 | |
| 9 | boiler fabrication work 9 | Cut and dismantle the suction cone of the ID fan installed on the boiler, fabricate a new section cone from a 6 mm MS plate, and install it. | 2 | each | buyer10.cdgvvdup.up | 60 | |
| 10 | boiler fabrication work 10 | Cut and remove the damaged plate and flue gas duct of the boiler wet scrubber, replace them with the supplied 3/5 mm plate, and carry out strengthening. | 1 | lumpsum | buyer10.cdgvvdup.up | 60 | |
| 11 | boiler fabrication work 11 | Cut and remove the damaged manhole (size 400 mm X 400 mm) of the boiler wet scrubber, fabricate a new one, and install it. | 8 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 12 | boiler fabrication work 12 | Cut and remove the worn-out chute of the boiler bagasse feeder, fabricate a new one from the supplied MS plate, and install it. | 30 | per meter | buyer10.cdgvvdup.up | 60 | |
| 13 | boiler fabrication work 13 | Dismantle the damaged pipeline at various locations in the boiler house, dispose of it in the scrap yard, and install a new 6-inch pipeline. | 12 | pcdm | buyer10.cdgvvdup.up | 60 | |
| 14 | boiler fabrication work 14 | Dismantle the damaged pipeline at various locations in the boiler house, dispose of it in the scrap yard, and install a new 4-inch pipeline. | 12 | pcdm | buyer10.cdgvvdup.up | 60 | |
| 15 | boiler fabrication work 15 | Fabricate and install 6-inch bends at various locations in the boiler house. | 6 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 16 | boiler fabrication work 16 | Fabricate and install 4-inch bends at various locations in the boiler house. | 6 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 17 | boiler fabrication work 17 | Fabricate and install 6-inch flanges at various locations in the boiler house. | 8 | pcdn | buyer10.cdgvvdup.up | 60 | |
| 18 | boiler fabrication work 18 | Fabricate and install 4-inch flanges at various locations in the boiler house. | 8 | pcdn | buyer10.cdgvvdup.up | 60 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer