Progress
Product names: UPS 1KVA, 19" Monitor, 12 V 7AH Battery, NVME 256GB, Intel i3 9th Gen
Quantities: 5 total items, exact numbers not disclosed (N/A in BOQ)
Estimated value: Not specified
Experience: Not specified in tender data
Standards/Compliance: Not specified; assume ISI/IS standards and government IT procurement norms
Delivery: Based on last delivery order date; extended delivery time formula with minimum 30 days
Option Clause: up to 25% quantity variation at contract placement and during currency
Delivery schedule tied to last delivery order with proportional extension
BOQ items show N/A quantities; final technical specs to be clarified by authority
Not specified; bidders should confirm standard government terms and any advance or milestone payments during bid clarification
Delivery period begins from last date of original delivery order; extended time computed as (Increased/Original) × Original period, minimum 30 days
Not specified; bidders to verify LD or performance bond details during clarification with Indian Army
Experience in supplying mixed IT hardware and backup power equipment
Capability to handle OEM-branded components (UPS, monitors, storage, CPUs)
Compliance with standard GST/PAN and financial stability requirements
Quantity
10
Category
Processor Intel i3 9th Gen
Bid Type
Two Packet Bid
Bid Validity
15 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
UPS 1KVA , Monitor 19 Inches , Bty 12 V 7AH , NVME 256 GB , Processor Intel i3 9th Gen
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Sonitpur
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Sonitpur | Sonitpur | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
UPS 1KVA
UPS 1KVA
Monitor 19 Inches
Monitor 19 Inches
Bty 12 V 7AH
Bty 12 V 7AH
NVME 256 GB
NVME 256 GB
Processor Intel i3 9th Gen
Processor Intel i3 9th Gen
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | UPS 1KVA | UPS 1KVA | 1 | nos | sahoo@189 | 15 | |
| 2 | Monitor 19 Inches | Monitor 19 Inches | 1 | nos | sahoo@189 | 15 | |
| 3 | Bty 12 V 7AH | Bty 12 V 7AH | 6 | nos | sahoo@189 | 15 | |
| 4 | NVME 256 GB | NVME 256 GB | 1 | nos | sahoo@189 | 15 | |
| 5 | Processor Intel i3 9th Gen | Processor Intel i3 9th Gen | 1 | nos | sahoo@189 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar IT/hardware supply
Financial statements (recent balance sheet and P&L)
EMD/Security deposit documents (as per bidder terms, if applicable)
Technical bid document showing product specifications and compliance
OEM authorization letters for branded components (UPS, monitors, SSDs, CPUs) if required
Key insights about ASSAM tender market
Bidders should submit GST and PAN, along with technical bid for each item: UPS 1KVA, 19" monitor, 12V 7AH battery, NVME 256GB, and Intel i3 9th Gen systems. Include OEM authorizations and experience certificates; verify EMD requirements and delivery terms during clarification.
Prepare GST certificate, PAN, company financial statements, recent experience certificates for similar supply, technical compliance documents, OEM authorization letters, and EMD/security deposit proofs if applicable; ensure submission aligns with terms and conditions and includes product-specific certifications.
Delivery begins from the last date of the original delivery order; if quantity increases by 25%, extension time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Confirm final delivery schedule during bid clarification.
While specific standards are not listed, bidders should align with government IT procurement norms and supply-branded components with OEM authorizations. Ensure compliance with applicable quality and safety standards for UPS, displays, batteries, and NVMe storage.
The tender data does not disclose an EMD amount; bidders must check the official tender documents or contact the procuring authority to obtain exact EMD or security deposit requirements before submission.
Eligibility requires demonstrated capability to supply branded Intel i3 9th Gen processors with compatible motherboards and storage, plus related peripherals; provide prior procurement experience and OEM authorizations to prove technical suitability for military-grade hardware.
BOQ lists 5 items: UPS 1KVA, 19" monitor, 12V 7AH battery, NVME 256GB, and Intel i3 9th Gen system. Quantities are not disclosed in the data; final quantities will be defined in the issued bid documents and delivery orders.