TenderDekho Logo
Closed GEM

Indian Army Bearing & Engine Spare Parts Tender Meerut Uttar Pradesh 2026 – ISI/AAA/TRTL Standards and 3-Year Warranty

Bid Publish Date

29-Aug-2026, 1:48 pm

Bid End Date

14-Sep-2026, 2:00 pm

Generate Docs

Progress

Issue29-Aug-2026, 1:48 pm
Corrigendum09-Sep-2026
AwardPending

Key Highlights

  • • Critical brand/OEM requirement: OEM warranty certificates required at delivery
  • • Technical standards: 3-year OEM warranty, ISI/AAA/TRTL/AAA-grade considerations implied by item list
  • • Delivery flexibility: Quantity adjustments up to 25% with corresponding delivery recalculation
  • • Service infrastructure: Functional Service Centre in each consignee state or establishment within 30 days

Tender Overview

The opportunity is issued by the Indian Army, Department Of Military Affairs, for a comprehensive supply package of engine and hydraulic components including bearings, injector assemblies, piston rings, seals, gaskets, air compressor repair kits, hydraulic hoses, solenoid valves, harnesses and related items for deployment at Meerut, Uttar Pradesh. The procurement scope includes supply, installation, testing, commissioning and operator training, with statutory clearance where applicable. A multi-item catalog across 24 BOQ items indicates a broad maintenance and overhaul capability, requiring OEM warranty and post-sale service support within the state. A key differentiator is the requirement for a functional service centre in each consignee location and a 3-year warranty across supplied goods.

Technical Specifications & Requirements

  • No explicit technical specifications are listed in the tender data; however, the category includes bearings, injectors, piston rings, seals, gaskets, air cleaner elements, hydraulic hoses, filter elements, starter relays, pumps, armatures, field coils and harnesses.
  • The scope includes supply, installation, testing, commissioning and operator training, plus statutory clearances if needed.
  • Warranty: 3 years from final acceptance; OEM warranty certificates must be submitted at delivery.
  • Service: Functional service centres required in each consignee state; establishment within 30 days of award if not existing.
  • Financials: Turnover criteria apply; three-year average turnover must meet bid document thresholds; audited statements or CA certificates to be uploaded.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity up to 25% during and after contract with adjusted delivery timelines. Minimum 30 days extra delivery if extended.
  • Scope of Supply: Bid price must cover all costs including installation, testing, commissioning and operator training; statutory clearances if required.
  • Warranty: 3-year warranty from final acceptance; OEM certificates to be submitted at delivery; rectification of breakdowns during guarantee.
  • Service Centre: Must have functional service centre in each consignee state, or establish within 30 days of award.
  • Turnover: Minimum average annual turnover for last three financial years must meet specified thresholds in the bid document; provide audited balance sheets or CA certificates.

Key Specifications

  • Product/service names: bearings, injector assemblies, piston rings, piston seals, engine gasket sets, air compressor repair kits, hydraulic hoses, filter elements, starter relays, pumps, armatures, field coils, harnesses

  • Quantities/volumes: 24 items listed in BOQ; exact quantities not disclosed in provided data

  • EMD/estimated value: Not specified in tender data

  • Experience: required turnover as per bid document; three-year average turnover validation

  • Quality/standards: OEM warranty; IS/industry standards implied by equipment category; ISI/AAA/TRTL conformance may be referenced

  • Delivery/installation: Supply, installation, testing, commissioning; training of operators; statutory clearances if any

Terms & Conditions

  • Option to adjust quantity by up to 25% during contract with revised delivery timelines

  • 30-day minimum extension for extended delivery period; calculated extension formula applies

  • Mandatory OEM warranty certificates at delivery; 3-year warranty window

  • Functional service centre required in each consignee state; establishment within 30 days if absent

  • Turnover criteria: three-year average turnover to meet bid thresholds with audited documents

Important Clauses

Payment Terms

Payment provisions are aligned with delivery/acceptance milestones; no explicit percentage terms provided in data

Delivery Schedule

Delivery commences from last date of original delivery order; option-driven extension follows calculated formula with minimum 30 days

Penalties/Liquidated Damages

LD terms are not specifically detailed in the available data; penalties may be implied through delivery extensions and acceptance delays

Bidder Eligibility

  • Must meet turnover criteria as per bid document with three-year financials

  • Must have or establish functional service centre in each consignee state within 30 days of award

  • Submit OEM authorization and warranty documents; provide OEM certificates at delivery

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

49

Category

FIP Overhaul kit

Bid Type

Two Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

20 %

Warranty Period

3 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Bearing , Injector assy , Piston ring , Piston seal , Piston , Engine gasket set complete , Air compressor rep kit , FIP Overhaul kit , Seal kit for 332Y7056 , Armature , Field coil , Filter element assy , Filter element oil , Element air cleaner , Starter relay , Feed pump , Connecting rod , Eng mounting pad , Hydraulic filter , Hydraulic hose , Hydraulic hose 915 , Solenoid valve secondary , Front console harness

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Meerut

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-MeerutMeerut--215-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9821064.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 24 Items Sign in for GEM prices

#1

Bearing

Bearing

2 nos Delivery: 15 days
#2

Bearing

Bearing

2 nos Delivery: 15 days
#3

Injector assy

Injector assy

4 nos Delivery: 15 days
#4

Piston ring

Piston ring

4 nos Delivery: 15 days
#5

Piston seal

Piston seal

4 nos Delivery: 15 days
#6

Piston

Piston

4 nos Delivery: 15 days
#7

Engine gasket set complete

Engine gasket set complete

1 nos Delivery: 15 days
#8

Air compressor rep kit

Air compressor rep kit

1 nos Delivery: 15 days
#9

FIP Overhaul kit

FIP Overhaul kit

1 nos Delivery: 15 days
#10

Seal kit for 332Y7056

Seal kit for 332Y7056

1 nos Delivery: 15 days
#11

Armature

Armature

2 nos Delivery: 15 days
#12

Field coil

Field coil

2 nos Delivery: 15 days
#13

Filter element assy

Filter element assy

1 nos Delivery: 15 days
#14

Filter element oil

Filter element oil

1 nos Delivery: 15 days
#15

Element air cleaner

Element air cleaner

2 nos Delivery: 15 days
#16

Starter relay

Starter relay

1 nos Delivery: 15 days
#17

Feed pump

Feed pump

1 nos Delivery: 15 days
#18

Connecting rod

Connecting rod

4 nos Delivery: 15 days
#19

Eng mounting pad

Eng mounting pad

4 nos Delivery: 15 days
#20

Hydraulic filter

Hydraulic filter

1 nos Delivery: 15 days
#21

Hydraulic hose

Hydraulic hose

2 nos Delivery: 15 days
#22

Hydraulic hose 915

Hydraulic hose 915

2 nos Delivery: 15 days
#23

Solenoid valve secondary

Solenoid valve secondary

1 nos Delivery: 15 days
#24

Front console harness

Front console harness

1 nos Delivery: 15 days
Advertisement

Categories 46

Corrigendum Updates

2 Updates
#1

Update

09-Sep-2026

Extended Deadline

14-Sep-2026, 8:30 am

Opening Date

15-Sep-2026, 8:30 am

#2

Update

09-Sep-2026

Extended Deadline

11-Sep-2026, 5:30 am

Opening Date

12-Sep-2026, 5:30 am

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements or CA certificate showing three-year turnover

4

Experience certificates (similar prior supply/maintenance) if applicable

5

OEM authorization letter (if bidding through reseller/partner)

6

Technical compliance certificates or OEM datasheets (if provided)

7

Warranty certificates from OEM

8

Any statutory clearances or approvals related to installation/commissioning

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for Indian Army bearing and engine spare parts tender in Meerut 2026

Bidders must submit GST, PAN, three-year turnover evidence, and OEM authorizations if bidding via a partner. Include OEM warranty certificates and technical compliance documents. Ensure service centre readiness in each consignee state or plan establishment within 30 days of award; include installation and commissioning costs in the bid.

What documents are required for the Indian Army oil and bearing tender in Meerut

Required documents include GST certificate, PAN, audited financial statements or CA certificate for turnover, experience certificates of similar work, OEM authorizations, technical compliance certificates, and OEM warranty certificates. Also provide service centre evidence and installation/commissioning plan if applicable.

What are the delivery and warranty requirements for Meerut engine parts

Delivery timing follows the last date of the original delivery order with a 25% quantity option and minimum 30 days additional time. A 3-year OEM warranty applies from final acceptance; warranty certificates must accompany delivery, and rectification of breakdowns is required during the period.

How to demonstrate turnover eligibility for the Indian Army tender

Submit audited balance sheets for the last three financial years or a CA certificate detailing turnover. If the bidder is less than three years old, use completed-year turnover. The bid document specifies minimum average turnover requirements; provide calculations accordingly.

What is required for post-sale service in the Meerut procurement

Bidder must have a functional service centre in each consignee state or establish one within 30 days of award. Payment release is contingent on documentary evidence of the service centre’s functionality and ongoing support capabilities.

Which components are included under the 24-item BOQ category

The scope covers bearings, injector assemblies, piston rings, piston seals, engine gasket sets, air compressor repair kits, filter elements, hydraulic hoses and fittings, starter relays, pumps, armatures, field coils, and harnesses. Exact item quantities are not disclosed; supplier must price inclusive of installation and training.

Advertisement